-
1
-
-
84982746834
-
Project team aging and performance: the roles of project and functional managers
-
Allen T.J., Katz R., Grady J.J., and Slavin N. Project team aging and performance: the roles of project and functional managers. R&D Manag 18 4 (1988) 295-308
-
(1988)
R&D Manag
, vol.18
, Issue.4
, pp. 295-308
-
-
Allen, T.J.1
Katz, R.2
Grady, J.J.3
Slavin, N.4
-
2
-
-
0004907170
-
Management control in an engineering matrix organization: a project engineer's perspective
-
Anderson C.C., and Fleming M.M.K. Management control in an engineering matrix organization: a project engineer's perspective. Ind Manag 32 2 (1990) 8-13
-
(1990)
Ind Manag
, vol.32
, Issue.2
, pp. 8-13
-
-
Anderson, C.C.1
Fleming, M.M.K.2
-
3
-
-
0033445043
-
Balanced matrix structure and new product development process at Texas Instruments Materials and Controls Division
-
Bernasco W., De Weerd-Nederhof P.C., Tillema H., and Boer H. Balanced matrix structure and new product development process at Texas Instruments Materials and Controls Division. R&D Manag 29 2 (1999) 121-132
-
(1999)
R&D Manag
, vol.29
, Issue.2
, pp. 121-132
-
-
Bernasco, W.1
De Weerd-Nederhof, P.C.2
Tillema, H.3
Boer, H.4
-
4
-
-
0344884662
-
Mathematical contingency modelling for organizational design: taking stock
-
Burton R.M., and Obel B. (Eds), Kluwer, Boston
-
Burton R.M., and Obel B. Mathematical contingency modelling for organizational design: taking stock. In: Burton R.M., and Obel B. (Eds). Design models for hierarchical organizations: computation, information, and decentralization (1995), Kluwer, Boston 3-23
-
(1995)
Design models for hierarchical organizations: computation, information, and decentralization
, pp. 3-23
-
-
Burton, R.M.1
Obel, B.2
-
6
-
-
85037347093
-
-
Carracosa MS, Eppinger D, Whitney DE. Using the design structure to estimate product development time. In: Proc. of the DECTM 98, ASME Design Engineering Technical Conference. Atlanta, GA, 1998.
-
Carracosa MS, Eppinger D, Whitney DE. Using the design structure to estimate product development time. In: Proc. of the DECTM 98, ASME Design Engineering Technical Conference. Atlanta, GA, 1998.
-
-
-
-
7
-
-
0032758739
-
Conflict management styles in Hong Kong industries
-
Cheung C.C., and Chuah K.B. Conflict management styles in Hong Kong industries. Int J Proj Manag 17 6 (1999) 393-399
-
(1999)
Int J Proj Manag
, vol.17
, Issue.6
, pp. 393-399
-
-
Cheung, C.C.1
Chuah, K.B.2
-
8
-
-
0004910137
-
An economic analysis of matrix structure, using multinational corporations as an illustration
-
Chi T., and Nystrom P. An economic analysis of matrix structure, using multinational corporations as an illustration. Manag Dec Econ 19 (1998) 141-156
-
(1998)
Manag Dec Econ
, vol.19
, pp. 141-156
-
-
Chi, T.1
Nystrom, P.2
-
11
-
-
54849428070
-
-
Davis EW, Patterson JH. Resourced-based project scheduling: which rules perform best? In: Project Management Quarterly, September 1976.
-
Davis EW, Patterson JH. Resourced-based project scheduling: which rules perform best? In: Project Management Quarterly, September 1976.
-
-
-
-
12
-
-
54849429508
-
-
Addison-Wesley Publishing Company, Massachusetts
-
Davis S.M., and Lawrence P.R. Matrix reading (1977), Addison-Wesley Publishing Company, Massachusetts
-
(1977)
Matrix reading
-
-
Davis, S.M.1
Lawrence, P.R.2
-
13
-
-
84973739743
-
Matrix management of projects and power struggles: a case study of an R&D laboratory
-
De Laat P.B. Matrix management of projects and power struggles: a case study of an R&D laboratory. Hum Relat 47 9 (1994) 1089-1119
-
(1994)
Hum Relat
, vol.47
, Issue.9
, pp. 1089-1119
-
-
De Laat, P.B.1
-
14
-
-
54849436785
-
-
Forrester JW. System dynamics - future opportunities. In: Legasto AA, Forrester JW, Lyneis JM editors. TIMS studies in the management sciences, vol. 14; 1980. p. 7-21.
-
Forrester JW. System dynamics - future opportunities. In: Legasto AA, Forrester JW, Lyneis JM editors. TIMS studies in the management sciences, vol. 14; 1980. p. 7-21.
-
-
-
-
15
-
-
49649152187
-
Matrix organization designs: how to combine functional and project forms
-
Galbraith J.R. Matrix organization designs: how to combine functional and project forms. Bus Horizons 14 (1971) 29-40
-
(1971)
Bus Horizons
, vol.14
, pp. 29-40
-
-
Galbraith, J.R.1
-
16
-
-
0024132264
-
Controlled alternative activity networks in project management
-
Golenko-Ginzburg D. Controlled alternative activity networks in project management. Eur J Oper Res 7 (1988) 336-346
-
(1988)
Eur J Oper Res
, vol.7
, pp. 336-346
-
-
Golenko-Ginzburg, D.1
-
17
-
-
0031124637
-
A generalized activity network model
-
Golenko-Ginzburg D., and Bloch D. A generalized activity network model. J Oper Res Soc 48 (1997) 391-400
-
(1997)
J Oper Res Soc
, vol.48
, pp. 391-400
-
-
Golenko-Ginzburg, D.1
Bloch, D.2
-
18
-
-
0032120296
-
A heuristic for network project scheduling with random activity durations depending on the resource reallocation
-
Golenko-Ginzburg D., and Gonik A. A heuristic for network project scheduling with random activity durations depending on the resource reallocation. Int J Prod Econ 55 2 (1998) 149-162
-
(1998)
Int J Prod Econ
, vol.55
, Issue.2
, pp. 149-162
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
19
-
-
0038715816
-
Resource constrained scheduling simulation model for alternative stochastic network projects
-
Golenko-Ginzburg D., Gonik A., and Laslo Z. Resource constrained scheduling simulation model for alternative stochastic network projects. Math Comput Simul 63 2 (2003) 105-117
-
(2003)
Math Comput Simul
, vol.63
, Issue.2
, pp. 105-117
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
Laslo, Z.3
-
20
-
-
0004867083
-
When two bosses are better than one?
-
Grinnell S.K., and Apple H.P. When two bosses are better than one?. Machine Des Jan. (1975) 84-87
-
(1975)
Machine Des
, Issue.Jan
, pp. 84-87
-
-
Grinnell, S.K.1
Apple, H.P.2
-
21
-
-
0036651140
-
Organization design
-
Harris M., and Raviv A. Organization design. Manag Sci 48 7 (2002) 852-865
-
(2002)
Manag Sci
, vol.48
, Issue.7
, pp. 852-865
-
-
Harris, M.1
Raviv, A.2
-
22
-
-
0033150366
-
Human capacity allocation and project portfolio planning in practice
-
Hendriks M.H.A., Voeten B., and Kroep L. Human capacity allocation and project portfolio planning in practice. Int J Proj Manag 17 3 (1998) 181-188
-
(1998)
Int J Proj Manag
, vol.17
, Issue.3
, pp. 181-188
-
-
Hendriks, M.H.A.1
Voeten, B.2
Kroep, L.3
-
23
-
-
0002463921
-
Project performance and the locus of influence in the R&D matrix
-
Katz R., and Allen T.J. Project performance and the locus of influence in the R&D matrix. Acad Manag J 28 1 (1985) 67-87
-
(1985)
Acad Manag J
, vol.28
, Issue.1
, pp. 67-87
-
-
Katz, R.1
Allen, T.J.2
-
24
-
-
0001620447
-
Critical path planning and scheduling: mathematical basis
-
Kelley J.E. Critical path planning and scheduling: mathematical basis. Oper Res 9 3 (1961) 296-320
-
(1961)
Oper Res
, vol.9
, Issue.3
, pp. 296-320
-
-
Kelley, J.E.1
-
25
-
-
85044160449
-
-
Kelley JE, Walker MR. Critical path planning and scheduling. In: Proc. of the Eastern Joint Computer Conference; 1959. p. 160-73.
-
Kelley JE, Walker MR. Critical path planning and scheduling. In: Proc. of the Eastern Joint Computer Conference; 1959. p. 160-73.
-
-
-
-
28
-
-
33645639974
-
The effect of task uncertainty and decentralization on project team performance
-
Kim J., and Burton R.M. The effect of task uncertainty and decentralization on project team performance. Comput Math Org Theory 8 (2002) 365-384
-
(2002)
Comput Math Org Theory
, vol.8
, pp. 365-384
-
-
Kim, J.1
Burton, R.M.2
-
29
-
-
0037211130
-
Implementation and performance of a matrix organization structure
-
Kuprenas J.A. Implementation and performance of a matrix organization structure. Int J Proj Manag 21 1 (2003) 51-62
-
(2003)
Int J Proj Manag
, vol.21
, Issue.1
, pp. 51-62
-
-
Kuprenas, J.A.1
-
30
-
-
0001855422
-
Project management structures: is there a common language?
-
Larson E.W., and Gobeli D.H. Project management structures: is there a common language?. Proj Manag J 16 2 (1985) 40-44
-
(1985)
Proj Manag J
, vol.16
, Issue.2
, pp. 40-44
-
-
Larson, E.W.1
Gobeli, D.H.2
-
31
-
-
84968270898
-
Matrix management: contradictions and insights
-
Larson E.W., and Gobeli D.H. Matrix management: contradictions and insights. California Manag Rev 29 4 (1987) 126-138
-
(1987)
California Manag Rev
, vol.29
, Issue.4
, pp. 126-138
-
-
Larson, E.W.1
Gobeli, D.H.2
-
32
-
-
11544277661
-
Organizing for product development projects
-
Larson E.W., and Gobeli D.H. Organizing for product development projects. J Prod Innov Manag 5 (1988) 180-190
-
(1988)
J Prod Innov Manag
, vol.5
, pp. 180-190
-
-
Larson, E.W.1
Gobeli, D.H.2
-
33
-
-
54849424882
-
-
Laslo Z. Configurations of directed random projects: generating projects for simulations. In: Proc. of the Eighth Conference of Industrial Engineering and Management. Ben-Gurion University of the Negev, Beer Sheva, 1994.
-
Laslo Z. Configurations of directed random projects: generating projects for simulations. In: Proc. of the Eighth Conference of Industrial Engineering and Management. Ben-Gurion University of the Negev, Beer Sheva, 1994.
-
-
-
-
34
-
-
0037349305
-
Activity time-cost tradeoffs under time and cost chance constraints
-
Laslo Z. Activity time-cost tradeoffs under time and cost chance constraints. Comput Ind Eng 44 3 (2003) 365-384
-
(2003)
Comput Ind Eng
, vol.44
, Issue.3
, pp. 365-384
-
-
Laslo, Z.1
-
35
-
-
54849406715
-
-
Laslo Z, Goldberg AI. Matrix management: when do project managers agree with functional Managers? In: Proc. of the Third European Project Management (PMI) Conference, Jerusalem, 2000.
-
Laslo Z, Goldberg AI. Matrix management: when do project managers agree with functional Managers? In: Proc. of the Third European Project Management (PMI) Conference, Jerusalem, 2000.
-
-
-
-
36
-
-
0035333440
-
Matrix structures and performance: the search for optimal adjustment to organizational objectives
-
Laslo Z., and Goldberg A.I. Matrix structures and performance: the search for optimal adjustment to organizational objectives. IEEE Trans Eng Manag EM-48 2 (2001) 144-156
-
(2001)
IEEE Trans Eng Manag
, vol.EM-48
, Issue.2
, pp. 144-156
-
-
Laslo, Z.1
Goldberg, A.I.2
-
37
-
-
54849435196
-
-
Lawrence PR, Kolodny HF, Davis SM. The human side of matrix. In: Tushman ML, Moore WL editors. Readings in the Management of Innovation; 1982. p. 504-19.
-
Lawrence PR, Kolodny HF, Davis SM. The human side of matrix. In: Tushman ML, Moore WL editors. Readings in the Management of Innovation; 1982. p. 504-19.
-
-
-
-
38
-
-
0004267824
-
-
Gower, Aldershit, Hampshire
-
Lock D. Project management (2000), Gower, Aldershit, Hampshire
-
(2000)
Project management
-
-
Lock, D.1
-
39
-
-
0001501655
-
Application of technique for research and development program evaluation (PERT)
-
Malcolm D.G., Roseboom J.H., Clark C.E., and Fazar W. Application of technique for research and development program evaluation (PERT). Operat Res 7 5 (1959) 646-669
-
(1959)
Operat Res
, vol.7
, Issue.5
, pp. 646-669
-
-
Malcolm, D.G.1
Roseboom, J.H.2
Clark, C.E.3
Fazar, W.4
-
41
-
-
0026107086
-
The effects of matrix organization size and number of project assignments on performance
-
McCollum J.K., and Sherman J.D. The effects of matrix organization size and number of project assignments on performance. IEEE Trans Eng Manag EM-38 1 (1991) 75-78
-
(1991)
IEEE Trans Eng Manag
, vol.EM-38
, Issue.1
, pp. 75-78
-
-
McCollum, J.K.1
Sherman, J.D.2
-
43
-
-
0003748060
-
-
The Free Press, NY
-
Miles R.E., and Snow C.C. Fit, failure, and the hall of frame: how companies succeed or fail (1994), The Free Press, NY
-
(1994)
Fit, failure, and the hall of frame: how companies succeed or fail
-
-
Miles, R.E.1
Snow, C.C.2
-
45
-
-
0036746560
-
Being efficiently fickle: a dynamic theory of organizational choice
-
Nickerson J.A., and Zenger T.R. Being efficiently fickle: a dynamic theory of organizational choice. Org Sci 13 5 (2002) 547-566
-
(2002)
Org Sci
, vol.13
, Issue.5
, pp. 547-566
-
-
Nickerson, J.A.1
Zenger, T.R.2
-
46
-
-
0029321203
-
Management of multiple simultaneous projects: a state-of-the-art review
-
Payne J.H. Management of multiple simultaneous projects: a state-of-the-art review. Int J Proj Manag 13 3 (1995) 163-168
-
(1995)
Int J Proj Manag
, vol.13
, Issue.3
, pp. 163-168
-
-
Payne, J.H.1
-
47
-
-
0036697280
-
On uncertainty, ambiguity, and complexity in project management
-
Pich M.T., Loch C.H., and De-Meyer A. On uncertainty, ambiguity, and complexity in project management. Manag Sci 48 8 (2002) 1008-1023
-
(2002)
Manag Sci
, vol.48
, Issue.8
, pp. 1008-1023
-
-
Pich, M.T.1
Loch, C.H.2
De-Meyer, A.3
-
48
-
-
0001771640
-
Project management and conflict resolution
-
Pinto J.K., and Kharbanda O.P. Project management and conflict resolution. Proj Manag J 26 4 (1995) 45-54
-
(1995)
Proj Manag J
, vol.26
, Issue.4
, pp. 45-54
-
-
Pinto, J.K.1
Kharbanda, O.P.2
-
49
-
-
38149148052
-
Project and portfolio planning cycle: project-based management for the multiproject challenge
-
Platje A., Seidel H., and Wadman S. Project and portfolio planning cycle: project-based management for the multiproject challenge. Int J Proj Manag 12 2 (1994) 100-106
-
(1994)
Int J Proj Manag
, vol.12
, Issue.2
, pp. 100-106
-
-
Platje, A.1
Seidel, H.2
Wadman, S.3
-
50
-
-
54849433087
-
-
Pritsker AAB. GERT: Graphical evaluation and review technique, The Rand Corp., Santa Monica, Memorandum RM-4973-NASA, 1966.
-
Pritsker AAB. GERT: Graphical evaluation and review technique, The Rand Corp., Santa Monica, Memorandum RM-4973-NASA, 1966.
-
-
-
-
51
-
-
54849409408
-
-
Project Management Institute, The Principles of Project Management, Sylva, NC: Project Management Institute, 1997.
-
Project Management Institute, The Principles of Project Management, Sylva, NC: Project Management Institute, 1997.
-
-
-
-
52
-
-
0942268003
-
Temporarily divide to conquer: centralized, decentralized, and reintegrated organizational approaches to exploration and adaptation
-
Siggelkow N., and Levinthal D.A. Temporarily divide to conquer: centralized, decentralized, and reintegrated organizational approaches to exploration and adaptation. Org Sci 14 6 (2003) 650-669
-
(2003)
Org Sci
, vol.14
, Issue.6
, pp. 650-669
-
-
Siggelkow, N.1
Levinthal, D.A.2
-
53
-
-
21144460988
-
Social accounts in conflict situations: using explanations to manage conflict
-
Sitkin S.B., and Bies R.J. Social accounts in conflict situations: using explanations to manage conflict. Hum Relat 46 3 (1993) 349-370
-
(1993)
Hum Relat
, vol.46
, Issue.3
, pp. 349-370
-
-
Sitkin, S.B.1
Bies, R.J.2
-
54
-
-
0002180672
-
Reconceptualizing the determinants of risk behavior
-
Sitkin S.B., and Pablo A.L. Reconceptualizing the determinants of risk behavior. Acad Manag Rev 17 1 (1992) 9-38
-
(1992)
Acad Manag Rev
, vol.17
, Issue.1
, pp. 9-38
-
-
Sitkin, S.B.1
Pablo, A.L.2
-
55
-
-
0019597497
-
The design structure matrix: a method for managing the design of complex systems
-
Steward D. The design structure matrix: a method for managing the design of complex systems. IEEE Trans Eng Manag EM-28 3 (1981) 71-74
-
(1981)
IEEE Trans Eng Manag
, vol.EM-28
, Issue.3
, pp. 71-74
-
-
Steward, D.1
-
56
-
-
54849427646
-
-
Thamhain HI, Wilemon DL. Conflict management in project-oriented work environment. In: Proc of the Sixth International Project Management Institute, Washington DC; 1974.
-
Thamhain HI, Wilemon DL. Conflict management in project-oriented work environment. In: Proc of the Sixth International Project Management Institute, Washington DC; 1974.
-
-
-
-
57
-
-
3242659739
-
Fuzzy optimisation of labour allocation by genetic algorithms
-
Tong T.K.L., and Tam C.M. Fuzzy optimisation of labour allocation by genetic algorithms. Eng Const Archit Manag 10 2 (2003) 146-155
-
(2003)
Eng Const Archit Manag
, vol.10
, Issue.2
, pp. 146-155
-
-
Tong, T.K.L.1
Tam, C.M.2
-
58
-
-
0031206982
-
Multi-project management - organisational structure and control
-
Van der Merwe A.P. Multi-project management - organisational structure and control. Int J Proj Manag 15 4 (1997) 223-233
-
(1997)
Int J Proj Manag
, vol.15
, Issue.4
, pp. 223-233
-
-
Van der Merwe, A.P.1
-
59
-
-
0000738834
-
Monte Carlo methods and the PERT problem
-
Van Slyke R.M. Monte Carlo methods and the PERT problem. Oper Res 11 5 (1963) 839-860
-
(1963)
Oper Res
, vol.11
, Issue.5
, pp. 839-860
-
-
Van Slyke, R.M.1
-
61
-
-
34249034951
-
On the manpower allocation within matrix organization: a fuzzy linear programming approach
-
Wu Y.K. On the manpower allocation within matrix organization: a fuzzy linear programming approach. Eur J Oper Res 183 1 (2007) 384-393
-
(2007)
Eur J Oper Res
, vol.183
, Issue.1
, pp. 384-393
-
-
Wu, Y.K.1
|