메뉴 건너뛰기




Volumn 39, Issue 15, 2001, Pages 3459-3478

Setting procurement safety lead-times for assembly systems

Author keywords

[No Author keywords available]

Indexed keywords

COMBINATORIAL MATHEMATICS; ELECTRONIC EQUIPMENT MANUFACTURE; MATHEMATICAL MODELS; OPTIMIZATION; PLANNING; RANDOM PROCESSES; RESOURCE ALLOCATION; TIME AND MOTION STUDY;

EID: 0035889175     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540110061625     Document Type: Article
Times cited : (20)

References (19)
  • 1
    • 0029288586 scopus 로고
    • Multiple failures in a multi-item spares inventory model
    • Cheung, K. L. and Hausman, W. H., 1995, Multiple failures in a multi-item spares inventory model. IIE Transactions, 27, 171-180.
    • (1995) IIE Transactions , vol.27 , pp. 171-180
    • Cheung, K.L.1    Hausman, W.H.2
  • 4
    • 0021427334 scopus 로고
    • A simulation-based experimental investigation of supply/timing uncertainty in MRP systems
    • Grasso, E. T. and Taylor, B. W., 1984, A simulation-based experimental investigation of supply/timing uncertainty in MRP systems International Journal of Production Research, 22, 485-497.
    • (1984) International Journal of Production Research , vol.22 , pp. 485-497
    • Grasso, E.T.1    Taylor, B.W.2
  • 6
    • 0035307357 scopus 로고    scopus 로고
    • Due date setting with supply constraints in systems using MRP
    • Hegedus, M. G. and Hopp, W. J., 2001, Due date setting with supply constraints in systems using MRP. Computers and Industrial Engineering, 39, 293-305.
    • (2001) Computers and Industrial Engineering , vol.39 , pp. 293-305
    • Hegedus, M.G.1    Hopp, W.J.2
  • 7
    • 0027562596 scopus 로고
    • Setting safety leadtimes for purchased components in assembly systems
    • Hopp, W. J. and Spearman, M. L., 1993, Setting safety leadtimes for purchased components in assembly systems. IIE Transactions, 25, 2-11.
    • (1993) IIE Transactions , vol.25 , pp. 2-11
    • Hopp, W.J.1    Spearman, M.L.2
  • 8
    • 77950506731 scopus 로고
    • Manufacturing lead-times, order release and capacity loading
    • In S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds); (Amsterdasm: North-Holland)
    • Karmarkar, U. S., 1993, Manufacturing lead-times, order release and capacity loading. In S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds), Handbooks in Operations Research and Management Science, Vol. 4: Logistics of Production and Inventory (Amsterdasm: North-Holland), pp. 287-341.
    • (1993) Handbooks in Operations Research and Management Science, Vol. 4: Logistics of Production and Inventory , pp. 287-341
    • Karmarkar, U.S.1
  • 10
    • 0024701994 scopus 로고
    • Optimal inventory policies for assembly systems under random demands
    • Rosling, K., 1989, Optimal inventory policies for assembly systems under random demands. Operations Research, 37, pp. 565-579.
    • (1989) Operations Research , vol.37 , pp. 565-579
    • Rosling, K.1
  • 11
    • 0022131173 scopus 로고
    • Optimal policy for a two-stage assembly system under random demand
    • Schmidt, C. P. and Nahmias, S., 1985, Optimal policy for a two-stage assembly system under random demand. Operations Research, 33, 1130-1145.
    • (1985) Operations Research , vol.33 , pp. 1130-1145
    • Schmidt, C.P.1    Nahmias, S.2
  • 12
    • 0030260009 scopus 로고    scopus 로고
    • Inventory control with information about supply conditions
    • Song, J. S. and Zipkin, P. H., 1996, Inventory control with information about supply conditions. Management Science, 42, 1409-1419.
    • (1996) Management Science , vol.42 , pp. 1409-1419
    • Song, J.S.1    Zipkin, P.H.2
  • 13
    • 0002779268 scopus 로고    scopus 로고
    • Order-fulfillment performance measures in assemble-to-order-system with stochastic leadtimes
    • Song, J. S., Xu, S. H. and Liu, B., 1999, Order-fulfillment performance measures in assemble-to-order-system with stochastic leadtimes. Operations Research, 47, 131-149.
    • (1999) Operations Research , vol.47 , pp. 131-149
    • Song, J.S.1    Xu, S.H.2    Liu, B.3
  • 14
    • 0004134551 scopus 로고
    • Procurement of common components in a stochastic environment
    • Research Report, IBM Watson Research Center, Yorktown Heights, NY
    • Srinivasan, R., Jayaraman, R., Roundy, R. and Tayur, S., 1992, Procurement of common components in a stochastic environment. Research Report, IBM Watson Research Center, Yorktown Heights, NY.
    • (1992)
    • Srinivasan, R.1    Jayaraman, R.2    Roundy, R.3    Tayur, S.4
  • 16
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark, D. C. and Williams, J. G., 1976, Material requirements planning under uncertainty. Decision Sciences, 7, 595-606.
    • (1976) Decision Sciences , vol.7 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2
  • 17
    • 0023207074 scopus 로고
    • Setting planned leadtimes in serial production systems with tardiness costs
    • Yano, C. A., 1987, Setting planned leadtimes in serial production systems with tardiness costs. Management Science, 33, 1313-1326.
    • (1987) Management Science , vol.33 , pp. 1313-1326
    • Yano, C.A.1
  • 18
    • 0023558979 scopus 로고
    • Stochastic leadtimes in two-level assembly systems
    • Yano, C. A., 1987, Stochastic leadtimes in two-level assembly systems. IIE Transactions, 19, 371-378.
    • (1987) IIE Transactions , vol.19 , pp. 371-378
    • Yano, C.A.1
  • 19
    • 0000301836 scopus 로고    scopus 로고
    • Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands
    • Zhang, A. X., 1997, Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands. Production and Operations Management, 6, 309-324.
    • (1997) Production and Operations Management , vol.6 , pp. 309-324
    • Zhang, A.X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.