메뉴 건너뛰기




Volumn 31, Issue 2, 2007, Pages 269-279

Supply planning under uncertainties in MRP environments: A state of the art

Author keywords

Inventory control; Planning; Production systems; Uncertainty

Indexed keywords

COST REDUCTION; MATHEMATICAL MODELS; PRODUCTION CONTROL; STRATEGIC PLANNING; SUPPLY CHAINS; UNCERTAINTY ANALYSIS;

EID: 36348929265     PISSN: 13675788     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.arcontrol.2007.02.007     Document Type: Article
Times cited : (158)

References (86)
  • 6
    • 0242301536 scopus 로고    scopus 로고
    • Lead-time reduction in a stochastic inventory system with learning consideration
    • Ben-Daya M., and Hariga M. Lead-time reduction in a stochastic inventory system with learning consideration. International Journal of Production Research 41 3 (2003) 571-579
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 571-579
    • Ben-Daya, M.1    Hariga, M.2
  • 7
    • 84989486124 scopus 로고
    • The effect and cost of forecast error bias for multiple stage production-inventory systems
    • Biggs J., and Campion W. The effect and cost of forecast error bias for multiple stage production-inventory systems. Decision Sciences 13 4 (1982) 570-584
    • (1982) Decision Sciences , vol.13 , Issue.4 , pp. 570-584
    • Biggs, J.1    Campion, W.2
  • 8
    • 0022693736 scopus 로고
    • A comparison of strategies to dampen nervousness in MRP systems
    • Blackburn J., Kropp D., and Millen R. A comparison of strategies to dampen nervousness in MRP systems. Management Science 32 4 (1986) 413-429
    • (1986) Management Science , vol.32 , Issue.4 , pp. 413-429
    • Blackburn, J.1    Kropp, D.2    Millen, R.3
  • 9
    • 33646355998 scopus 로고    scopus 로고
    • Replanishment planning in discrete-time, capacitated, non-stationary, stochastic inventory systems
    • Bollapragada R., and Rao U. Replanishment planning in discrete-time, capacitated, non-stationary, stochastic inventory systems. IIE Transactions 38 (2006) 583-595
    • (2006) IIE Transactions , vol.38 , pp. 583-595
    • Bollapragada, R.1    Rao, U.2
  • 11
    • 0029733439 scopus 로고    scopus 로고
    • Combined demand and lead time uncertainty with back-ordering in a multi-level product structure environment
    • Brennan L., and Gupta S. Combined demand and lead time uncertainty with back-ordering in a multi-level product structure environment. Production Planning and Control 7 1 (1996) 57-67
    • (1996) Production Planning and Control , vol.7 , Issue.1 , pp. 57-67
    • Brennan, L.1    Gupta, S.2
  • 12
    • 0034508235 scopus 로고    scopus 로고
    • Continuous review inventory models where random lead time depends on lot size and reserved capacity
    • Çakanyildirim M., Bookbinder J., and Gerchak Y. Continuous review inventory models where random lead time depends on lot size and reserved capacity. International Journal of Production Economics 68 3 (2000) 217-228
    • (2000) International Journal of Production Economics , vol.68 , Issue.3 , pp. 217-228
    • Çakanyildirim, M.1    Bookbinder, J.2    Gerchak, Y.3
  • 13
    • 36349022526 scopus 로고    scopus 로고
    • Chauhan, S., Dolgui, A., & Proth, J. -M. (2003). A model for ordering policy in an assembly system under lead time uncertainty. Research Report 4802, INRIA.
  • 14
    • 29344452896 scopus 로고    scopus 로고
    • Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times
    • Chen C.-T., and Huang S.-F. Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times. International Journal of Production Economics 101 (2006) 185-193
    • (2006) International Journal of Production Economics , vol.101 , pp. 185-193
    • Chen, C.-T.1    Huang, S.-F.2
  • 15
    • 84989457223 scopus 로고
    • Cost increases due to demand uncertainty in MRP lot sizing
    • De Bodt M., and Van Wassenhove L. Cost increases due to demand uncertainty in MRP lot sizing. Decision Science 14 (1983) 345-362
    • (1983) Decision Science , vol.14 , pp. 345-362
    • De Bodt, M.1    Van Wassenhove, L.2
  • 17
    • 0002063626 scopus 로고
    • An economic lot sizing technique: The part period balancing algorithm
    • De Matteis J., and Mendoza A. An economic lot sizing technique: The part period balancing algorithm. IBM Systems Journal 7 1 (1968) 30-46
    • (1968) IBM Systems Journal , vol.7 , Issue.1 , pp. 30-46
    • De Matteis, J.1    Mendoza, A.2
  • 18
    • 10444235124 scopus 로고    scopus 로고
    • An alternative to safety stock policies for multi-level rolling schedule MRP problems
    • Dellaert N., and Jeunet J. An alternative to safety stock policies for multi-level rolling schedule MRP problems. European Journal of Operational Research 163 (2005) 751-768
    • (2005) European Journal of Operational Research , vol.163 , pp. 751-768
    • Dellaert, N.1    Jeunet, J.2
  • 19
    • 84904240064 scopus 로고    scopus 로고
    • On a model of joint control of reserves in automatic control systems of production
    • Dolgui A. On a model of joint control of reserves in automatic control systems of production. Automation and Remote Control 62 12 (2001) 2020-2026
    • (2001) Automation and Remote Control , vol.62 , Issue.12 , pp. 2020-2026
    • Dolgui, A.1
  • 24
    • 0006029721 scopus 로고
    • Planification de systèmes d'assemblage avec approvisionnement aléatoire en composants
    • Dolgui A., Portmann M., and Proth J. Planification de systèmes d'assemblage avec approvisionnement aléatoire en composants. Journal of Decision Systems 4 4 (1995) 255-279
    • (1995) Journal of Decision Systems , vol.4 , Issue.4 , pp. 255-279
    • Dolgui, A.1    Portmann, M.2    Proth, J.3
  • 25
    • 36348980904 scopus 로고    scopus 로고
    • Fildes, R. & Kingsman, B. (1997). Demand uncertainty in MRP systems: The value of forecasting. Working Paper 01/97, Department of Management Science, Lancaster University.
  • 26
    • 26944447779 scopus 로고    scopus 로고
    • An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead time
    • Fujiwara O., and Sedarage D. An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead time. European Journal of Operational Research 100 (1997) 550-556
    • (1997) European Journal of Operational Research , vol.100 , pp. 550-556
    • Fujiwara, O.1    Sedarage, D.2
  • 27
    • 36349018710 scopus 로고    scopus 로고
    • Giard, V. (1981). Gestion de la Production. Paris: Economica.
  • 28
    • 0005782443 scopus 로고    scopus 로고
    • A simulation study for MRP system under uncertainty operating environment
    • Gomaa A., Hussien S., and Zahran M. A simulation study for MRP system under uncertainty operating environment. Journal of Engineering and Applied Science 46 2 (1999) 237-256
    • (1999) Journal of Engineering and Applied Science , vol.46 , Issue.2 , pp. 237-256
    • Gomaa, A.1    Hussien, S.2    Zahran, M.3
  • 30
    • 0021427334 scopus 로고
    • Simulation-based experimental investigation of supply/timing uncertainty in MRP systems
    • Grasso E., and Taylor B. Simulation-based experimental investigation of supply/timing uncertainty in MRP systems. International Journal of Production Research 22 3 (1984) 485-497
    • (1984) International Journal of Production Research , vol.22 , Issue.3 , pp. 485-497
    • Grasso, E.1    Taylor, B.2
  • 31
    • 0032157764 scopus 로고    scopus 로고
    • A net present value approach to safety stocks in planned production.
    • Grubbström R. A net present value approach to safety stocks in planned production. International Journal of Production Economics 56-57 (1998) 213-229
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 213-229
    • Grubbström, R.1
  • 33
    • 0032671584 scopus 로고    scopus 로고
    • Further developments on safety stocks in a MRP system applying Laplace transforms and input-output analysis.
    • Grubbström R., and Tang O. Further developments on safety stocks in a MRP system applying Laplace transforms and input-output analysis. International Journal of Production Economics 60-61 (1999) 381-387
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 381-387
    • Grubbström, R.1    Tang, O.2
  • 34
    • 0037431672 scopus 로고    scopus 로고
    • A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems.
    • Grubbström R., and Wang Z. A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems. International Journal of Production Economics 81-82 (2003) 483-494
    • (2003) International Journal of Production Economics , vol.81-82 , pp. 483-494
    • Grubbström, R.1    Wang, Z.2
  • 35
    • 36349029582 scopus 로고    scopus 로고
    • Gudum, C., & Kok, T. (2002). A safety stock adjustment procedure to enable target service levels in simulation of generic inventory systems. Preprint 1, Department of Management Science and Statistics, Copenhagen Business School.
  • 36
    • 0028419454 scopus 로고
    • Lead time uncertainty with back-ordering in multi-level product structures
    • Gupta S., and Brennan L. Lead time uncertainty with back-ordering in multi-level product structures. Computers Industrial Engineering 26 2 (1994) 267-278
    • (1994) Computers Industrial Engineering , vol.26 , Issue.2 , pp. 267-278
    • Gupta, S.1    Brennan, L.2
  • 37
    • 0000757562 scopus 로고
    • MRP systems under supply and process uncertainty in an integrated shop floor control environment
    • Gupta S., and Brennan L. MRP systems under supply and process uncertainty in an integrated shop floor control environment. International Journal of Production Research 33 1 (1995) 205-220
    • (1995) International Journal of Production Research , vol.33 , Issue.1 , pp. 205-220
    • Gupta, S.1    Brennan, L.2
  • 38
    • 33750008370 scopus 로고    scopus 로고
    • Coordination in decentralized assembly systems with uncertain component yields
    • Gurnani H., and Gerchak Y. Coordination in decentralized assembly systems with uncertain component yields. European Journal of Operational Research 176 3 (2007) 1559-1576
    • (2007) European Journal of Operational Research , vol.176 , Issue.3 , pp. 1559-1576
    • Gurnani, H.1    Gerchak, Y.2
  • 40
    • 0035889175 scopus 로고    scopus 로고
    • Setting procurement safety lead-times for assembly systems
    • Hegedus M., and Hopp W. Setting procurement safety lead-times for assembly systems. International Journal of Production Research 39 15 (2001) 3459-3478
    • (2001) International Journal of Production Research , vol.39 , Issue.15 , pp. 3459-3478
    • Hegedus, M.1    Hopp, W.2
  • 41
    • 0032143246 scopus 로고    scopus 로고
    • Correlating MRP system nervousness with forecast errors
    • Ho C., and Ireland T. Correlating MRP system nervousness with forecast errors. International Journal of Production Research 36 8 (1998) 2285-2299
    • (1998) International Journal of Production Research , vol.36 , Issue.8 , pp. 2285-2299
    • Ho, C.1    Ireland, T.2
  • 42
    • 0028429305 scopus 로고
    • Evaluating the impact of lead time uncertainty in material requirements planning systems
    • Ho C., and Lau H. Evaluating the impact of lead time uncertainty in material requirements planning systems. European Journal of Operational Research 75 (1994) 89-99
    • (1994) European Journal of Operational Research , vol.75 , pp. 89-99
    • Ho, C.1    Lau, H.2
  • 43
    • 0033908090 scopus 로고    scopus 로고
    • Measuring the performance of lot-sizing techniques in uncertain environments
    • Jeunet J., and Jonard N. Measuring the performance of lot-sizing techniques in uncertain environments. International Journal of Production Economics 64 (2000) 197-208
    • (2000) International Journal of Production Economics , vol.64 , pp. 197-208
    • Jeunet, J.1    Jonard, N.2
  • 44
    • 0034333693 scopus 로고    scopus 로고
    • New lot-sizing formulations for less nervous production schedules
    • Kazan O., Nagi R., and Rump C. New lot-sizing formulations for less nervous production schedules. Computers & Operations Research 27 (2000) 1325-1345
    • (2000) Computers & Operations Research , vol.27 , pp. 1325-1345
    • Kazan, O.1    Nagi, R.2    Rump, C.3
  • 46
    • 0037323569 scopus 로고    scopus 로고
    • MRP-controlled manufacturing environment disturbed by uncertainty
    • Koh S., and Saad S. MRP-controlled manufacturing environment disturbed by uncertainty. Robotics and Computer-Integrated Manufacturing 19 1-2 (2003) 157-171
    • (2003) Robotics and Computer-Integrated Manufacturing , vol.19 , Issue.1-2 , pp. 157-171
    • Koh, S.1    Saad, S.2
  • 47
    • 29344471605 scopus 로고    scopus 로고
    • Managing uncertainty in ERP-controlled manufacturing environments in SMEs
    • Koh S., and Saad S. Managing uncertainty in ERP-controlled manufacturing environments in SMEs. International Journal of Production Economics 101 (2006) 109-127
    • (2006) International Journal of Production Economics , vol.101 , pp. 109-127
    • Koh, S.1    Saad, S.2
  • 48
    • 0037054916 scopus 로고    scopus 로고
    • Uncertainty under MRP-planned manufacture: Review and categorization
    • Koh S., Saad S., and Jones M. Uncertainty under MRP-planned manufacture: Review and categorization. International Journal of Production Research 40 10 (2002) 2399-2421
    • (2002) International Journal of Production Research , vol.40 , Issue.10 , pp. 2399-2421
    • Koh, S.1    Saad, S.2    Jones, M.3
  • 49
    • 3142571389 scopus 로고    scopus 로고
    • Development and implementation of a generic order release scheme for modelling MRP-controlled finite-capacitated manufacturing environment
    • Koh S., Saad S., and Padmore J. Development and implementation of a generic order release scheme for modelling MRP-controlled finite-capacitated manufacturing environment. International Journal of Computer Integrated Manufacturing 17 6 (2004) 561-576
    • (2004) International Journal of Computer Integrated Manufacturing , vol.17 , Issue.6 , pp. 561-576
    • Koh, S.1    Saad, S.2    Padmore, J.3
  • 51
    • 0012591073 scopus 로고
    • A comparative study of lot-sizing procedures for multi-stage assembly systems
    • Lambrecht M., Vander Eecken J., and Vanderveken H. A comparative study of lot-sizing procedures for multi-stage assembly systems. OR Spektrum 5 (1983) 33-43
    • (1983) OR Spektrum , vol.5 , pp. 33-43
    • Lambrecht, M.1    Vander Eecken, J.2    Vanderveken, H.3
  • 53
    • 0000602739 scopus 로고
    • Forecasting error evaluation in material requirements planning (MRP) production inventory systems
    • Lee T., and Adam J. Forecasting error evaluation in material requirements planning (MRP) production inventory systems. Management Science 32 (1986) 1186-1205
    • (1986) Management Science , vol.32 , pp. 1186-1205
    • Lee, T.1    Adam, J.2
  • 54
    • 84985848296 scopus 로고
    • A model for master production scheduling in uncertain environments
    • Lin N., and Krajewski L. A model for master production scheduling in uncertain environments. Decision Sciences 23 (1992) 839-861
    • (1992) Decision Sciences , vol.23 , pp. 839-861
    • Lin, N.1    Krajewski, L.2
  • 55
    • 0037146389 scopus 로고    scopus 로고
    • Generalized newsboy model to compute the optimal planned lead times in assembly systems
    • Louly M.-A., and Dolgui A. Generalized newsboy model to compute the optimal planned lead times in assembly systems. International Journal of Production Research 40 17 (2002) 4401-4414
    • (2002) International Journal of Production Research , vol.40 , Issue.17 , pp. 4401-4414
    • Louly, M.-A.1    Dolgui, A.2
  • 57
    • 85088357462 scopus 로고    scopus 로고
    • A polynomial algorithm for the MPS parameterization under uncertainties
    • Camacho, Basanez, and De La Puente (Eds), Elsevier Science
    • Louly M.-A., and Dolgui A. A polynomial algorithm for the MPS parameterization under uncertainties. In: Camacho, Basanez, and De La Puente (Eds). Proceedings of the 15th IFAC World Congress, Volume A manufacturing systems (2003), Elsevier Science
    • (2003) Proceedings of the 15th IFAC World Congress, Volume A manufacturing systems
    • Louly, M.-A.1    Dolgui, A.2
  • 59
    • 0022027650 scopus 로고
    • Protective scheduling smoothes jittery MRP plans: Buffer forecast error the key
    • Lowerre W.M. Protective scheduling smoothes jittery MRP plans: Buffer forecast error the key. Production and Inventory Management Journal 1 (1985) 1-21
    • (1985) Production and Inventory Management Journal , vol.1 , pp. 1-21
    • Lowerre, W.M.1
  • 60
    • 0031219775 scopus 로고    scopus 로고
    • Supply chain partnerships: Opportunities for operations research
    • Maloni M., and Benton W. Supply chain partnerships: Opportunities for operations research. European Journal of Operational Research 101 (1997) 419-429
    • (1997) European Journal of Operational Research , vol.101 , pp. 419-429
    • Maloni, M.1    Benton, W.2
  • 61
    • 0042264075 scopus 로고    scopus 로고
    • Dynamic lot-sizing with price changes and price-dependent holding costs
    • Martel A., and Gascon A. Dynamic lot-sizing with price changes and price-dependent holding costs. European Journal of Operational Research 111 (1998) 114-128
    • (1998) European Journal of Operational Research , vol.111 , pp. 114-128
    • Martel, A.1    Gascon, A.2
  • 63
    • 0031123532 scopus 로고    scopus 로고
    • Joint optimization of lot-sizes, safety stocks and safety lead times in a MRP system
    • Molinder A. Joint optimization of lot-sizes, safety stocks and safety lead times in a MRP system. International Journal of Production Research 35 4 (1997) 983-994
    • (1997) International Journal of Production Research , vol.35 , Issue.4 , pp. 983-994
    • Molinder, A.1
  • 64
    • 0942290242 scopus 로고    scopus 로고
    • Manufacturing enterprise control and management system engineering: paradigms and open issues
    • Morel G., Panetto H., Zaremba M., and Mayer F. Manufacturing enterprise control and management system engineering: paradigms and open issues. Annuals Reviews in Control 27 (2003) 199-209
    • (2003) Annuals Reviews in Control , vol.27 , pp. 199-209
    • Morel, G.1    Panetto, H.2    Zaremba, M.3    Mayer, F.4
  • 65
    • 27344448554 scopus 로고    scopus 로고
    • MRP with flexible constraints: A fuzzy mathematical programming approach
    • Mula J., Poler R., and Garcia J. MRP with flexible constraints: A fuzzy mathematical programming approach. Fuzzy sets and systems 157 (2006) 74-97
    • (2006) Fuzzy sets and systems , vol.157 , pp. 74-97
    • Mula, J.1    Poler, R.2    Garcia, J.3
  • 67
    • 36349028495 scopus 로고    scopus 로고
    • Nahmias, S. (1997). Production and operations analysis. Irwin.
  • 68
    • 0029342043 scopus 로고
    • Analysis of a (Q,R,T) inventory policy with deterministic and random yields when future supply is uncertain
    • Parlar M., and Perry D. Analysis of a (Q,R,T) inventory policy with deterministic and random yields when future supply is uncertain. European Journal of Operational Research 84 (1995) 431-443
    • (1995) European Journal of Operational Research , vol.84 , pp. 431-443
    • Parlar, M.1    Perry, D.2
  • 70
    • 0033355582 scopus 로고    scopus 로고
    • Focusing material requirements planning (MRP) towards performance
    • Plenert G. Focusing material requirements planning (MRP) towards performance. European Journal of Operational Research 119 (1999) 91-99
    • (1999) European Journal of Operational Research , vol.119 , pp. 91-99
    • Plenert, G.1
  • 71
    • 36348964652 scopus 로고    scopus 로고
    • Prodhon, C. (2003). Plannification des approvisionnements en environnement incertain. Master of sciences thesis, University of Technology of Troyes.
  • 72
    • 0002657699 scopus 로고
    • A heuristic for selecting lot-sizing quantities for the case of deterministic time-varying demand rates and discrete opportunities for replenishment
    • Silver E., and Meal H. A heuristic for selecting lot-sizing quantities for the case of deterministic time-varying demand rates and discrete opportunities for replenishment. Production and Inventory Management 14 (1973) 64-74
    • (1973) Production and Inventory Management , vol.14 , pp. 64-74
    • Silver, E.1    Meal, H.2
  • 73
    • 0033116507 scopus 로고    scopus 로고
    • Multiple level production planning in rolling horizon assembly environments
    • Simpson N. Multiple level production planning in rolling horizon assembly environments. European Journal of Operational Research 114 (1999) 15-28
    • (1999) European Journal of Operational Research , vol.114 , pp. 15-28
    • Simpson, N.1
  • 74
    • 84985759548 scopus 로고
    • Freezing the master production schedule under demand uncertainty
    • Sridharan V., and Berry W. Freezing the master production schedule under demand uncertainty. Decision Science 21 (1990) 97-120
    • (1990) Decision Science , vol.21 , pp. 97-120
    • Sridharan, V.1    Berry, W.2
  • 75
    • 0028434143 scopus 로고
    • A model to estimate service levels when a portion of the master production schedule is frozen
    • Sridharan V., and Laforge R. A model to estimate service levels when a portion of the master production schedule is frozen. Computers & Operations Research 21 5 (1994) 477-486
    • (1994) Computers & Operations Research , vol.21 , Issue.5 , pp. 477-486
    • Sridharan, V.1    Laforge, R.2
  • 76
    • 0037063281 scopus 로고    scopus 로고
    • Planning and replanning the master production schedule under demand uncertainty
    • Tang O., and Grubbström R. Planning and replanning the master production schedule under demand uncertainty. International journal of production economics 78 (2002) 323-334
    • (2002) International journal of production economics , vol.78 , pp. 323-334
    • Tang, O.1    Grubbström, R.2
  • 79
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner H., and Whitin T. Dynamic version of the economic lot size model. Management Science 5 (1958) 89-96
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.1    Whitin, T.2
  • 80
    • 0026871547 scopus 로고
    • Optimal ordering policies when anticipating a disruption in supply or demand
    • Weiss H., and Rosenthal E. Optimal ordering policies when anticipating a disruption in supply or demand. European Journal of Operational Research 59 (1992) 370-382
    • (1992) European Journal of Operational Research , vol.59 , pp. 370-382
    • Weiss, H.1    Rosenthal, E.2
  • 81
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark D.C., and Williams J. Material requirements planning under uncertainty. Decision Science 7 (1976) 595-606
    • (1976) Decision Science , vol.7 , pp. 595-606
    • Whybark, D.C.1    Williams, J.2
  • 82
    • 0022236783 scopus 로고
    • An analysis of scheduling policies in multi-echelon production systems
    • Yano C., and Carlson R. An analysis of scheduling policies in multi-echelon production systems. IIE Transactions 17 4 (1985) 370-377
    • (1985) IIE Transactions , vol.17 , Issue.4 , pp. 370-377
    • Yano, C.1    Carlson, R.2
  • 83
    • 0032000895 scopus 로고    scopus 로고
    • Parameters affecting the effectiveness of MRP systems: a review
    • Yeung J., Wong W., and Ma L. Parameters affecting the effectiveness of MRP systems: a review. International Journal of Production Research 36 2 (1998) 313-331
    • (1998) International Journal of Production Research , vol.36 , Issue.2 , pp. 313-331
    • Yeung, J.1    Wong, W.2    Ma, L.3
  • 85
    • 0031553213 scopus 로고    scopus 로고
    • Lot-sizing rules and freezing the master production schedule in material requirements planning systems
    • Zhao X., and Lam K. Lot-sizing rules and freezing the master production schedule in material requirements planning systems. International Journal of Production Economics 53 (1997) 281-305
    • (1997) International Journal of Production Economics , vol.53 , pp. 281-305
    • Zhao, X.1    Lam, K.2
  • 86
    • 0027612429 scopus 로고
    • Freezing the master production schedule for material requirements planning systems under demand uncertainty
    • Zhao X., and Lee T. Freezing the master production schedule for material requirements planning systems under demand uncertainty. Journal of Operations Management 11 (1993) 185-205
    • (1993) Journal of Operations Management , vol.11 , pp. 185-205
    • Zhao, X.1    Lee, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.