메뉴 건너뛰기




Volumn 2, Issue , 1998, Pages

Using the design structure matrixto estimate product development time

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER AIDED DESIGN; PRODUCT DESIGN; PRODUCT DEVELOPMENT; STOCHASTIC MODELS; STOCHASTIC SYSTEMS;

EID: 85037347093     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/DETC98/DAC-6013     Document Type: Conference Paper
Times cited : (112)

References (24)
  • 6
    • 0019013785 scopus 로고
    • Engineering Information Release Prior to Final Design Freeze
    • Eastman, R., ?Engineering Information Release Prior to Final Design Freeze. " IEEE transactions on Engineering Management Vol. EM-27, No. 2, 1980, 37-41.
    • (1980) IEEE transactions on Engineering Management , vol.EM-27 , Issue.2 , pp. 37-41
    • Eastman, R.1
  • 8
    • 0030718389 scopus 로고    scopus 로고
    • Generalized Models of Design Iteration Using Signal Flow Graphs
    • Eppinger, S. Nukala, M. and Whitney, D., ?Generalized Models of Design Iteration Using Signal Flow Graphs. " Research in Engineering Design, Vol. 9, No. 2, 1997.
    • (1997) Research in Engineering Design , vol.9 , Issue.2
    • Eppinger, S.1    Nukala, M.2    Whitney, D.3
  • 9
    • 0022101234 scopus 로고
    • Innovation is not a Linear Process
    • Kline, S., ?Innovation is not a Linear Process. " Res. Management, 28, 4 (1985), 36-45.
    • (1985) Res. Management , vol.28 , Issue.4 , pp. 36-45
    • Kline, S.1
  • 10
    • 0031108561 scopus 로고    scopus 로고
    • A Model- Based Framework to Overlap Product Development Activities
    • April
    • Krishnan, V., Eppinger, S. and Whitney, D., ?A Model- Based Framework to Overlap Product Development Activities. " Management Science Vol. 43, No. 4, April 1997.
    • (1997) Management Science , vol.43 , Issue.4
    • Krishnan, V.1    Eppinger, S.2    Whitney, D.3
  • 12
    • 0029369186 scopus 로고
    • Optimal Timing of Reviews in the Concurrent Design for Manufacturability
    • September
    • Ha, A. and Porteus, E., ?Optimal Timing of Reviews in the Concurrent Design for Manufacturability. " Management Science Vol. 41, No. 9, September 1995.
    • (1995) Management Science , vol.41 , Issue.9
    • Ha, A.1    Porteus, E.2
  • 14
    • 0031199079 scopus 로고    scopus 로고
    • A Predictive Model of Sequential Iteration in Engineering Design
    • August
    • Smith, R., Eppinger, S., ?A Predictive Model of Sequential Iteration in Engineering Design. "Management Science Vol. 43, No. 8, August 1997.
    • (1997) Management Science , vol.43 , Issue.8
    • Smith, R.1    Eppinger, S.2
  • 15
    • 0031084622 scopus 로고    scopus 로고
    • Identifying Controlling Features of Engineering Design Iteration
    • March
    • Smith, R., Eppinger, S., ?Identifying Controlling Features of Engineering Design Iteration. " Management Science Vol. 43, No. 3, March 1997.
    • (1997) Management Science , vol.43 , Issue.3
    • Smith, R.1    Eppinger, S.2
  • 16
    • 0001827031 scopus 로고
    • Time-The Next Source of Competitive Advantage
    • July-August
    • Stalk, G., ?Time-The Next Source of Competitive Advantage. " Harvard Business Review July-August 1988, 41- 51.
    • (1988) Harvard Business Review , pp. 41-51
    • Stalk, G.1
  • 17
    • 0019597497 scopus 로고
    • The Design Structure Matrix: A Method for Managing the Design of Complex Systems
    • August
    • Steward, D., ?The Design Structure Matrix: A Method for Managing the Design of Complex Systems. " IEEE Transactions on Engineering Management, Vol EM-28, No. 3, August 1981.
    • (1981) IEEE Transactions on Engineering Management , vol.EM-28 , Issue.3
    • Steward, D.1
  • 18
    • 0000801578 scopus 로고
    • The New New Product Development Game
    • January February
    • Takeuchi, H. and Nonaka, I., ?The New New Product Development Game" Harvard Business Review January- February 1986, 137-146.
    • (1986) Harvard Business Review , pp. 137-146
    • Takeuchi, H.1    Nonaka, I.2
  • 19
    • 0003620401 scopus 로고    scopus 로고
    • Management of Overlapping Development Activities: a Framework for Exchanging Preliminary Information
    • INFORMS October 97 presentation
    • Terwiesch, C and Loch, C., ?Management of Overlapping Development Activities: a Framework for Exchanging Preliminary Information" INFORMS October 97 presentation.
    • Terwiesch, C1    Loch, C.2
  • 21
    • 85101132125 scopus 로고    scopus 로고
    • A Set-Based Aystem for Eliminating Infeasible Designs in Engineering Problems Dominated by Uncertainty
    • DETC97/DTM 3886
    • Ward, A and Finch, W., ?A Set-Based Aystem for Eliminating Infeasible Designs in Engineering Problems Dominated by Uncertainty. " Proceedings of DETC'97, ASME Design Engineering Technical Conference. DETC97/DTM- 3886.
    • Proceedings of DETC'97, ASME Design Engineering Technical Conference
    • Ward, A1    Finch, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.