-
1
-
-
0031275801
-
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
-
Roh HK, Kim YD (1997) Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter. Int J Prod Res 35(11):2989-3003
-
(1997)
Int J Prod Res
, vol.35
, Issue.11
, pp. 2989-3003
-
-
Roh, H.K.1
Kim, Y.D.2
-
2
-
-
0031233993
-
Simultaneous scheduling of work pieces, fixtures and cutting tools with in FMCs
-
Rahimifard S, Newman ST (1997) Simultaneous scheduling of work pieces, fixtures and cutting tools with in FMCs. Int J Prod Res 35(9):2379-2396
-
(1997)
Int J Prod Res
, vol.35
, Issue.9
, pp. 2379-2396
-
-
Rahimifard, S.1
Newman, S.T.2
-
4
-
-
0032671437
-
Joint lot sizing and tool management in a CNC environment
-
Selim Akturk M, Siraceddin O (1999) Joint lot sizing and tool management in a CNC environment. Comput Ind 40:61-74
-
(1999)
Comput Ind
, vol.40
, pp. 61-74
-
-
Selim Akturk, M.1
Siraceddin, O.2
-
7
-
-
0040909326
-
Solving tool allocation problem in flexible manufacturing system
-
Mukhopadhyay SK, Nandi PK (1999) Solving tool allocation problem in flexible manufacturing system. Ind Eng (India) J 80:16-20
-
(1999)
Ind Eng (India) J
, vol.80
, pp. 16-20
-
-
Mukhopadhyay, S.K.1
Nandi, P.K.2
-
8
-
-
0032671434
-
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter
-
Jun H-B, Kim Y-D, Suh H-W (1999) Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter. IEEE Trans Robot Automat 15(3):488-496
-
(1999)
IEEE Trans Robot Automat
, vol.15
, Issue.3
, pp. 488-496
-
-
Jun, H.-B.1
Kim, Y.-D.2
Suh, H.-W.3
-
9
-
-
33745710990
-
A synthesis of decision models for tool management in automated manufacturing
-
Gray AE, Seidmann A, Stecke KE (1990) A synthesis of decision models for tool management in automated manufacturing. Manage Sci 39:249-567
-
(1990)
Manage Sci
, vol.39
, pp. 249-567
-
-
Gray, A.E.1
Seidmann, A.2
Stecke, K.E.3
-
10
-
-
0027928107
-
Intermediate tool requirement planning for FMS
-
KLahator SK, Leung LC (1994) Intermediate tool requirement planning for FMS. J Manuf Syst 13(1):9-19
-
(1994)
J Manuf Syst
, vol.13
, Issue.1
, pp. 9-19
-
-
Klahator, S.K.1
Leung, L.C.2
-
11
-
-
0032641064
-
Scheduling in the dynamic job shop under auxiliary resource constraints: A simulation study
-
Gargeya VB, Deane RH (1999) Scheduling in the dynamic job shop under auxiliary resource constraints: a simulation study. Int J Prod Res 37(12):2817-2834
-
(1999)
Int J Prod Res
, vol.37
, Issue.12
, pp. 2817-2834
-
-
Gargeya, V.B.1
Deane, R.H.2
-
14
-
-
0022940876
-
Tooling concept for FMS
-
Rathmill K (ed). IPS, New York
-
Tomek P, (1986) Tooling concept for FMS. In: Rathmill K (ed) Proc 5th International Conference of FMS. IPS, New York, pp 315-326
-
(1986)
Proc 5th International Conference of FMS
, pp. 315-326
-
-
Tomek, P.1
-
15
-
-
0024716540
-
Real-time tool control and job dispatching in flexible manufacturing systems
-
Han MH, Na YK, Hogg GL (1989) Real-time tool control and job dispatching in flexible manufacturing systems. Int J Prod Res 27: 1257-1267
-
(1989)
Int J Prod Res
, vol.27
, pp. 1257-1267
-
-
Han, M.H.1
Na, Y.K.2
Hogg, G.L.3
-
16
-
-
0026850995
-
A comparison of tool management strategies and part selection rules for flexible manufacturing systems
-
Kwasi A-G, Mededith JR, Raturi A (1992) A comparison of tool management strategies and part selection rules for flexible manufacturing systems. Int J Prod Res 30:733-748
-
(1992)
Int J Prod Res
, vol.30
, pp. 733-748
-
-
Kwasi, A.-G.1
Mededith, J.R.2
Raturi, A.3
-
17
-
-
0031070617
-
Joint job/tool scheduling in a FMC with no on-board tool magazine
-
Agnetis A, Alfieri A, Brandimarte P, Prinsecchi P (1997) Joint job/tool scheduling in a FMC with no on-board tool magazine. Comput Integr Manuf Syst 10(1):61-68
-
(1997)
Comput Integr Manuf Syst
, vol.10
, Issue.1
, pp. 61-68
-
-
Agnetis, A.1
Alfieri, A.2
Brandimarte, P.3
Prinsecchi, P.4
-
18
-
-
0025449198
-
Simulated annealing: A tool for operational research
-
Eglese RW (1990) Simulated annealing: a tool for operational research. Eur.T Oper Res 46:271-281
-
(1990)
Eur.T Oper Res
, vol.46
, pp. 271-281
-
-
Eglese, R.W.1
-
19
-
-
0034692672
-
Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach
-
Tiwari MK, Vidyarthi NK (2000) Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach. Int J Prod Res 38(14):3357-3384
-
(2000)
Int J Prod Res
, vol.38
, Issue.14
, pp. 3357-3384
-
-
Tiwari, M.K.1
Vidyarthi, N.K.2
-
20
-
-
0000131281
-
Algorithms for solving production scheduling problems
-
Giffler B, Thompson GL (1960) Algorithms for solving production scheduling problems. Int J Oper Res 8:487-503
-
(1960)
Int J Oper Res
, vol.8
, pp. 487-503
-
-
Giffler, B.1
Thompson, G.L.2
-
21
-
-
0027595170
-
Giffler and Thompson algorithm for job shop scheduling is still good for flexible manufacturing systems
-
Nascimento MA (1993) Giffler and Thompson algorithm for job shop scheduling is still good for flexible manufacturing systems. J Oper Res Soc 44(5):521-524
-
(1993)
J Oper Res Soc
, vol.44
, Issue.5
, pp. 521-524
-
-
Nascimento, M.A.1
-
22
-
-
0029344295
-
A comparative study of some priority dispatching rules under different shop loads
-
Waikar AM, Sarkar BR, Lal AM (1995) A comparative study of some priority dispatching rules under different shop loads. Int J Prod Plan Control 6(4):301-310
-
(1995)
Int J Prod Plan Control
, vol.6
, Issue.4
, pp. 301-310
-
-
Waikar, A.M.1
Sarkar, B.R.2
Lal, A.M.3
-
24
-
-
0021819411
-
Thermo dynamical approach to the travelling salesman problem: An efficient simulation algorithm
-
Cerny V (1985) Thermo dynamical approach to the travelling salesman problem: an efficient simulation algorithm. J Optim Theory Appl 45:41-45
-
(1985)
J Optim Theory Appl
, vol.45
, pp. 41-45
-
-
Cerny, V.1
-
25
-
-
5744249209
-
Equation of state calculations by fast computing machines
-
Metropolis N, Rosenbluth A, Rosenbluth M, Teller A, Teller E (1953) Equation of state calculations by fast computing machines. J Chem Phys 21:1087-1092
-
(1953)
J Chem Phys
, vol.21
, pp. 1087-1092
-
-
Metropolis, N.1
Rosenbluth, A.2
Rosenbluth, M.3
Teller, A.4
Teller, E.5
-
26
-
-
0000230214
-
A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem
-
Zeogordi SH, Itoh K, Enkawa T (1995) A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem. Int J Prod Res 33(5): 1449-1466
-
(1995)
Int J Prod Res
, vol.33
, Issue.5
, pp. 1449-1466
-
-
Zeogordi, S.H.1
Itoh, K.2
Enkawa, T.3
-
27
-
-
0034631284
-
Simulated annealing for parallel machine scheduling with earliness - Tardiness penalties and sequence -dependent set-up times
-
Radhakrishnan S, Ventura JA (2000) Simulated annealing for parallel machine scheduling with earliness - tardiness penalties and sequence -dependent set-up times. Int J Prod Res 38(10):233-2252
-
(2000)
Int J Prod Res
, vol.38
, Issue.10
, pp. 233-2252
-
-
Radhakrishnan, S.1
Ventura, J.A.2
-
28
-
-
0344614598
-
Theory and methodology -two simulated annealing-based heuristics for the job shop scheduling problem
-
Steinhofel K, Albrecht a (1999) Wong CK, Theory and methodology -Two simulated annealing-based heuristics for the job shop scheduling problem. Eur J Oper Res 118:524-548
-
(1999)
Eur J Oper Res
, vol.118
, pp. 524-548
-
-
Steinhofel, K.1
Albrecht, A.2
Wong, C.K.3
-
29
-
-
50749136055
-
A simulated annealing heuristic for scheduling in a flow shop with bicriteria
-
Gangadharan R, Rajendran C (1994) A simulated annealing heuristic for scheduling in a flow shop with bicriteria. Comput Ind Eng 27(1-4): 473-476
-
(1994)
Comput Ind Eng
, vol.27
, Issue.1-4
, pp. 473-476
-
-
Gangadharan, R.1
Rajendran, C.2
-
30
-
-
0032043112
-
Scheduling to minimize mean tardiness and weighted mean tardiness in flow shop and flow line-based manufacturing cell
-
Parthasarathy S, Rajendran C (1998) Scheduling to minimize mean tardiness and weighted mean tardiness in flow shop and flow line-based manufacturing cell. Comput Ind Eng 34(2):531-546
-
(1998)
Comput Ind Eng
, vol.34
, Issue.2
, pp. 531-546
-
-
Parthasarathy, S.1
Rajendran, C.2
|