메뉴 건너뛰기




Volumn 23, Issue 1, 2007, Pages 25-37

Flexibility performance: Taguchi's method study of physical system and operating control parameters of FMS

Author keywords

Control strategies; Flexibility levels; Flexible manufacturing system; Physical and operating parameters; Taguchi's method

Indexed keywords

CONTROL SYSTEMS; PARAMETER ESTIMATION; SCHEDULING;

EID: 33750736680     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rcim.2005.09.002     Document Type: Article
Times cited : (27)

References (36)
  • 1
    • 0040547245 scopus 로고
    • Modular system design and control for flexible assembly
    • Rajput S., and Bennett D. Modular system design and control for flexible assembly. Int J Oper Product Manage 9 7 (1989) 17-29
    • (1989) Int J Oper Product Manage , vol.9 , Issue.7 , pp. 17-29
    • Rajput, S.1    Bennett, D.2
  • 3
    • 4344584596 scopus 로고    scopus 로고
    • Multi-criteria dynamic scheduling methodology for controlling a flexible manufacturing system
    • Shnits B., Rubinovittz J., and Sinreich D. Multi-criteria dynamic scheduling methodology for controlling a flexible manufacturing system. Int J Product Res 42 17 (2004) 3457-3472
    • (2004) Int J Product Res , vol.42 , Issue.17 , pp. 3457-3472
    • Shnits, B.1    Rubinovittz, J.2    Sinreich, D.3
  • 4
    • 12944266882 scopus 로고    scopus 로고
    • Judicious increase in flexibility and decision automation in semi-computerized flexible manufacturing (SCFM) systems
    • Wadhwa S., and Bhagwat R. Judicious increase in flexibility and decision automation in semi-computerized flexible manufacturing (SCFM) systems. Int J Stud Inform Control 7 4 (1998) 329-342
    • (1998) Int J Stud Inform Control , vol.7 , Issue.4 , pp. 329-342
    • Wadhwa, S.1    Bhagwat, R.2
  • 6
    • 0030086421 scopus 로고    scopus 로고
    • Framework to analyse flexibility and unplanned change in manufacturing systems
    • Correa H.L., and Slack N. Framework to analyse flexibility and unplanned change in manufacturing systems. Comput Integrat Manuf Systems 9 1 (1996) 57-64
    • (1996) Comput Integrat Manuf Systems , vol.9 , Issue.1 , pp. 57-64
    • Correa, H.L.1    Slack, N.2
  • 7
    • 0023964447 scopus 로고
    • Flexibility in manufacturing systems: definitions and petri net modeling
    • Barad M., and Sipper D. Flexibility in manufacturing systems: definitions and petri net modeling. Int J Product Res 26 2 (1988) 237-248
    • (1988) Int J Product Res , vol.26 , Issue.2 , pp. 237-248
    • Barad, M.1    Sipper, D.2
  • 8
    • 0001944856 scopus 로고
    • A framework for understanding flexibility of manufacturing systems
    • Gupta D., and Buzacott J.A. A framework for understanding flexibility of manufacturing systems. J Manuf Systems 8 2 (1989) 89-97
    • (1989) J Manuf Systems , vol.8 , Issue.2 , pp. 89-97
    • Gupta, D.1    Buzacott, J.A.2
  • 9
    • 0036640379 scopus 로고    scopus 로고
    • Production capacity of flexible manufacturing systems with fixed production ratios
    • Buitenhek R., Baynat B., and Dallery Y. Production capacity of flexible manufacturing systems with fixed production ratios. Int J Flexible Manuf System 14 3 (2002) 203-226
    • (2002) Int J Flexible Manuf System , vol.14 , Issue.3 , pp. 203-226
    • Buitenhek, R.1    Baynat, B.2    Dallery, Y.3
  • 10
    • 0027208299 scopus 로고
    • The integration of process planning and machine loading in small batch manufacturing
    • Lenderink A., and Kals H.J.J. The integration of process planning and machine loading in small batch manufacturing. Robotics Comput Integrat Manuf 10 1/2 (1993) 88-98
    • (1993) Robotics Comput Integrat Manuf , vol.10 , Issue.1-2 , pp. 88-98
    • Lenderink, A.1    Kals, H.J.J.2
  • 11
    • 33645196693 scopus 로고
    • Market-driven strategies and the design of flexible production systems: evidence from the electronics industry
    • Bennett D., Forrester P., and Hassard J. Market-driven strategies and the design of flexible production systems: evidence from the electronics industry. Int J Oper Produc Manage 12 2 (1992) 25-43
    • (1992) Int J Oper Produc Manage , vol.12 , Issue.2 , pp. 25-43
    • Bennett, D.1    Forrester, P.2    Hassard, J.3
  • 12
    • 0345876951 scopus 로고    scopus 로고
    • Evolutionary simulation-based-design (ESBD) methodology for large computer integrated manufacturing systems
    • Shin J.G., and Sohn S.J. Evolutionary simulation-based-design (ESBD) methodology for large computer integrated manufacturing systems. Int J Comput Integrat Manuf 14 4 (2001) 385-398
    • (2001) Int J Comput Integrat Manuf , vol.14 , Issue.4 , pp. 385-398
    • Shin, J.G.1    Sohn, S.J.2
  • 13
    • 12944269060 scopus 로고    scopus 로고
    • Flexibility: an emerging meta-competence for managing high technology
    • Wadhwa S., and Rao K.S. Flexibility: an emerging meta-competence for managing high technology. Int J Technol Manage 19 7/8 (2000) 820-845
    • (2000) Int J Technol Manage , vol.19 , Issue.7-8 , pp. 820-845
    • Wadhwa, S.1    Rao, K.S.2
  • 14
    • 0002580865 scopus 로고
    • An agenda for research on flexibility of manufacturing systems
    • Gerwin D. An agenda for research on flexibility of manufacturing systems. Int J Oper Product Manage 17 1 (1986) 38-49
    • (1986) Int J Oper Product Manage , vol.17 , Issue.1 , pp. 38-49
    • Gerwin, D.1
  • 15
    • 0001698924 scopus 로고
    • A survey and critical review of flexibility measures in manufacturing systems
    • Sarker B.R., Krishnamurthy S., and Kuthethur S.G. A survey and critical review of flexibility measures in manufacturing systems. Product Plan Control 5 6 (1994) 512-523
    • (1994) Product Plan Control , vol.5 , Issue.6 , pp. 512-523
    • Sarker, B.R.1    Krishnamurthy, S.2    Kuthethur, S.G.3
  • 17
    • 0001827599 scopus 로고
    • Classification and review of FMS scheduling procedures
    • Rachamadugu R., and Stecke K.E. Classification and review of FMS scheduling procedures. Product Plan Control 5 1 (1994) 2-20
    • (1994) Product Plan Control , vol.5 , Issue.1 , pp. 2-20
    • Rachamadugu, R.1    Stecke, K.E.2
  • 18
    • 0028570977 scopus 로고
    • Quantifying the flexibility value in automated manufacturing systems
    • Pyoun Y.S., and Choi B.K. Quantifying the flexibility value in automated manufacturing systems. J Manuf Systems 13 2 (1994) 108-118
    • (1994) J Manuf Systems , vol.13 , Issue.2 , pp. 108-118
    • Pyoun, Y.S.1    Choi, B.K.2
  • 19
    • 0029732144 scopus 로고    scopus 로고
    • The measurement of flexibility in manufacturing systems
    • Sanchoy K.D. The measurement of flexibility in manufacturing systems. Int J Flexible Manuf Systems 8 1 (1996) 67-94
    • (1996) Int J Flexible Manuf Systems , vol.8 , Issue.1 , pp. 67-94
    • Sanchoy, K.D.1
  • 20
    • 0035482672 scopus 로고    scopus 로고
    • Performance evaluation of flexible manufacturing systems with finite local buffers: fixed and dynamic routings
    • Matsui M., Uehara S., and Ma J. Performance evaluation of flexible manufacturing systems with finite local buffers: fixed and dynamic routings. Int J Flexible Manuf System 13 4 (2001) 405-424
    • (2001) Int J Flexible Manuf System , vol.13 , Issue.4 , pp. 405-424
    • Matsui, M.1    Uehara, S.2    Ma, J.3
  • 21
    • 0035249757 scopus 로고    scopus 로고
    • Manufacturing cell performance improvement: a simulation study
    • Selen W.J., and Ashayeri J. Manufacturing cell performance improvement: a simulation study. Robotics Comput Integrat Manuf 17 1-2 (2001) 169-176
    • (2001) Robotics Comput Integrat Manuf , vol.17 , Issue.1-2 , pp. 169-176
    • Selen, W.J.1    Ashayeri, J.2
  • 22
    • 0035922494 scopus 로고    scopus 로고
    • Routing based reactive scheduling policies for machine failure in dynamic job-shop
    • Kuntanoglu E., and Sabuncuoglu I. Routing based reactive scheduling policies for machine failure in dynamic job-shop. Int J Product Res 39 14 (2001) 3141-3158
    • (2001) Int J Product Res , vol.39 , Issue.14 , pp. 3141-3158
    • Kuntanoglu, E.1    Sabuncuoglu, I.2
  • 23
    • 1942472532 scopus 로고    scopus 로고
    • Solving machine loading problem in flexible manufacturing system using a combinatorial auction-based approach
    • Srinivas, Tiwari M.K., and Allada V. Solving machine loading problem in flexible manufacturing system using a combinatorial auction-based approach. Int J Product Res 42 9 (2004) 1879-1893
    • (2004) Int J Product Res , vol.42 , Issue.9 , pp. 1879-1893
    • Srinivas1    Tiwari, M.K.2    Allada, V.3
  • 24
    • 0032641064 scopus 로고    scopus 로고
    • Scheduling in the dynamic job-shop under auxiliary resource constraints-a simulation study
    • Gargeya V.B., and Deane R.H. Scheduling in the dynamic job-shop under auxiliary resource constraints-a simulation study. Int J Product Res 37 12 (1999) 2817-2834
    • (1999) Int J Product Res , vol.37 , Issue.12 , pp. 2817-2834
    • Gargeya, V.B.1    Deane, R.H.2
  • 25
    • 0242493312 scopus 로고    scopus 로고
    • Scheduling of flexible manufacturing systems: an ant colony optimization approach
    • Kumar R., Tiwari M.K., and Shankar R. Scheduling of flexible manufacturing systems: an ant colony optimization approach. Proc Inst Mech Eng 217 10 (2003) 1443-1453
    • (2003) Proc Inst Mech Eng , vol.217 , Issue.10 , pp. 1443-1453
    • Kumar, R.1    Tiwari, M.K.2    Shankar, R.3
  • 26
    • 0035872172 scopus 로고    scopus 로고
    • Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab
    • Wang F.K., and Yen P.Y. Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab. Int J Product Res 39 6 (2001) 1221-1238
    • (2001) Int J Product Res , vol.39 , Issue.6 , pp. 1221-1238
    • Wang, F.K.1    Yen, P.Y.2
  • 27
    • 0036640167 scopus 로고    scopus 로고
    • Vehicle travel time models for AGV systems under various dispatching rules
    • Koo P.H., and Jang J. Vehicle travel time models for AGV systems under various dispatching rules. Int J Flexible Manuf System 14 3 (2002) 249-262
    • (2002) Int J Flexible Manuf System , vol.14 , Issue.3 , pp. 249-262
    • Koo, P.H.1    Jang, J.2
  • 28
    • 0033115993 scopus 로고    scopus 로고
    • Evaluations of operational control rules in scheduling a flexible manufacturing system
    • Chan F.T.S. Evaluations of operational control rules in scheduling a flexible manufacturing system. Robotics Comput Integrat Manuf 15 (1999) 121-132
    • (1999) Robotics Comput Integrat Manuf , vol.15 , pp. 121-132
    • Chan, F.T.S.1
  • 29
    • 0032641794 scopus 로고    scopus 로고
    • Part dispatching and machine loading in flexible manufacturing systems using central queues
    • Gupta J.N.D., Luong L.H.S., and Nguyen V.H. Part dispatching and machine loading in flexible manufacturing systems using central queues. Int J Product Res 37 6 (1999) 1427-1435
    • (1999) Int J Product Res , vol.37 , Issue.6 , pp. 1427-1435
    • Gupta, J.N.D.1    Luong, L.H.S.2    Nguyen, V.H.3
  • 30
    • 0032642484 scopus 로고    scopus 로고
    • Reduced simulation models of wafer fabrication facilities
    • Hung Y.F., and Leachman R.C. Reduced simulation models of wafer fabrication facilities. Int J Product Res 37 12 (1999) 2685-2701
    • (1999) Int J Product Res , vol.37 , Issue.12 , pp. 2685-2701
    • Hung, Y.F.1    Leachman, R.C.2
  • 31
    • 0042761187 scopus 로고    scopus 로고
    • Effects of routing flexibility on a flexible manufacturing system
    • Chan F.T.S. Effects of routing flexibility on a flexible manufacturing system. Int J Comput Integrat Manuf 14 5 (2001) 431-445
    • (2001) Int J Comput Integrat Manuf , vol.14 , Issue.5 , pp. 431-445
    • Chan, F.T.S.1
  • 32
    • 0344875549 scopus 로고    scopus 로고
    • An object-oriented approach for flexible manufacturing control systems analysis and design using the unified modeling language
    • Bruccoleri M., Sergio N.L., and Perrone G. An object-oriented approach for flexible manufacturing control systems analysis and design using the unified modeling language. Int J Flexible Manuf System 15 3 (2003) 195-216
    • (2003) Int J Flexible Manuf System , vol.15 , Issue.3 , pp. 195-216
    • Bruccoleri, M.1    Sergio, N.L.2    Perrone, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.