메뉴 건너뛰기




Volumn 42, Issue 1, 1996, Pages 19-36

Lot sizing in serial assembly systems with multiple constrained resources

Author keywords

Heuristics; Lot Sizing; Serial Systems

Indexed keywords

ASSEMBLY; COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; HEURISTIC METHODS; LINEAR PROGRAMMING; OPERATIONS RESEARCH; OPTIMIZATION; PERFORMANCE; PROBLEM SOLVING;

EID: 0029775454     PISSN: 00251909     EISSN: None     Source Type: Journal    
DOI: 10.1287/mnsc.42.1.19     Document Type: Article
Times cited : (28)

References (31)
  • 1
    • 0025701560 scopus 로고
    • A Benders Decomposition Based Heuristic for the Hierarchical Production Planning Problem
    • Aardal, K. and T. Larsson, "A Benders Decomposition Based Heuristic for the Hierarchical Production Planning Problem," European J. Oper. Res., 45, 1 (1990), 4-14.
    • (1990) European J. Oper. Res. , vol.45 , Issue.1 , pp. 4-14
    • Aardal, K.1    Larsson, T.2
  • 2
    • 0022672722 scopus 로고
    • Optimal Lot-Sizing Algorithms for Complex Product Structures
    • Afentakis, P. and B. Gavish, "Optimal Lot-Sizing Algorithms for Complex Product Structures," Oper. Res., 34, 2 (1986), 237-249.
    • (1986) Oper. Res. , vol.34 , Issue.2 , pp. 237-249
    • Afentakis, P.1    Gavish, B.2
  • 3
    • 0021376670 scopus 로고
    • Computational Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
    • Afentakis, P., B. Gavish, and U. Karmarkar, "Computational Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems," Management Sci., 30, 2 (1984), 222-239.
    • (1984) Management Sci. , vol.30 , Issue.2 , pp. 222-239
    • Afentakis, P.1    Gavish, B.2    Karmarkar, U.3
  • 4
    • 4243068262 scopus 로고
    • A Simulation Study of Hierarchical Production-Inventory Control
    • Andersson, H., H. Jonsson, and S. Axsater, "A Simulation Study of Hierarchical Production-Inventory Control," OR Spektrum, 2 (1980), 79-89.
    • (1980) OR Spektrum , vol.2 , pp. 79-89
    • Andersson, H.1    Jonsson, H.2    Axsater, S.3
  • 5
    • 0021494719 scopus 로고
    • Aggregation and Disaggregation in Hierarchical Production Planning
    • Axsater, S. and H. Jonsson, "Aggregation and Disaggregation in Hierarchical Production Planning," European J. Oper. Res., 17 (1984), 338-350.
    • (1984) European J. Oper. Res. , vol.17 , pp. 338-350
    • Axsater, S.1    Jonsson, H.2
  • 6
    • 0021428250 scopus 로고
    • An Interactive Model for Master Scheduling, Lot Sizing and Capacity Requirements Planning
    • Bahl, H. C. and L. P. Ritzman, "An Interactive Model for Master Scheduling, Lot Sizing and Capacity Requirements Planning," J. Oper. Res. Society, 35, 5 (1984), 389-399.
    • (1984) J. Oper. Res. Society , vol.35 , Issue.5 , pp. 389-399
    • Bahl, H.C.1    Ritzman, L.P.2
  • 7
    • 0023343841 scopus 로고
    • Determining Lot Sizes and Resource Requirements: A Review
    • _, _, and J. N. D. Gupta, "Determining Lot Sizes and Resource Requirements: A Review," Oper. Res., 35, 3 (1987), 329-345.
    • (1987) Oper. Res. , vol.35 , Issue.3 , pp. 329-345
    • Gupta, J.N.D.1
  • 8
    • 0020832935 scopus 로고
    • Mathematical Programming Approaches to Capacity Constrained MRP Systems: Review, Formulation, and Problem Reduction
    • Billington, P. J., J. O. McClain, and L. J. Thomas, "Mathematical Programming Approaches to Capacity Constrained MRP Systems: Review, Formulation, and Problem Reduction," Management Sci., 29, 10 (1983), 1126-1141.
    • (1983) Management Sci. , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 9
    • 84925931867 scopus 로고
    • Disaggregation and Resource Allocation Using Convex Knapsack Problems
    • Bitran, G. R. and A. C. Hax, "Disaggregation and Resource Allocation Using Convex Knapsack Problems," Management Sci., 27, 4 (1981), 431-441.
    • (1981) Management Sci. , vol.27 , Issue.4 , pp. 431-441
    • Bitran, G.R.1    Hax, A.C.2
  • 10
    • 0020194024 scopus 로고
    • Computational Complexity of the Capacitated Lot Sizing Problem
    • _ and H. H. Yanasse, "Computational Complexity of the Capacitated Lot Sizing Problem," Management Sci., 28, 10 (1982), 1174-1186.
    • (1982) Management Sci. , vol.28 , Issue.10 , pp. 1174-1186
    • Yanasse, H.H.1
  • 11
    • 0020103083 scopus 로고
    • Hierarchical Production Planning: A Two-Stage System
    • _, E. A. Haas, and A. C. Hax, "Hierarchical Production Planning: A Two-Stage System," Oper. Res., 30, 2 (1982), 232-251.
    • (1982) Oper. Res. , vol.30 , Issue.2 , pp. 232-251
    • Haas, E.A.1    Hax, A.C.2
  • 12
    • 0019913634 scopus 로고
    • Improved Heuristics for Multistage Requirements Planning Systems
    • Blackburn, J. D. and R. A. Millen, "Improved Heuristics for Multistage Requirements Planning Systems," Management Sci., 28, 1 (1982), 44-56.
    • (1982) Management Sci. , vol.28 , Issue.1 , pp. 44-56
    • Blackburn, J.D.1    Millen, R.A.2
  • 13
    • 0001887652 scopus 로고
    • Dynamic Lot Size Models for Multistage Assembly Systems
    • Crowston, W. B. and H. M. Wagner, "Dynamic Lot Size Models for Multistage Assembly Systems," Management Sci., 20, 1 (1973), 14-21.
    • (1973) Management Sci. , vol.20 , Issue.1 , pp. 14-21
    • Crowston, W.B.1    Wagner, H.M.2
  • 14
    • 0022708058 scopus 로고
    • Consistency of the Disaggregation Process in Hierarchical Planning
    • Erschler, J., G. Fontan, and C. Merce, "Consistency of the Disaggregation Process in Hierarchical Planning," Oper. Res., 34, 3 (1986), 464-469.
    • (1986) Oper. Res. , vol.34 , Issue.3 , pp. 464-469
    • Erschler, J.1    Fontan, G.2    Merce, C.3
  • 15
    • 0019032810 scopus 로고
    • Deterministic Production Planning: Algorithms and Complexity
    • Florian, M., J. K. Lenstra, and A. H. G. Rinnooy Kan, "Deterministic Production Planning: Algorithms and Complexity," Management Sci., 26, 7 (1980), 669-679.
    • (1980) Management Sci. , vol.26 , Issue.7 , pp. 669-679
    • Florian, M.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 16
    • 0018544366 scopus 로고
    • Multi-Stage Production Planning
    • Gabbay, H., "Multi-Stage Production Planning," Management Sci., 25, 11 (1979), 1138-1148.
    • (1979) Management Sci. , vol.25 , Issue.11 , pp. 1138-1148
    • Gabbay, H.1
  • 17
    • 0004244247 scopus 로고
    • North River Press, Croton-on-Hudson
    • Goldratt, E. M. and J. Cox, The Goal, North River Press, Croton-on-Hudson, 1984.
    • (1984) The Goal
    • Goldratt, E.M.1    Cox, J.2
  • 19
    • 0020100192 scopus 로고
    • Using Lagrangian Techniques to Solve Hierarchical Production Planning Problems
    • _, "Using Lagrangian Techniques to Solve Hierarchical Production Planning Problems," Management Sci., 28, 10 (1982), 260-275.
    • (1982) Management Sci. , vol.28 , Issue.10 , pp. 260-275
  • 21
    • 84989472877 scopus 로고
    • Disaggregation in Manufacturing and Service Organizations: Survey of Problems and Research
    • Krajewski, L. J. and L. P. Ritzman, "Disaggregation in Manufacturing and Service Organizations: Survey of Problems and Research," Decision Sci., 8, 1 (1977), 1-18.
    • (1977) Decision Sci. , vol.8 , Issue.1 , pp. 1-18
    • Krajewski, L.J.1    Ritzman, L.P.2
  • 22
    • 0025701546 scopus 로고
    • Multi-Level Lot-Sizing Problem: Evaluation of a Simulated-Annealing Heuristic
    • Kuik, R. and M. Salomon, "Multi-Level Lot-Sizing Problem: Evaluation of a Simulated-Annealing Heuristic," European J. Oper. Res., 45, 1 (1990), 25-37.
    • (1990) European J. Oper. Res. , vol.45 , Issue.1 , pp. 25-37
    • Kuik, R.1    Salomon, M.2
  • 23
    • 0026185832 scopus 로고
    • Multilevel Capacitated Lotsizing Complexity and LP-Based Heuristics
    • Maes, J., J. O. McClain, and L. N. Van Wassenhove, "Multilevel Capacitated Lotsizing Complexity and LP-Based Heuristics," European J. Oper. Res., 53 (1991), 131-148.
    • (1991) European J. Oper. Res. , vol.53 , pp. 131-148
    • Maes, J.1    McClain, J.O.2    Van Wassenhove, L.N.3
  • 25
    • 0042264308 scopus 로고
    • The Multiproduct Lot Scheduling Problem
    • M. A. H. Dempster, J. K. Lenstra and A. H. G. Rinnooy Kan (Eds.), D. Reidel Publishing Company, Dordrecht, Holland
    • Schrage, L., "The Multiproduct Lot Scheduling Problem," in M. A. H. Dempster, J. K. Lenstra and A. H. G. Rinnooy Kan (Eds.), Deterministic and Stochastic Scheduling, D. Reidel Publishing Company, Dordrecht, Holland, 1982.
    • (1982) Deterministic and Stochastic Scheduling
    • Schrage, L.1
  • 26
    • 0019247722 scopus 로고
    • Optimal Multi-Level Lot Sizing for Requirements Planning Systems
    • Steinberg, E. and H. A. Napier, "Optimal Multi-Level Lot Sizing for Requirements Planning Systems," Management Sci., 26, 12 (1980), 1258-1271.
    • (1980) Management Sci. , vol.26 , Issue.12 , pp. 1258-1271
    • Steinberg, E.1    Napier, H.A.2
  • 27
    • 0242436356 scopus 로고
    • Integer Goal Programming for Multistage Lot Sizing: Experimentation and Implementation
    • Vickery, S. K. and R. E. Markland, "Integer Goal Programming for Multistage Lot Sizing: Experimentation and Implementation," J. Oper. Management, 5, 2 (1985), 169-182.
    • (1985) J. Oper. Management , vol.5 , Issue.2 , pp. 169-182
    • Vickery, S.K.1    Markland, R.E.2
  • 28
    • 0022714176 scopus 로고
    • Multi-Stage Lot Sizing in a Serial Production System
    • Vickery, S. K and R. E. Markland, "Multi-Stage Lot Sizing in a Serial Production System," International J. Production Res., 24, 3 (1986), 517-534.
    • (1986) International J. Production Res. , vol.24 , Issue.3 , pp. 517-534
    • Vickery, S.K.1    Markland, R.E.2
  • 29
    • 0041582257 scopus 로고
    • A Production Scheduling Model by Bivalent Linear Programming
    • Von Lanzenauer, C. H., "A Production Scheduling Model by Bivalent Linear Programming," Management Sci., 17, 1 (1970), 105-111.
    • (1970) Management Sci. , vol.17 , Issue.1 , pp. 105-111
    • Von Lanzenauer, C.H.1
  • 30
    • 0021393367 scopus 로고
    • Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
    • Zahorik, A., L. J. Thomas, and W. W. Trigeiro, "Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems," Management Sci., 30, 3 (1984), 308-325.
    • (1984) Management Sci. , vol.30 , Issue.3 , pp. 308-325
    • Zahorik, A.1    Thomas, L.J.2    Trigeiro, W.W.3
  • 31
    • 0010895132 scopus 로고
    • A Deterministic Multiproduct, Multifacility Production and Inventory Model
    • Zangwill, W. I., "A Deterministic Multiproduct, Multifacility Production and Inventory Model," Oper. Res., 14, 3 (1966), 486-507.
    • (1966) Oper. Res. , vol.14 , Issue.3 , pp. 486-507
    • Zangwill, W.I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.