-
1
-
-
84860716685
-
Designing for manufacturing flexibility: A newsvendor approach
-
Abdel-Malek, L.L., Areeratchakul, N. and Otegbeye, M.K. (2006) 'Designing for manufacturing flexibility: A newsvendor approach', International Journal of Industrial and Systems Engineering, Vol. 1, Nos. 1/2, pp.201-220.
-
(2006)
International Journal of Industrial and Systems Engineering
, vol.1
, Issue.1-2
, pp. 201-220
-
-
Abdel-Malek, L.L.1
Areeratchakul, N.2
Otegbeye, M.K.3
-
2
-
-
40749101883
-
Advanced multiple-product manufacturing system modelling using Coloured Petri Net
-
Tokyo, pp
-
Aized, T., Takahashi, K. and Hagiwara, I. (2006) 'Advanced multiple-product manufacturing system modelling using Coloured Petri Net', Proceedings of Joint 3rd International Conference on Soft Computing and Intelligent Systems and 7th International Symposium on advanced Intelligent Systems (SCIS & ISIS 2006), Tokyo, pp.2075-2080.
-
(2006)
Proceedings of Joint 3rd International Conference on Soft Computing and Intelligent Systems and 7th International Symposium on advanced Intelligent Systems (SCIS & ISIS 2006)
, pp. 2075-2080
-
-
Aized, T.1
Takahashi, K.2
Hagiwara, I.3
-
4
-
-
33750736680
-
Flexibility performance: Taguchi's method study of physical system and operating control parameters of FMS'
-
Chan, F.T.S., Bhagwat, R. and Wadhawa, S. (2007) 'Flexibility performance: Taguchi's method study of physical system and operating control parameters of FMS', Robotics and Computer-Integrated Manufacturing, Vol. 23, pp.25-37.
-
(2007)
Robotics and Computer-Integrated Manufacturing
, vol.23
, pp. 25-37
-
-
Chan, F.T.S.1
Bhagwat, R.2
Wadhawa, S.3
-
5
-
-
27944446033
-
An augmented Petri net for modelling and control of assembly tasks with uncertainties
-
Chung, S.Y. and Lee, D.Y. (2005) 'An augmented Petri net for modelling and control of assembly tasks with uncertainties', International Journal of Computer Integrated Manufacturing, Vol. 18, Nos. 2/3, pp.170-178.
-
(2005)
International Journal of Computer Integrated Manufacturing
, vol.18
, Issue.2-3
, pp. 170-178
-
-
Chung, S.Y.1
Lee, D.Y.2
-
6
-
-
0000432952
-
Simultaneous optimization of several response variables
-
Derringer, G. and Suich, R. (1980) 'Simultaneous optimization of several response variables', Journal of Quality Technology, Vol. 12, pp.214-219.
-
(1980)
Journal of Quality Technology
, vol.12
, pp. 214-219
-
-
Derringer, G.1
Suich, R.2
-
8
-
-
0142165718
-
Efficient search of Petri nets for deadlock-free scheduling in FMSs using heuristic functions
-
ElMakkaway, Y.T. and ElMaraghay, A.H. (2003a) 'Efficient search of Petri nets for deadlock-free scheduling in FMSs using heuristic functions', International Journal of Computer Integrated Manufacturing, Vol. 16, No. 1, pp. 14-24.
-
(2003)
International Journal of Computer Integrated Manufacturing
, vol.16
, Issue.1
, pp. 14-24
-
-
ElMakkaway, Y.T.1
ElMaraghay, A.H.2
-
10
-
-
28044436305
-
Optimization of a multi-response problem in Taguchi's dynamic system'
-
Hsieh, K.L., Tong, L.I., Chin, H.P. and Yeh, H.Y. (2005) 'Optimization of a multi-response problem in Taguchi's dynamic system', Computers and Industrial Engineering, Vol. 49, No. 4, pp.556-571.
-
(2005)
Computers and Industrial Engineering
, vol.49
, Issue.4
, pp. 556-571
-
-
Hsieh, K.L.1
Tong, L.I.2
Chin, H.P.3
Yeh, H.Y.4
-
11
-
-
40749143321
-
Modelling and analysis of supply chain dynamics: A High Intelligent Time (HIT) Petri net based approach
-
Jain, V., Wadhwa, S. and Deshmukh, S.G. (2006) 'Modelling and analysis of supply chain dynamics: A High Intelligent Time (HIT) Petri net based approach', International Journal of Industrial and Systems Engineering, Vol. 1, Nos. 1/2, pp.59-86.
-
(2006)
International Journal of Industrial and Systems Engineering
, vol.1
, Issue.1-2
, pp. 59-86
-
-
Jain, V.1
Wadhwa, S.2
Deshmukh, S.G.3
-
13
-
-
2042541402
-
A simulation optimization based control policy for failure prone one machine, two-product manufacturing systems
-
Kenne, J.P. and Gharbi, A. (2004) 'A simulation optimization based control policy for failure prone one machine, two-product manufacturing systems', Computers and Industrial Engineering, Vol. 46, pp.285-292.
-
(2004)
Computers and Industrial Engineering
, vol.46
, pp. 285-292
-
-
Kenne, J.P.1
Gharbi, A.2
-
14
-
-
0038381018
-
Scheduling of a large-scale production system based on a continuous and timed Petri net model
-
Kim, W.Y., Inaba, A., Suzuki, T. and Okuma, S. (2003) 'Scheduling of a large-scale production system based on a continuous and timed Petri net model', IEICE Transactions on Information and Systems, Vol. E86-D, No. 3, pp.583-593.
-
(2003)
IEICE Transactions on Information and Systems
, vol.E86-D
, Issue.3
, pp. 583-593
-
-
Kim, W.Y.1
Inaba, A.2
Suzuki, T.3
Okuma, S.4
-
15
-
-
4944222800
-
The use of intelligent feedback for work order release in an uncertain manufacturing system
-
Koh, S.C.L. and Saad, S.M. (2004) 'The use of intelligent feedback for work order release in an uncertain manufacturing system', Robotics and Computer-Integrated Manufacturing, Vol. 20, pp. 517-527.
-
(2004)
Robotics and Computer-Integrated Manufacturing
, vol.20
, pp. 517-527
-
-
Koh, S.C.L.1
Saad, S.M.2
-
16
-
-
84896692772
-
The practitioner's guide to coloured Petri nets'
-
Kristensen, L.M., Christensen, S. and Jensen, K. (1998) 'The practitioner's guide to coloured Petri nets', International Journal on Software Tools for Technology Transfer, Vol. 2, pp.98-132.
-
(1998)
International Journal on Software Tools for Technology Transfer
, vol.2
, pp. 98-132
-
-
Kristensen, L.M.1
Christensen, S.2
Jensen, K.3
-
17
-
-
3142746019
-
Comparison of OR and AI methods in discrete manufacturing using fuzzy logic
-
Kubat, C., Taskin, H., Topal, B. and Turgey, S. (2004) 'Comparison of OR and AI methods in discrete manufacturing using fuzzy logic', Journal of Intelligent Manufacturing, Vol. 15, No. 4, pp.517-526.
-
(2004)
Journal of Intelligent Manufacturing
, vol.15
, Issue.4
, pp. 517-526
-
-
Kubat, C.1
Taskin, H.2
Topal, B.3
Turgey, S.4
-
18
-
-
8644277055
-
Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability
-
Kumar, R., Tiwari, K.M. and Allada, A. (2004) 'Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability', International Journal of Production Research, Vol. 42, No. 21, pp.4431-4455.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.21
, pp. 4431-4455
-
-
Kumar, R.1
Tiwari, K.M.2
Allada, A.3
-
19
-
-
0242493312
-
Scheduling of manufacturing systems: An ant colony optimization approach
-
Kumar, R., Tiwari, M.K. and Shankar, R. (2003a) 'Scheduling of manufacturing systems: An ant colony optimization approach', Journal of Engineering Manufacture, Vol. 217, No. 10, pp.1443-1453.
-
(2003)
Journal of Engineering Manufacture
, vol.217
, Issue.10
, pp. 1443-1453
-
-
Kumar, R.1
Tiwari, M.K.2
Shankar, R.3
-
20
-
-
0242333183
-
Expert enhanced coloured stochastic Petri net and its applications in assembly/ disassembly
-
Kumar, S., Kumar, R., Shankar, R. and Tiwari, M.K. (2003b) 'Expert enhanced coloured stochastic Petri net and its applications in assembly/ disassembly', International Journal of Production Research, Vol. 41, No. 12, pp.2727-2762.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.12
, pp. 2727-2762
-
-
Kumar, S.1
Kumar, R.2
Shankar, R.3
Tiwari, M.K.4
-
22
-
-
3242697916
-
Modelling and scheduling of ratio-driven FMS using unfolding time Petri nets
-
Lee, J. and Korbaa, O. (2004) 'Modelling and scheduling of ratio-driven FMS using unfolding time Petri nets', Computers and Industrial Engineering, Vol. 46, pp.639-653.
-
(2004)
Computers and Industrial Engineering
, vol.46
, pp. 639-653
-
-
Lee, J.1
Korbaa, O.2
-
23
-
-
40749109141
-
The impact of facility layout on overall manufacturing system performance
-
Lim, H. and Noble, J.S. (2006) 'The impact of facility layout on overall manufacturing system performance', International Journal of Industrial and Systems Engineering, Vol. 1, No. 3, pp.357-371.
-
(2006)
International Journal of Industrial and Systems Engineering
, vol.1
, Issue.3
, pp. 357-371
-
-
Lim, H.1
Noble, J.S.2
-
24
-
-
27944498107
-
Modelling of a large scale complex re-entrant manufacturing system by extended object oriented Petri nets
-
Liu, H., Jiang, Z. and Fung, R.Y.K. (2005) 'Modelling of a large scale complex re-entrant manufacturing system by extended object oriented Petri nets', International Journal of Advanced Manufacturing Technology, Vol. 27, pp. 190-204.
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.27
, pp. 190-204
-
-
Liu, H.1
Jiang, Z.2
Fung, R.Y.K.3
-
25
-
-
0242660612
-
Multiple-objective real-time-scheduler for semiconductor wafer fab using coloured timed object-oriented Petri net (CTOPN)
-
Man and Cybernetics
-
Liu, H., Jiang, Z., Lee, F.Y. and. Fung, Y.K.R (2003) 'Multiple-objective real-time-scheduler for semiconductor wafer fab using coloured timed object-oriented Petri net (CTOPN)', IEEE International Conference on Systems, Man and Cybernetics, Vol. 1, pp.510-515.
-
(2003)
IEEE International Conference on Systems
, vol.1
, pp. 510-515
-
-
Liu, H.1
Jiang, Z.2
Lee, F.Y.3
Fung, Y.K.R.4
-
26
-
-
40749100803
-
Hybrid Petri net and digraph approach for deadlock prevention in automated manufacturing systems
-
Maione, G. and DiCesare, F. (2005) 'Hybrid Petri net and digraph approach for deadlock prevention in automated manufacturing systems', International Journal of Production Research, Vol. 13, No. 24, pp.5131-5159.
-
(2005)
International Journal of Production Research
, vol.13
, Issue.24
, pp. 5131-5159
-
-
Maione, G.1
DiCesare, F.2
-
28
-
-
0442326667
-
Consideration of machine breakdown in the control of flexible production systems
-
Ounnar, F. and Ladet, P. (2004) 'Consideration of machine breakdown in the control of flexible production systems', International Journal of Computer Integrated Manufacturing, Vol. 17, No. 1, pp.69-82.
-
(2004)
International Journal of Computer Integrated Manufacturing
, vol.17
, Issue.1
, pp. 69-82
-
-
Ounnar, F.1
Ladet, P.2
-
29
-
-
13544260531
-
A real-time methodology for minimizing mean flowtime in FMSs with routing flexibility: Threshold-based alternate routing
-
Pp
-
Ozmutlu, S. and Harmonosky, C.M. (2005) 'A real-time methodology for minimizing mean flowtime in FMSs with routing flexibility: threshold-based alternate routing', European Journal of Operational Research, Vol. 166, Pp.369-384.
-
(2005)
European Journal of Operational Research
, vol.166
, pp. 369-384
-
-
Ozmutlu, S.1
Harmonosky, C.M.2
-
30
-
-
30344436989
-
A practical approach to the scheduling of manufacturing system using fuzzy optimization technique
-
Park, S.K. and Woo, K.B. (2005) 'A practical approach to the scheduling of manufacturing system using fuzzy optimization technique', IEICE Transactions on Information and Systems, Vol. E88-D, No. 12, pp.2871-2875.
-
(2005)
IEICE Transactions on Information and Systems
, vol.E88-D
, Issue.12
, pp. 2871-2875
-
-
Park, S.K.1
Woo, K.B.2
-
31
-
-
33745698730
-
Sequencing and scheduling of job and tool in a flexible manufacturing cell
-
Prabaharan, T., Nakkeeran, P.R. and Jawahar, N. (2006) 'Sequencing and scheduling of job and tool in a flexible manufacturing cell', International Journal of Advanced Manufacturing Technology, Vol. 29, Nos. 7/8, pp.729-745.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.29
, Issue.7-8
, pp. 729-745
-
-
Prabaharan, T.1
Nakkeeran, P.R.2
Jawahar, N.3
-
32
-
-
0036923791
-
A statistical process control approach for estimating the warm-up period
-
Robinson, S. (2002) 'A statistical process control approach for estimating the warm-up period', Proceedings of 2002 Winter Simulation Conference, pp.439-445.
-
(2002)
Proceedings of 2002 Winter Simulation Conference
, pp. 439-445
-
-
Robinson, S.1
-
33
-
-
22344431748
-
Performance analysis of an FMS operating under different failure rates and maintenance policies
-
Savsar, M. (2005) 'Performance analysis of an FMS operating under different failure rates and maintenance policies', The International Journal of Flexible Manufacturing Systems, Vol. 16, pp.229-249.
-
(2005)
The International Journal of Flexible Manufacturing Systems
, vol.16
, pp. 229-249
-
-
Savsar, M.1
-
34
-
-
0037381598
-
Combined Petri net modelling and AI based heuristic hybrid search for flexible manufacturing systems-part 1. Petri net modelling and heuristic search
-
Yu, H., Reyes, A., Cang, S. and Lloyd, S. (2003) 'Combined Petri net modelling and AI based heuristic hybrid search for flexible manufacturing systems-part 1. Petri net modelling and heuristic search', Computers and Industrial Engineering, Vol. 44, pp.527-543.
-
(2003)
Computers and Industrial Engineering
, vol.44
, pp. 527-543
-
-
Yu, H.1
Reyes, A.2
Cang, S.3
Lloyd, S.4
-
35
-
-
0036573944
-
A knowledge Petri net model for flexible manufacturing systems and its application for design and verification of FMS controllers
-
Zha, X.F., Li, L.L. and Zhang, W.J. (2002) 'A knowledge Petri net model for flexible manufacturing systems and its application for design and verification of FMS controllers', International Journal of Computer Integrated Manufacturing, Vol. 15, No. 3, pp.242-264.
-
(2002)
International Journal of Computer Integrated Manufacturing
, vol.15
, Issue.3
, pp. 242-264
-
-
Zha, X.F.1
Li, L.L.2
Zhang, W.J.3
-
36
-
-
33750224787
-
Effective genetic approach for optimizing advanced planning and scheduling in flexible manufacturing system
-
Zhang, H. and Gen, M. (2006) 'Effective genetic approach for optimizing advanced planning and scheduling in flexible manufacturing system', Genetic and Evolutionary Computation Conference, pp. 1841-1848.
-
(2006)
Genetic and Evolutionary Computation Conference
, pp. 1841-1848
-
-
Zhang, H.1
Gen, M.2
|