-
1
-
-
0029288586
-
Multiple failures in a multi-item spares inventory model
-
Cheung, K. L. and Hausman, W. H., 1995, Multiple failures in a multi-item spares inventory model. IIE Transactions, 27, 171-180.
-
(1995)
IIE Transactions
, vol.27
, pp. 171-180
-
-
Cheung, K.L.1
Hausman, W.H.2
-
4
-
-
0021427334
-
A simulation-based experimental investigation of supply/timing uncertainty in MRP systems
-
Grasso, E. T. and Taylor, B. W., 1984, A simulation-based experimental investigation of supply/timing uncertainty in MRP systems International Journal of Production Research, 22, 485-497.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 485-497
-
-
Grasso, E.T.1
Taylor, B.W.2
-
6
-
-
0035307357
-
Due date setting with supply constraints in systems using MRP
-
Hegedus, M. G. and Hopp, W. J., 2001, Due date setting with supply constraints in systems using MRP. Computers and Industrial Engineering, 39, 293-305.
-
(2001)
Computers and Industrial Engineering
, vol.39
, pp. 293-305
-
-
Hegedus, M.G.1
Hopp, W.J.2
-
7
-
-
0027562596
-
Setting safety leadtimes for purchased components in assembly systems
-
Hopp, W. J. and Spearman, M. L., 1993, Setting safety leadtimes for purchased components in assembly systems. IIE Transactions, 25, 2-11.
-
(1993)
IIE Transactions
, vol.25
, pp. 2-11
-
-
Hopp, W.J.1
Spearman, M.L.2
-
8
-
-
77950506731
-
Manufacturing lead-times, order release and capacity loading
-
In S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds); (Amsterdasm: North-Holland)
-
Karmarkar, U. S., 1993, Manufacturing lead-times, order release and capacity loading. In S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds), Handbooks in Operations Research and Management Science, Vol. 4: Logistics of Production and Inventory (Amsterdasm: North-Holland), pp. 287-341.
-
(1993)
Handbooks in Operations Research and Management Science, Vol. 4: Logistics of Production and Inventory
, pp. 287-341
-
-
Karmarkar, U.S.1
-
10
-
-
0024701994
-
Optimal inventory policies for assembly systems under random demands
-
Rosling, K., 1989, Optimal inventory policies for assembly systems under random demands. Operations Research, 37, pp. 565-579.
-
(1989)
Operations Research
, vol.37
, pp. 565-579
-
-
Rosling, K.1
-
11
-
-
0022131173
-
Optimal policy for a two-stage assembly system under random demand
-
Schmidt, C. P. and Nahmias, S., 1985, Optimal policy for a two-stage assembly system under random demand. Operations Research, 33, 1130-1145.
-
(1985)
Operations Research
, vol.33
, pp. 1130-1145
-
-
Schmidt, C.P.1
Nahmias, S.2
-
12
-
-
0030260009
-
Inventory control with information about supply conditions
-
Song, J. S. and Zipkin, P. H., 1996, Inventory control with information about supply conditions. Management Science, 42, 1409-1419.
-
(1996)
Management Science
, vol.42
, pp. 1409-1419
-
-
Song, J.S.1
Zipkin, P.H.2
-
13
-
-
0002779268
-
Order-fulfillment performance measures in assemble-to-order-system with stochastic leadtimes
-
Song, J. S., Xu, S. H. and Liu, B., 1999, Order-fulfillment performance measures in assemble-to-order-system with stochastic leadtimes. Operations Research, 47, 131-149.
-
(1999)
Operations Research
, vol.47
, pp. 131-149
-
-
Song, J.S.1
Xu, S.H.2
Liu, B.3
-
14
-
-
0004134551
-
Procurement of common components in a stochastic environment
-
Research Report, IBM Watson Research Center, Yorktown Heights, NY
-
Srinivasan, R., Jayaraman, R., Roundy, R. and Tayur, S., 1992, Procurement of common components in a stochastic environment. Research Report, IBM Watson Research Center, Yorktown Heights, NY.
-
(1992)
-
-
Srinivasan, R.1
Jayaraman, R.2
Roundy, R.3
Tayur, S.4
-
16
-
-
84989412809
-
Material requirements planning under uncertainty
-
Whybark, D. C. and Williams, J. G., 1976, Material requirements planning under uncertainty. Decision Sciences, 7, 595-606.
-
(1976)
Decision Sciences
, vol.7
, pp. 595-606
-
-
Whybark, D.C.1
Williams, J.G.2
-
17
-
-
0023207074
-
Setting planned leadtimes in serial production systems with tardiness costs
-
Yano, C. A., 1987, Setting planned leadtimes in serial production systems with tardiness costs. Management Science, 33, 1313-1326.
-
(1987)
Management Science
, vol.33
, pp. 1313-1326
-
-
Yano, C.A.1
-
18
-
-
0023558979
-
Stochastic leadtimes in two-level assembly systems
-
Yano, C. A., 1987, Stochastic leadtimes in two-level assembly systems. IIE Transactions, 19, 371-378.
-
(1987)
IIE Transactions
, vol.19
, pp. 371-378
-
-
Yano, C.A.1
-
19
-
-
0000301836
-
Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands
-
Zhang, A. X., 1997, Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands. Production and Operations Management, 6, 309-324.
-
(1997)
Production and Operations Management
, vol.6
, pp. 309-324
-
-
Zhang, A.X.1
|