메뉴 건너뛰기




Volumn 9, Issue 1, 2004, Pages 43-56

A seamless supply chain management model for construction

Author keywords

Construction industry; Integration; Supply chain management; Team working

Indexed keywords

BENCHMARKING; CONSTRUCTION INDUSTRY; CONTRACTS; COSTS; PROJECT MANAGEMENT; PUBLIC POLICY; STRATEGIC PLANNING; TOTAL QUALITY MANAGEMENT;

EID: 2342559104     PISSN: 13598546     EISSN: None     Source Type: Journal    
DOI: 10.1108/13598540410517575     Document Type: Review
Times cited : (174)

References (68)
  • 1
  • 3
    • 0034391513 scopus 로고    scopus 로고
    • A survey of supply chain collaboration and management in the UK construction industry
    • Akintoye, A., McIntosh, G. and Fitzgerald, E. (2000), "A survey of supply chain collaboration and management in the UK construction industry", European Journal of Purchasing and Supply Management, Vol. 6 No. 3-4, pp. 159-68.
    • (2000) European Journal of Purchasing and Supply Management , vol.6 , Issue.3-4 , pp. 159-168
    • Akintoye, A.1    McIntosh, G.2    Fitzgerald, E.3
  • 5
    • 22844440688 scopus 로고    scopus 로고
    • Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process
    • Austin, S., Baldwin, A., Li, B. and Waskett, P. (2000), "Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process", Construction Management and Economics, Vol. 18 No. 2, pp. 173-82.
    • (2000) Construction Management and Economics , vol.18 , Issue.2 , pp. 173-182
    • Austin, S.1    Baldwin, A.2    Li, B.3    Waskett, P.4
  • 6
    • 0040974637 scopus 로고
    • Northern Californian Construction Institute, Monterey, CA
    • Ballard, G. (1994), The Last Planner, Northern Californian Construction Institute, Monterey, CA.
    • (1994) The Last Planner
    • Ballard, G.1
  • 7
    • 2342425232 scopus 로고    scopus 로고
    • Phase Scheduling
    • Lean Construction Institute, 27 April
    • Ballard, G. (2000), Phase Scheduling. White Paper #7, Lean Construction Institute, 27 April, available at: www.leanconstruction.org
    • (2000) White Paper #7 , vol.7
    • Ballard, G.1
  • 8
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: An essential step in production control
    • Ballard, G. and Howell, G. (1997), "Shielding production: an essential step in production control", ASCE Construction Engineering and Management, Vol. 124 No. 1, pp. 11-17.
    • (1997) ASCE Construction Engineering and Management , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 10
    • 0034416897 scopus 로고    scopus 로고
    • The terrain scanning methodology: Assessing and improving construction supply chains
    • Barker, R., Hong-Minh, S. and Naim, M.M. (2000), "The terrain scanning methodology: assessing and improving construction supply chains", European Journal of Purchasing and Supply Management, Vol. 6 No. 3-4, pp. 179-93.
    • (2000) European Journal of Purchasing and Supply Management , vol.6 , Issue.3-4 , pp. 179-193
    • Barker, R.1    Hong-Minh, S.2    Naim, M.M.3
  • 11
    • 0242686371 scopus 로고
    • Evaluation of novation contract
    • University of New South Wales, Sydney, 17-18 February
    • Chan, A.P.C. (1994), "Evaluation of novation contract", Proceedings of the National Construction Management Conference, University of New South Wales, Sydney, 17-18 February, pp. 383-96.
    • (1994) Proceedings of the National Construction Management Conference , pp. 383-396
    • Chan, A.P.C.1
  • 14
    • 84951549729 scopus 로고
    • Characteristics of supply chain management and the implications for purchasing and logistics strategy
    • Cooper, M.C. and Ellram, L.M. (1993), "Characteristics of supply chain management and the implications for purchasing and logistics strategy", International Journal of Logistics Management, Vol. 4 No. 2, pp. 13-24
    • (1993) International Journal of Logistics Management , vol.4 , Issue.2 , pp. 13-24
    • Cooper, M.C.1    Ellram, L.M.2
  • 15
    • 2342460648 scopus 로고    scopus 로고
    • Ministry of Manpower and Ministry of National Development, Singapore
    • Construct 21 Steering Committee (1999), Construct 21, Ministry of Manpower and Ministry of National Development, Singapore.
    • (1999) Construct 21
  • 17
  • 18
    • 2342577152 scopus 로고    scopus 로고
    • a report for Government by the National Building and Construction Committee, The Department of Industry, Science and Tourism, Canberra
    • DISR (1999), Building for Growth: An Action Agenda for the Building and Construction Industries, a report for Government by the National Building and Construction Committee, The Department of Industry, Science and Tourism, Canberra.
    • (1999) Building for Growth: An Action Agenda for the Building and Construction Industries
  • 19
    • 0034410314 scopus 로고    scopus 로고
    • Supply strategy and network effects - Purchasing behaviour in the construction industry
    • Dubios, A. and Gadde, L-E. (2000), "Supply strategy and network effects - purchasing behaviour in the construction industry", European Journal of Purchasing and Supply Management, Vol. 6 No. 3-4, pp. 207-15.
    • (2000) European Journal of Purchasing and Supply Management , vol.6 , Issue.3-4 , pp. 207-215
    • Dubios, A.1    Gadde, L.-E.2
  • 20
    • 0003732501 scopus 로고    scopus 로고
    • Construction Task Force report, Department of the Environment, Transport and the Regions, London
    • Egan, J. Sir (1998), Rethinking Construction, Construction Task Force report, Department of the Environment, Transport and the Regions, London.
    • (1998) Rethinking Construction
    • Egan, J.1
  • 22
    • 0030123268 scopus 로고    scopus 로고
    • Machiavellian project managers: Do they perform better?
    • Graham, J.H. (1996), "Machiavellian project managers: do they perform better?", International Journal of Project Management, Vol. 14 No. 2, pp. 64-7.
    • (1996) International Journal of Project Management , vol.14 , Issue.2 , pp. 64-67
    • Graham, J.H.1
  • 23
    • 0040243654 scopus 로고    scopus 로고
    • A metaphorical analysis of client organisations and the briefing process
    • Green, S. (1996), "A metaphorical analysis of client organisations and the briefing process", Construction Management and Economics, Vol. 14 No. 1, pp. 155-64.
    • (1996) Construction Management and Economics , vol.14 , Issue.1 , pp. 155-164
    • Green, S.1
  • 28
    • 0042836848 scopus 로고    scopus 로고
    • Purchasing UK public sector property and construction professional services: Competition v. quality
    • Hoxley, M. (2001), "Purchasing UK public sector property and construction professional services: competition v. quality", European Journal of Purchasing and Supply Management, Vol. 7 No. 2, pp. 133-9.
    • (2001) European Journal of Purchasing and Supply Management , vol.7 , Issue.2 , pp. 133-139
    • Hoxley, M.1
  • 29
    • 84993029098 scopus 로고
    • Supply chain management: Past, the present and the future
    • Johnston, P. (1995), "Supply chain management: past, the present and the future", The Manufacturing Engineer, pp. 213-17.
    • (1995) The Manufacturing Engineer , pp. 213-217
    • Johnston, P.1
  • 31
  • 33
    • 84925976036 scopus 로고
    • The effects of group longevity on project communication and performance
    • Katz, K. (1982), "The effects of group longevity on project communication and performance", Administrative Science Quarterly, Vol. 27, pp. 81-104.
    • (1982) Administrative Science Quarterly , vol.27 , pp. 81-104
    • Katz, K.1
  • 37
    • 0002414462 scopus 로고    scopus 로고
    • What is it?
    • Kranz, S. (1996), "What is it?", Purchasing Today, October, p. 4.
    • (1996) Purchasing Today , vol.OCTOBER , pp. 4
    • Kranz, S.1
  • 43
    • 0035313910 scopus 로고    scopus 로고
    • Cooperative benchmarking: A tool for partnering excellence in construction
    • Li, H., Cheng, E.W.L, Love, P.E.D, and Irani, Z. (2001), "Cooperative benchmarking: a tool for partnering excellence in construction", International Journal of Project Management, Vol. 19 No. 3, pp. 171-9.
    • (2001) International Journal of Project Management , vol.19 , Issue.3 , pp. 171-179
    • Li, H.1    Cheng, E.W.L.2    Love, P.E.D.3    Irani, Z.4
  • 45
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • Love, P.E.D. (2002a), "Influence of project type and procurement method on rework costs in building construction projects", ASCE Journal of Construction, Engineering and Management, Vol. 128 No. 1, pp. 18-29.
    • (2002) ASCE Journal of Construction, Engineering and Management , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 47
    • 2342621064 scopus 로고    scopus 로고
    • Influence of organisational learning practices on rework costs in projects
    • Centre for Management Quality Research (CMQR) at RMIT University, RMIT Storey Hall, Melbourne, 13-15 April
    • Love, P.E.D. and Sohal, A.S. (2002), "Influence of organisational learning practices on rework costs in projects", Proceedings of the Eighth International Conference on ISO 9000 & TQM (Change Management), Centre for Management Quality Research (CMQR) at RMIT University, RMIT Storey Hall, Melbourne, 13-15 April.
    • (2002) Proceedings of the Eighth International Conference on ISO 9000 & TQM (Change Management)
    • Love, P.E.D.1    Sohal, A.S.2
  • 50
    • 0000611906 scopus 로고    scopus 로고
    • Selecting a suitable procurement method for a building project
    • Love, P.E.D., Skitmore, R.M. and Earl, G. (1998b), "Selecting a suitable procurement method for a building project", Construction Management and Economics, Vol. 16 No. 2, pp. 221-33.
    • (1998) Construction Management and Economics , vol.16 , Issue.2 , pp. 221-233
    • Love, P.E.D.1    Skitmore, R.M.2    Earl, G.3
  • 52
    • 0038484978 scopus 로고    scopus 로고
    • Total quality management and the learning organization: A dialogue for change in construction
    • Love, P.E.D., Li, H., Irni, Z. and Faniran, O. (2000), "Total quality management and the learning organization: a dialogue for change in construction", Construction Management and Economics, Vol. 18 No. 3, pp. 321-32.
    • (2000) Construction Management and Economics , vol.18 , Issue.3 , pp. 321-332
    • Love, P.E.D.1    Li, H.2    Irni, Z.3    Faniran, O.4
  • 53
    • 0009126525 scopus 로고
    • Improving construction through QFD
    • 12th-14 February, Macquarie University, Sydney, Australia
    • Mohamed, S. (1995), "Improving construction through QFD", Proceedings of the First Pacific Rim Symposium on Quality Deployment, 12th-14 February, Macquarie University, Sydney, Australia, pp. 233-8.
    • (1995) Proceedings of the First Pacific Rim Symposium on Quality Deployment , pp. 233-238
    • Mohamed, S.1
  • 55
    • 0034394634 scopus 로고    scopus 로고
    • Greening the construction supply chain in Singapore
    • Ofori, G. (2000), "Greening the construction supply chain in Singapore", European Journal of Purchasing and Supply Management, Vol. 6 No. 3-4, pp. 195-206.
    • (2000) European Journal of Purchasing and Supply Management , vol.6 , Issue.3-4 , pp. 195-206
    • Ofori, G.1
  • 56
    • 0002410478 scopus 로고    scopus 로고
    • Chain reaction
    • 12 March
    • Pearson, A. (1999), "Chain reaction", Building, 12 March, pp. 54-5.
    • (1999) Building , pp. 54-55
    • Pearson, A.1
  • 60
    • 84986085484 scopus 로고    scopus 로고
    • Strategic needs analysis: Its role in brief development
    • Smith, J. and Jackson, N. (2000), "Strategic needs analysis: its role in brief development", Facilities, Vol. 18 No. 13-14, pp. 502-12.
    • (2000) Facilities , vol.18 , Issue.13-14 , pp. 502-512
    • Smith, J.1    Jackson, N.2
  • 61
    • 0019597497 scopus 로고
    • The design structure system: A method for managing the design of complex systems
    • Steward, D.V. (1981), "The design structure system: a method for managing the design of complex systems", IEEE Transactions on Engineering Management, Vol. 1 No. 3, pp. 71-4.
    • (1981) IEEE Transactions on Engineering Management , vol.1 , Issue.3 , pp. 71-74
    • Steward, D.V.1
  • 65
    • 2342646504 scopus 로고    scopus 로고
    • Project alliancing v. project partnering: A case study of the Australian National Museum project
    • Walker, D.H.T., Hampson, K. and Peters, R. (2002), "Project alliancing v. project partnering: a case study of the Australian National Museum project", Supply Chain Management: An International Journal, Vol. 7 No. 2, pp. 83-91.
    • (2002) Supply Chain Management: An International Journal , vol.7 , Issue.2 , pp. 83-91
    • Walker, D.H.T.1    Hampson, K.2    Peters, R.3
  • 66
    • 0442325259 scopus 로고    scopus 로고
    • Total quality management in the construction industry in Hong Kong. A supply chain management perspective
    • Wong, A. and Fung, P. (1998), "Total quality management in the construction industry in Hong Kong. A supply chain management perspective", Total Quality Management, Vol. 10 No. 2, pp. 199-208.
    • (1998) Total Quality Management , vol.10 , Issue.2 , pp. 199-208
    • Wong, A.1    Fung, P.2
  • 67
    • 0542426256 scopus 로고    scopus 로고
    • Quality culture in the construction industry
    • Wong, A. and Kanji, G.K. (1998), "Quality culture in the construction industry", Total Quality Management, Vol. 9 No. 4-5, pp. 133-40.
    • (1998) Total Quality Management , vol.9 , Issue.4-5 , pp. 133-140
    • Wong, A.1    Kanji, G.K.2
  • 68
    • 2342559532 scopus 로고    scopus 로고
    • Pre-qualification criteria - A survey of UK construction practitioners' opinions
    • Wong, C.H., Holt, G.D. and Harris, P.T. (2001), "Pre-qualification criteria - a survey of UK construction practitioners' opinions", Journal of Construction Research, Vol. 2 No. 1, pp. 41-56.
    • (2001) Journal of Construction Research , vol.2 , Issue.1 , pp. 41-56
    • Wong, C.H.1    Holt, G.D.2    Harris, P.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.