메뉴 건너뛰기




Volumn 181, Issue 2, 2007, Pages 733-752

Supply chain models for an assembly system with preprocessing of raw materials

Author keywords

Inventory model; Nonlinear integer programming; Raw materials

Indexed keywords

ASSEMBLY MACHINES; INTEGER PROGRAMMING; INVENTORY CONTROL; NONLINEAR PROGRAMMING; PUBLIC POLICY; RAW MATERIALS; STRATEGIC PLANNING;

EID: 33947165157     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.08.015     Document Type: Article
Times cited : (24)

References (18)
  • 1
    • 0035426460 scopus 로고    scopus 로고
    • Optimal material control in an assembly system with component commonality
    • Agrawal N., and Cohen M.A. Optimal material control in an assembly system with component commonality. Naval Research Logistics 48 5 (2001) 409-429
    • (2001) Naval Research Logistics , vol.48 , Issue.5 , pp. 409-429
    • Agrawal, N.1    Cohen, M.A.2
  • 2
    • 0035394299 scopus 로고    scopus 로고
    • Just-in-time replenishment decisions for assembly manufacturing with investor-supplied finance
    • Betts J., and Johnston R.B. Just-in-time replenishment decisions for assembly manufacturing with investor-supplied finance. Journal of Operation Research Society 52 7 (2001) 750-761
    • (2001) Journal of Operation Research Society , vol.52 , Issue.7 , pp. 750-761
    • Betts, J.1    Johnston, R.B.2
  • 3
    • 0032626596 scopus 로고    scopus 로고
    • Analysis of assembly systems with service level constraints
    • De Kok, and Ton G. Analysis of assembly systems with service level constraints. International Journal of Production Economics 59 1 (1999) 313-326
    • (1999) International Journal of Production Economics , vol.59 , Issue.1 , pp. 313-326
    • De Kok1    Ton, G.2
  • 4
    • 33947135938 scopus 로고    scopus 로고
    • Determining manufacturing batch size for a lumpy delivery system with trend demand
    • Diponegoro A., and Sarker B.R. Determining manufacturing batch size for a lumpy delivery system with trend demand. International Journal of Production Economics 30 3 (2002) 961-972
    • (2002) International Journal of Production Economics , vol.30 , Issue.3 , pp. 961-972
    • Diponegoro, A.1    Sarker, B.R.2
  • 5
    • 0032069806 scopus 로고    scopus 로고
    • Evaluation of performance measures for multi-part, single-product Kanban controlled assembly systems with stochastic acquisition and production lead times
    • Fujiwara O., Yue X., Sangaradas K., and Luong H.T. Evaluation of performance measures for multi-part, single-product Kanban controlled assembly systems with stochastic acquisition and production lead times. International Journal of Production Research 36 5 (1998) 1427-1444
    • (1998) International Journal of Production Research , vol.36 , Issue.5 , pp. 1427-1444
    • Fujiwara, O.1    Yue, X.2    Sangaradas, K.3    Luong, H.T.4
  • 6
    • 0026869895 scopus 로고
    • Economic manufacturing quantity in a just-in-time delivery system
    • Golhar D.Y., and Sarker B.R. Economic manufacturing quantity in a just-in-time delivery system. Journal of Production Research 30 5 (1992) 961-972
    • (1992) Journal of Production Research , vol.30 , Issue.5 , pp. 961-972
    • Golhar, D.Y.1    Sarker, B.R.2
  • 7
    • 0030285543 scopus 로고    scopus 로고
    • Optimal order policies in assembly systems with random demand and random supplier delivery
    • Gurnani H., Akella R., and Lehoczky J. Optimal order policies in assembly systems with random demand and random supplier delivery. IIE Transactions 28 11 (1996) 865-878
    • (1996) IIE Transactions , vol.28 , Issue.11 , pp. 865-878
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 8
    • 0033075592 scopus 로고    scopus 로고
    • Heuristic algorithm for a production planning problem in an assembly system
    • Park M., and Kim Y. Heuristic algorithm for a production planning problem in an assembly system. Journal of the Operational Research Society 50 2 (1999) 138-147
    • (1999) Journal of the Operational Research Society , vol.50 , Issue.2 , pp. 138-147
    • Park, M.1    Kim, Y.2
  • 9
    • 0033736797 scopus 로고    scopus 로고
    • Branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
    • Park M., and Kim Y. Branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints. European Journal of Operational Research 123 3 (2000) 504-518
    • (2000) European Journal of Operational Research , vol.123 , Issue.3 , pp. 504-518
    • Park, M.1    Kim, Y.2
  • 10
    • 0031697510 scopus 로고    scopus 로고
    • Buffering unbalanced assembly systems
    • Powell S.G., and Pyke D.F. Buffering unbalanced assembly systems. IIE Transactions 30 1 (1998) 55-65
    • (1998) IIE Transactions , vol.30 , Issue.1 , pp. 55-65
    • Powell, S.G.1    Pyke, D.F.2
  • 11
    • 0027663442 scopus 로고
    • Classification and coding of components for implementing a computerized inventory control system for a television assembling industry
    • Rajamani D. Classification and coding of components for implementing a computerized inventory control system for a television assembling industry. International Journal of Production Economics 32 2 (1993) 133-154
    • (1993) International Journal of Production Economics , vol.32 , Issue.2 , pp. 133-154
    • Rajamani, D.1
  • 12
    • 0025261570 scopus 로고
    • Recasting the traditional inventory model to implement just-in-time purchasing
    • Ramesh R.V. Recasting the traditional inventory model to implement just-in-time purchasing. Production and Inventory Management 31 1 (1990) 71-75
    • (1990) Production and Inventory Management , vol.31 , Issue.1 , pp. 71-75
    • Ramesh, R.V.1
  • 13
    • 0030148735 scopus 로고    scopus 로고
    • Effects of work-in-process inventory costs on the design and scheduling of assembly lines with low throughput and high component costs
    • Rosenblatt M.J., and Lee H.L. Effects of work-in-process inventory costs on the design and scheduling of assembly lines with low throughput and high component costs. IIE Transactions 28 5 (1996) 405-414
    • (1996) IIE Transactions , vol.28 , Issue.5 , pp. 405-414
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 14
    • 0030108302 scopus 로고    scopus 로고
    • Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system
    • Sarker B.R., and Parija G.R. Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system. European Journal of the Operational Research 89 3 (1996) 593-608
    • (1996) European Journal of the Operational Research , vol.89 , Issue.3 , pp. 593-608
    • Sarker, B.R.1    Parija, G.R.2
  • 16
    • 33947159782 scopus 로고    scopus 로고
    • 98%-effective lot-sizing for assembly inventory systems
    • Sun D., and Atkins D. 98%-effective lot-sizing for assembly inventory systems. IIE Transactions 30 1 (1997) 55-65
    • (1997) IIE Transactions , vol.30 , Issue.1 , pp. 55-65
    • Sun, D.1    Atkins, D.2
  • 17
    • 33947178533 scopus 로고    scopus 로고
    • Wang, S., 2001. Control of supply chain systems by Kanban mechanism. Ph.D. dissertation, Department of Industrial and Manufacturing System Engineering, Louisiana State University.
  • 18
    • 0032121661 scopus 로고    scopus 로고
    • Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
    • Wilhelm W.E., and Som P. Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system. European Journal of the Operational Research 108 1 (1998) 74-93
    • (1998) European Journal of the Operational Research , vol.108 , Issue.1 , pp. 74-93
    • Wilhelm, W.E.1    Som, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.