-
1
-
-
4944223478
-
A business model for uncertainty management in the new economy
-
Koh SCL, Saad SM, Gunasekaran A. A business model for uncertainty management in the new economy. Proceedings of the first international conference on performance measures, benchmarking and best practices in new economy, 2003, p. 269-279.
-
(2003)
Proceedings of the First International Conference on Performance Measures, Benchmarking and Best Practices in New Economy
, pp. 269-279
-
-
Koh, S.C.L.1
Saad, S.M.2
Gunasekaran, A.3
-
2
-
-
0037323569
-
MRP-controlled manufacturing environment disturbed by uncertainty
-
Koh SCL, Saad SM. MRP-controlled manufacturing environment disturbed by uncertainty. Int J Robotics Comput Integrated Manuf 2003;19(1-2):157-71.
-
(2003)
Int J Robotics Comput Integrated Manuf
, vol.19
, Issue.1-2
, pp. 157-171
-
-
Koh, S.C.L.1
Saad, S.M.2
-
3
-
-
0032000895
-
Parameters affecting the effectiveness of MRP systems: A review
-
Yeung JH, Wong WCK, Ma L. Parameters affecting the effectiveness of MRP systems: a review. Int J Prod Res 1998; 36(2):313-31.
-
(1998)
Int J Prod Res
, vol.36
, Issue.2
, pp. 313-331
-
-
Yeung, J.H.1
Wong, W.C.K.2
Ma, L.3
-
4
-
-
0034175277
-
A review of techniques for buffering against uncertainty with MRP systems
-
Guide VDR, Srivasta R. A review of techniques for buffering against uncertainty with MRP systems. Int J Prod Planning Control 2000:11(3):223-33.
-
(2000)
Int J Prod Planning Control
, vol.11
, Issue.3
, pp. 223-233
-
-
Guide, V.D.R.1
Srivasta, R.2
-
5
-
-
0037054916
-
Uncertainty under MRP-phanned manufacture: Review and categorisation
-
Koh SCL, Saad SM. Jones MH. Uncertainty under MRP-phanned manufacture: review and categorisation. Int J Prod Res 2002;40(10):2399-421.
-
(2002)
Int J Prod Res
, vol.40
, Issue.10
, pp. 2399-2421
-
-
Koh, S.C.L.1
Saad, S.M.2
Jones, M.H.3
-
6
-
-
0037056090
-
Development of a business model for diagnosing uncertainty in ERP environments
-
Koh SCL, Saad SM. Development of a business model for diagnosing uncertainty in ERP environments. Int J Prod Res 2002;40(13):3015-39.
-
(2002)
Int J Prod Res
, vol.40
, Issue.13
, pp. 3015-3039
-
-
Koh, S.C.L.1
Saad, S.M.2
-
8
-
-
0000470092
-
The impact of safety stock on schedule stability cost and service
-
Sridharan V. LaForge RL. The impact of safety stock on schedule stability cost and service. J Oper Manage 1989:8(4): 327-47.
-
(1989)
J Oper Manage
, vol.8
, Issue.4
, pp. 327-347
-
-
Sridharan, V.1
Laforge, R.L.2
-
9
-
-
0028756018
-
Safety stock vs. safety lead-time in MRP-controlled production systems
-
Buzacott JA, Shanthikumar JG. Safety stock vs. safety lead-time in MRP-controlled production systems. OMEGA Int J Manage Sci 1994:40:1678-89.
-
(1994)
OMEGA Int J Manage Sci
, vol.40
, pp. 1678-1689
-
-
Buzacott, J.A.1
Shanthikumar, J.G.2
-
10
-
-
0005822549
-
-
Report No 212, Institute of Mechanical Engineers, UK
-
Kochhar AK, Ma X, Khan MN. Knowledge-based system approach to the development of accurate and realistic master production schedule. Report No 212, Institute of Mechanical Engineers, UK, 1998.
-
(1998)
Knowledge-based System Approach to the Development of Accurate and Realistic Master Production Schedule
-
-
Kochhar, A.K.1
Ma, X.2
Khan, M.N.3
-
12
-
-
0032366810
-
The value of using scheduling information in planning material requirements
-
Kanet JJ, Sridharan SV. The value of using scheduling information in planning material requirements. Decision Sci J 1998;29(2): 479-98.
-
(1998)
Decision Sci J
, vol.29
, Issue.2
, pp. 479-498
-
-
Kanet, J.J.1
Sridharan, S.V.2
-
13
-
-
85016307418
-
Incorporating maintenance activities into production planning: Integration at the master schedule versus material requirements level
-
Rishel TD, Christy DP. Incorporating maintenance activities into production planning: integration at the master schedule versus material requirements level. Int J Prod Res 1996;34(2): 421-46.
-
(1996)
Int J Prod Res
, vol.34
, Issue.2
, pp. 421-446
-
-
Rishel, T.D.1
Christy, D.P.2
-
14
-
-
0005781873
-
Managing uncertainty in multi-level manufacturing systems
-
Vargas GA, Dear RG. Managing uncertainty in multi-level manufacturing systems. Integrated Manuf Syst 1991;2(4): 14-26.
-
(1991)
Integrated Manuf Syst
, vol.2
, Issue.4
, pp. 14-26
-
-
Vargas, G.A.1
Dear, R.G.2
-
16
-
-
84985773444
-
Resource flexibility issues in multistage manufacturing
-
Malhotra MK, Ritzman LP. Resource flexibility issues in multistage manufacturing. Decision Sci J 1990;21(4):673-90.
-
(1990)
Decision Sci J
, vol.21
, Issue.4
, pp. 673-690
-
-
Malhotra, M.K.1
Ritzman, L.P.2
|