1
-
-
0015725454
-
Project scheduling under resource constraints: Historical review and categorization of procedures
-
Davis E.W. Project scheduling under resource constraints: historical review and categorization of procedures. AIIE Trans. 5(4):1973;297-313.
-
(1973)
AIIE Trans.
, vol.5
, Issue.4
, pp. 297-313
-
-
Davis, E.W.1
-
2
-
-
0024132264
-
Controlled alternative activity networks in project management
-
Golenko-Ginzburg D. Controlled alternative activity networks in project management. Eur. J. Oper. Res. 7:1988;336-346.
-
(1988)
Eur. J. Oper. Res.
, vol.7
, pp. 336-346
-
-
Golenko-Ginzburg, D.1
-
3
-
-
0027642129
-
A two-level decision-making model for controlling stochastic projects
-
Golenko-Ginzburg D. A two-level decision-making model for controlling stochastic projects. Int. J. Prod. Econ. 32:1993;117-127.
-
(1993)
Int. J. Prod. Econ.
, vol.32
, pp. 117-127
-
-
Golenko-Ginzburg, D.1
-
4
-
-
0030735291
-
Stochastic network project scheduling with non-consumable limited resources
-
Golenko-Ginzburg D., Gonik A. Stochastic network project scheduling with non-consumable limited resources. Int. J. Prod. Econ. 48:1997;29-37.
-
(1997)
Int. J. Prod. Econ.
, vol.48
, pp. 29-37
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
6
-
-
0032120296
-
A heuristic for network project scheduling with random activity durations depending on the resource reallocation
-
Golenko-Ginzburg D., Gonik A. A heuristic for network project scheduling with random activity durations depending on the resource reallocation. Int. J. Prod. Econ. 55:1998;149-162.
-
(1998)
Int. J. Prod. Econ.
, vol.55
, pp. 149-162
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
7
-
-
0037640095
-
-
a Ph.D. Thesis, Ben-Gurion University of the Negev, Beer-Sheva, Israel
-
A. Gonik, Planning and controlling R&D stochastic projects, a Ph.D. Thesis, Ben-Gurion University of the Negev, Beer-Sheva, Israel, 1995.
-
(1995)
Planning and Controlling R&D Stochastic Projects
-
-
Gonik, A.1
-
8
-
-
38149144832
-
A comparison between the VERT program and other methods of project duration estimates
-
Kidd J. A comparison between the VERT program and other methods of project duration estimates. Omega. 15(2):1987;129-134.
-
(1987)
Omega
, vol.15
, Issue.2
, pp. 129-134
-
-
Kidd, J.1
-
10
-
-
0038654496
-
Why projects are always late: A rationale based on simulation of a PERT/CPM method
-
Schonberger R.I. Why projects are always late: a rationale based on simulation of a PERT/CPM method. Interfaces. 11(5):1981;66-70.
-
(1981)
Interfaces
, vol.11
, Issue.5
, pp. 66-70
-
-
Schonberger, R.I.1
-
11
-
-
0026223172
-
Scheduling under a non-renewable resource constrained
-
Toker A., Kondacsi S., Erkip N. Scheduling under a non-renewable resource constrained. J. Oper. Res. Soc. 42(9):1991;811-814.
-
(1991)
J. Oper. Res. Soc.
, vol.42
, Issue.9
, pp. 811-814
-
-
Toker, A.1
Kondacsi, S.2
Erkip, N.3
-
12
-
-
3543056985
-
A heuristic scheduling algorithm for improving the duration and net present value of a project
-
Ulisoy G., Ozdamar R. A heuristic scheduling algorithm for improving the duration and net present value of a project. Int. J. Oper. Prod. Manage. 15(1):1995;89-98.
-
(1995)
Int. J. Oper. Prod. Manage.
, vol.15
, Issue.1
, pp. 89-98
-
-
Ulisoy, G.1
Ozdamar, R.2
-
13
-
-
0003625523
-
-
Collier Macmillan, New York
-
R.E. Walpole, R.H. Myers, Probability and Statistics for Engineers and Scientists, second ed., Collier Macmillan, New York, 1978.
-
(1978)
Probability and Statistics for Engineers and Scientists, Second Ed.
-
-
Walpole, R.E.1
Myers, R.H.2
-
14
-
-
0022107667
-
Critical path analysis and resource constrained project scheduling. Theory and practice
-
Willis R.I. Critical path analysis and resource constrained project scheduling. Theory and practice. Eur. J. Oper. Res. 21:1985;149-155.
-
(1985)
Eur. J. Oper. Res.
, vol.21
, pp. 149-155
-
-
Willis, R.I.1
|