-
1
-
-
7944235022
-
Research on generation of assembly sequences based on decomposition of graph
-
Bai, F., Li, L. and Wei, S., Research on generation of assembly sequences based on decomposition of graph. Mech. Sci. Technol., 2000, 19(6), 1035-1037.
-
(2000)
Mech. Sci. Technol
, vol.19
, Issue.6
, pp. 1035-1037
-
-
Bai, F.1
Li, L.2
Wei, S.3
-
2
-
-
0031077784
-
A structure-oriented approach to assembly sequence planning
-
Chakrabarty, S. and Wolter, J., A structure-oriented approach to assembly sequence planning. IEEE Trans. Rob. Automat., 1997, 13(1), 14-29.
-
(1997)
IEEE Trans. Rob. Automat
, vol.13
, Issue.1
, pp. 14-29
-
-
Chakrabarty, S.1
Wolter, J.2
-
3
-
-
0035283629
-
Analysis of assembly through product configuration
-
Chao, P. Y. and Chen, T. T., Analysis of assembly through product configuration. Computers Industry, 2001, 44, 189-203.
-
(2001)
Computers Industry
, vol.44
, pp. 189-203
-
-
Chao, P.Y.1
Chen, T.T.2
-
4
-
-
50849151631
-
Control problems of grey systems
-
Deng, J., Control problems of grey systems. Syst. Contr. Lett., 1982, 1(5), 288-294.
-
(1982)
Syst. Contr. Lett
, vol.1
, Issue.5
, pp. 288-294
-
-
Deng, J.1
-
5
-
-
0035241026
-
A disassembly planning software system for the optimasation of recycling processes
-
Dini, G., Failli, F. and Santochi, W., A disassembly planning software system for the optimasation of recycling processes. Product. Plan. Contr., 2001, 12(1), 2-12.
-
(2001)
Product. Plan. Contr
, vol.12
, Issue.1
, pp. 2-12
-
-
Dini, G.1
Failli, F.2
Santochi, W.3
-
6
-
-
0038690164
-
Disassembly AND/OR graph model for disassembly for recycling
-
Gao, J., Xiang, D. and Chen, H., Disassembly AND/OR graph model for disassembly for recycling, in Proceedings of the IEEE International Symposium on Electronics and the Environment, 2003a, pp. 54-59.
-
(2003)
Proceedings of the IEEE International Symposium on Electronics and the Environment
, pp. 54-59
-
-
Gao, J.1
Xiang, D.2
Chen, H.3
-
7
-
-
0345116186
-
Connectivity sieve in disassembly AND/OR graph
-
Gao, J., Xiang, D. and Chen, H., Connectivity sieve in disassembly AND/OR graph, J. Tsinghua Univ. (Sci. Technol.), 2003b, 43(8), 1045-1048.
-
(2003)
J. Tsinghua Univ. (Sci. Technol.)
, vol.43
, Issue.8
, pp. 1045-1048
-
-
Gao, J.1
Xiang, D.2
Chen, H.3
-
8
-
-
0037309903
-
On generation of all possible disassembly sequences of mechanical or electronic equipment
-
Gao, J., Duan, G. and Wang, J., On generation of all possible disassembly sequences of mechanical or electronic equipment. Machine Des. Res., 2003c, 19(1), 11-13.
-
(2003)
Machine Des. Res
, vol.19
, Issue.1
, pp. 11-13
-
-
Gao, J.1
Duan, G.2
Wang, J.3
-
9
-
-
34547255943
-
A new method for construction of connectivity sieve of disassembly AND/OR graph
-
Gao, J., Xiang, D. and Chen, H., A new method for construction of connectivity sieve of disassembly AND/OR graph. Mech. Sci. Technol., 2004, 23(2), 143-146.
-
(2004)
Mech. Sci. Technol
, vol.23
, Issue.2
, pp. 143-146
-
-
Gao, J.1
Xiang, D.2
Chen, H.3
-
10
-
-
0029404297
-
CAD-directed automatic assembly sequence planning
-
Gu, P. and Yan, W., CAD-directed automatic assembly sequence planning. Int. J. Product. Res., 1995, 33(11), 3069-3100.
-
(1995)
Int. J. Product. Res
, vol.33
, Issue.11
, pp. 3069-3100
-
-
Gu, P.1
Yan, W.2
-
11
-
-
0032183779
-
Disassembly sequence planning for products with defective parts in product recovery
-
Gungor, A. and Gupta, S.M., Disassembly sequence planning for products with defective parts in product recovery. Comput. Indust. Eng., 1998, 35(1-2), 161-164.
-
(1998)
Comput. Indust. Eng
, vol.35
, Issue.1-2
, pp. 161-164
-
-
Gungor, A.1
Gupta, S.M.2
-
12
-
-
36248963439
-
The system composition of design for disassembly
-
Jiang, D. and Liu, G., The system composition of design for disassembly. J. Hefei Univ. Technol., 1999, 22(4), 12-16.
-
(1999)
J. Hefei Univ. Technol
, vol.22
, Issue.4
, pp. 12-16
-
-
Jiang, D.1
Liu, G.2
-
13
-
-
84952519001
-
Planning product disassembly for material recovery opportunities
-
Johnson, M.R. and Wang, M.H., Planning product disassembly for material recovery opportunities. Int. J. Product. Res., 1995, 33(11), 3119-3142.
-
(1995)
Int. J. Product. Res
, vol.33
, Issue.11
, pp. 3119-3142
-
-
Johnson, M.R.1
Wang, M.H.2
-
14
-
-
0027836570
-
A key issue in product life cycle: Disassembly
-
Jovane, F., Alting, L. and Armillotta, A., A key issue in product life cycle: disassembly. Ann. CIRP, 1993, 42(2), 651-658.
-
(1993)
Ann. CIRP
, vol.42
, Issue.2
, pp. 651-658
-
-
Jovane, F.1
Alting, L.2
Armillotta, A.3
-
15
-
-
0033718996
-
A Method for sequencing the disassembly of product
-
Kaebernick, H., O'Shea, B. and Grewal, S.S., A Method for sequencing the disassembly of product. Ann. CIRP, 2000, 49(1), 13-16.
-
(2000)
Ann. CIRP
, vol.49
, Issue.1
, pp. 13-16
-
-
Kaebernick, H.1
O'Shea, B.2
Grewal, S.S.3
-
16
-
-
0034963174
-
Parallel disassembly sequencing with sequence-dependent operation times
-
Kang, J.G., Lee, D.H. and Xirouchakis, P., Parallel disassembly sequencing with sequence-dependent operation times. Ann. CIRP, 2001, 50(1), 343-346.
-
(2001)
Ann. CIRP
, vol.50
, Issue.1
, pp. 343-346
-
-
Kang, J.G.1
Lee, D.H.2
Xirouchakis, P.3
-
17
-
-
0033895012
-
Disassembly sequence and cost analysis for electromechanical products
-
Kuo, T.C., Disassembly sequence and cost analysis for electromechanical products. Rob. Comp. Integ. Manufact., 2000, 16(1), 43-54.
-
(2000)
Rob. Comp. Integ. Manufact
, vol.16
, Issue.1
, pp. 43-54
-
-
Kuo, T.C.1
-
18
-
-
0033358055
-
Linear programming in disassembly/clustering sequence generation
-
Lambert, A.J.D., Linear programming in disassembly/clustering sequence generation. Comput. Indust. Eng., 1999, 36(4), 723-738.
-
(1999)
Comput. Indust. Eng
, vol.36
, Issue.4
, pp. 723-738
-
-
Lambert, A.J.D.1
-
19
-
-
0038156629
-
Disassembly sequencing: A survey
-
Lambert, A.J.D., Disassembly sequencing: a survey. Int. J. Product. Res., 2003, 41(16), 3721-3759.
-
(2003)
Int. J. Product. Res
, vol.41
, Issue.16
, pp. 3721-3759
-
-
Lambert, A.J.D.1
-
20
-
-
0036430979
-
A novel representation scheme for disassembly sequence planning
-
Li, J.R., Khoo, L.P. and Tor, S.B., A novel representation scheme for disassembly sequence planning. Int. J. Adv. Manufact. Technol., 2002, 20(8), 621-630.
-
(2002)
Int. J. Adv. Manufact. Technol
, vol.20
, Issue.8
, pp. 621-630
-
-
Li, J.R.1
Khoo, L.P.2
Tor, S.B.3
-
21
-
-
0036076303
-
The quantification of the relating degree of parts based on the fuzzy synthesizing evaluation method
-
San Francisco
-
Liu, X., Liu, G. and Duan, G., The quantification of the relating degree of parts based on the fuzzy synthesizing evaluation method, in Proceedings of the 2002 IEEE International Symposium on Electronics and the Environment, San Francisco, 2002, pp. 74-78.
-
(2002)
Proceedings of the 2002 IEEE International Symposium on Electronics and the Environment
, pp. 74-78
-
-
Liu, X.1
Liu, G.2
Duan, G.3
-
22
-
-
0030658169
-
Dynamic generation of disassembly sequences
-
Martinez, M., Pham, V. and Favrel, J., Dynamic generation of disassembly sequences, in IEEE 6th International Conference on Emerging Technologies and Factory Automation Proceedings, 1997, pp. 177-182.
-
(1997)
IEEE 6th International Conference on Emerging Technologies and Factory Automation Proceedings
, pp. 177-182
-
-
Martinez, M.1
Pham, V.2
Favrel, J.3
-
23
-
-
0032046796
-
Automatic a priori, a posteriori or appropriate determination of subassemblies
-
Mascle, C., Automatic a priori, a posteriori or appropriate determination of subassemblies. Int. J. Product. Res., 1998, 36(4), 1001-1021.
-
(1998)
Int. J. Product. Res
, vol.36
, Issue.4
, pp. 1001-1021
-
-
Mascle, C.1
-
24
-
-
0035330499
-
Modeling automatic assembly and disassembly operations for virtual manufacturing
-
Mok, S.M., Wu, C. and Lee, D.T., Modeling automatic assembly and disassembly operations for virtual manufacturing. IEEE Trans. Syst. Man Cybernetics, 2001, 31(3), 223-232.
-
(2001)
IEEE Trans. Syst. Man Cybernetics
, vol.31
, Issue.3
, pp. 223-232
-
-
Mok, S.M.1
Wu, C.2
Lee, D.T.3
-
25
-
-
0032183016
-
A Petri net approach to disassembly process planning
-
Moore, K.E., Gungor, A. and Gupta, S.M., A Petri net approach to disassembly process planning. Comput. Indust. Eng., 1998a, 35(1-2), 165-168.
-
(1998)
Comput. Indust. Eng
, vol.35
, Issue.1-2
, pp. 165-168
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
26
-
-
0031703202
-
Disassembly process planning using Petri net
-
Moore, K.E., Gungor, A. and Gupta S.M., Disassembly process planning using Petri net, in Proceedings of the IEEE International Symposium on Electronics and the Environment, 1998b, pp. 88-93.
-
(1998)
Proceedings of the IEEE International Symposium on Electronics and the Environment
, pp. 88-93
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
27
-
-
0032267397
-
Disassembly Petri net generation in the process of XOR precedence relations
-
Moore, K.E., Gungor, A. and Gupta, S.M., Disassembly Petri net generation in the process of XOR precedence relations. IEEE International Conference on Systems, Man, and Cybernetics, 1998c, pp. 13-18.
-
(1998)
IEEE International Conference on Systems, Man, and Cybernetics
, pp. 13-18
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
28
-
-
0035546631
-
Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships
-
Moore, K.E., Gungor, A. and Gupta, S.M., Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships. Eur. J. Oper. Res., 2001, 135(2), 428-449.
-
(2001)
Eur. J. Oper. Res
, vol.135
, Issue.2
, pp. 428-449
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
29
-
-
36248950517
-
-
National Bureau of Statistics of China, Statistics Press of China: Beijing
-
National Bureau of Statistics of China, Chinese National Statistical Bulletin 2003, 2003 (Statistics Press of China: Beijing).
-
(2003)
Chinese National Statistical Bulletin 2003
-
-
-
30
-
-
0034263069
-
Using a cluster graph representation of products for application in the disassembly planning process
-
O'Shea, B., Kaebernick, H. and Grewal, S.S., Using a cluster graph representation of products for application in the disassembly planning process. Concurrent Eng., 2000, 8(3), 158-170.
-
(2000)
Concurrent Eng
, vol.8
, Issue.3
, pp. 158-170
-
-
O'Shea, B.1
Kaebernick, H.2
Grewal, S.S.3
-
31
-
-
0032633128
-
Automatic subassembly detection from a product model for disassembly sequence generation
-
Ong, N.S. and Wong, Y.C., Automatic subassembly detection from a product model for disassembly sequence generation. Int. J. Adv. Manufact. Technol., 1999, 15(6), 425-431.
-
(1999)
Int. J. Adv. Manufact. Technol
, vol.15
, Issue.6
, pp. 425-431
-
-
Ong, N.S.1
Wong, Y.C.2
-
32
-
-
28744440993
-
Generation method of products' disassembly sequence based on cut-sets
-
Pan, X., Liu, G. and Liu, Z., Generation method of products' disassembly sequence based on cut-sets. J. Hefei Univ. Technol., 2003, 26(1), 11-13.
-
(2003)
J. Hefei Univ. Technol
, vol.26
, Issue.1
, pp. 11-13
-
-
Pan, X.1
Liu, G.2
Liu, Z.3
-
33
-
-
0031123978
-
Evaluating the end-of-life value of a product and improving it by redesign
-
Pnueli, Y. and Zussman, E., Evaluating the end-of-life value of a product and improving it by redesign. Int. J. Product. Res., 1997, 35(4), 921-942.
-
(1997)
Int. J. Product. Res
, vol.35
, Issue.4
, pp. 921-942
-
-
Pnueli, Y.1
Zussman, E.2
-
34
-
-
36249003207
-
Subassembly detection and automatic generation of assembly sequences
-
Shu, Q. and Zhao, J., Subassembly detection and automatic generation of assembly sequences. J. Shenyang Inst. Technol., 2001, 20(4), 12-16.
-
(2001)
J. Shenyang Inst. Technol
, vol.20
, Issue.4
, pp. 12-16
-
-
Shu, Q.1
Zhao, J.2
-
35
-
-
0036657988
-
Integrated automatic generation of assembly sequences
-
Shu, Q., Hao, Y. and Wang, J., Integrated automatic generation of assembly sequences. J. Northeastern Univ. (Nat. Sci.), 2002, 23(7), 652-655.
-
(2002)
J. Northeastern Univ. (Nat. Sci.)
, vol.23
, Issue.7
, pp. 652-655
-
-
Shu, Q.1
Hao, Y.2
Wang, J.3
-
37
-
-
0000098669
-
A geometric algorithm for single selective disassembly using the wave propagation abstraction
-
Srinivasan, H. and Gadh, R., A geometric algorithm for single selective disassembly using the wave propagation abstraction. Computer-Aided Des., 1998b, 30(8), 603-613.
-
(1998)
Computer-Aided Des
, vol.30
, Issue.8
, pp. 603-613
-
-
Srinivasan, H.1
Gadh, R.2
-
39
-
-
36248955342
-
Subassembly recognition and assembly sequence planning based on graph
-
Tan, G., Li, G. and Chen, D., Subassembly recognition and assembly sequence planning based on graph. Robot, 2001, 23(1), 68-72.
-
(2001)
Robot
, vol.23
, Issue.1
, pp. 68-72
-
-
Tan, G.1
Li, G.2
Chen, D.3
-
40
-
-
0041368822
-
Disassembly modeling, planning and application
-
Tang, Y., Zhou, M.C., Zussman, E. and Caudill, R., Disassembly modeling, planning and application, J. Manufactur. Syst., 2002, 21(3), 200-217.
-
(2002)
J. Manufactur. Syst
, vol.21
, Issue.3
, pp. 200-217
-
-
Tang, Y.1
Zhou, M.C.2
Zussman, E.3
Caudill, R.4
-
41
-
-
36248935058
-
-
The Basel Action Network, and Silicon Valley Toxics Coalition, 2002, Exporting Harm: The High-tech Trashing of Asia.
-
The Basel Action Network, and Silicon Valley Toxics Coalition, 2002, Exporting Harm: The High-tech Trashing of Asia.
-
-
-
-
43
-
-
36248947583
-
A layer upon layer, step by step assembly sequence planning method
-
Wang, Y., Fan, Q. and Peng, Y., A layer upon layer, step by step assembly sequence planning method. Automation Manufact., 2001a, 23(3), 15-17.
-
(2001)
Automation Manufact
, vol.23
, Issue.3
, pp. 15-17
-
-
Wang, Y.1
Fan, Q.2
Peng, Y.3
-
44
-
-
0035275772
-
Product subassembly partition method based on fuzzy clustering
-
Wang, Y., Fan, Q. and Peng, Y., Product subassembly partition method based on fuzzy clustering. Mech. Sci. Technol., 2001b, 20(2), 299-301.
-
(2001)
Mech. Sci. Technol
, vol.20
, Issue.2
, pp. 299-301
-
-
Wang, Y.1
Fan, Q.2
Peng, Y.3
-
45
-
-
0036127739
-
The assembly design analysis of main spindle box assembly of NC boring and milling machine
-
Xie, L. and Dou, R., The assembly design analysis of main spindle box assembly of NC boring and milling machine. Chin. Mech. Eng., 2002, 13(2), 122-124.
-
(2002)
Chin. Mech. Eng
, vol.13
, Issue.2
, pp. 122-124
-
-
Xie, L.1
Dou, R.2
-
46
-
-
0036553301
-
Hierarchical segmentation algorithm for 3D mesh surface
-
Yan, J. and Shi, P., Hierarchical segmentation algorithm for 3D mesh surface. J. Shanghai Jiaotong Univ., 2002, 36(4), 494-497.
-
(2002)
J. Shanghai Jiaotong Univ
, vol.36
, Issue.4
, pp. 494-497
-
-
Yan, J.1
Shi, P.2
-
47
-
-
0033294404
-
Identification of subassemblies in sequence planning
-
Yang, P., Zhu, J. and Chen, X., Identification of subassemblies in sequence planning. J. Xi'an Jiaotong Univ., 1999, 33(12), 40-43.
-
(1999)
J. Xi'an Jiaotong Univ
, vol.33
, Issue.12
, pp. 40-43
-
-
Yang, P.1
Zhu, J.2
Chen, X.3
-
48
-
-
36248935059
-
Research on computer aided generation of assembly sequence
-
Yin, C., Zhong, B. and Yi, H., Research on computer aided generation of assembly sequence. Automat. Mech. Indust., 1998, 20(6), 18-20.
-
(1998)
Automat. Mech. Indust
, vol.20
, Issue.6
, pp. 18-20
-
-
Yin, C.1
Zhong, B.2
Yi, H.3
-
49
-
-
36248979620
-
Research on modularization of product based on green design
-
Zhang, K., Research on modularization of product based on green design. Machine Des., 2002, 19(9), 5-6.
-
(2002)
Machine Des
, vol.19
, Issue.9
, pp. 5-6
-
-
Zhang, K.1
-
52
-
-
36248978996
-
A method to generate assembly sequences based on cut-set
-
Zhang, J., Wei, S. and Yang, P., A method to generate assembly sequences based on cut-set. Technol. Aeronaut. Calcul., 1998, 28(4), 46-49.
-
(1998)
Technol. Aeronaut. Calcul
, vol.28
, Issue.4
, pp. 46-49
-
-
Zhang, J.1
Wei, S.2
Yang, P.3
-
53
-
-
0038402599
-
Research on subassembly stability in assembly sequences planning
-
Zhang, J., Wei, S. and Yang, P., Research on subassembly stability in assembly sequences planning. J. Northwest Univ. (Nat. Sci. Edn.), 1999, 29(4), 289-292.
-
(1999)
J. Northwest Univ. (Nat. Sci. Edn.)
, vol.29
, Issue.4
, pp. 289-292
-
-
Zhang, J.1
Wei, S.2
Yang, P.3
-
54
-
-
0042318977
-
Automatic process planning and subassembly detection for auto-body assembly
-
Zhang, Y., Zhou, J. and Lin, Z., Automatic process planning and subassembly detection for auto-body assembly. J. Computer-Aided Des. Comp. Graph., 2003, 15(6), 680-684.
-
(2003)
J. Computer-Aided Des. Comp. Graph
, vol.15
, Issue.6
, pp. 680-684
-
-
Zhang, Y.1
Zhou, J.2
Lin, Z.3
-
55
-
-
0033078088
-
A methodology for modeling and adaptive planning of disassembly processes
-
Zussman, E. and Zhou, M., A methodology for modeling and adaptive planning of disassembly processes. IEEE Trans. Rob. Automat., 1999, 15(1), 190-194.
-
(1999)
IEEE Trans. Rob. Automat
, vol.15
, Issue.1
, pp. 190-194
-
-
Zussman, E.1
Zhou, M.2
-
56
-
-
0033721516
-
Design and implementation of an adaptive process planner for disassembly processes
-
Zussman, E. and Zhou, M., Design and implementation of an adaptive process planner for disassembly processes. IEEE Trans. Rob. Autom., 2000, 16(2), 171-179.
-
(2000)
IEEE Trans. Rob. Autom
, vol.16
, Issue.2
, pp. 171-179
-
-
Zussman, E.1
Zhou, M.2
-
57
-
-
0028058444
-
Disassembly-oriented assessment methodology to support design for recycling
-
Zussman, E., Kriwet, A. and Seliger, G., Disassembly-oriented assessment methodology to support design for recycling. Ann. CIRP, 1994, 43(1), 9-14.
-
(1994)
Ann. CIRP
, vol.43
, Issue.1
, pp. 9-14
-
-
Zussman, E.1
Kriwet, A.2
Seliger, G.3
-
58
-
-
0031652021
-
Disassembly Petri net approach to modeling and planning disassembly processes of electronic products
-
Zussman, E., Zhou, M. and Caudill, R., Disassembly Petri net approach to modeling and planning disassembly processes of electronic products, in Proceedings of the IEEE International Symposium on Electronics and the Environment, 1998, pp. 331-336.
-
(1998)
Proceedings of the IEEE International Symposium on Electronics and the Environment
, pp. 331-336
-
-
Zussman, E.1
Zhou, M.2
Caudill, R.3
|