![]() |
Volumn 49, Issue 1, 2000, Pages 13-16
|
Method for sequencing the disassembly of products
|
Author keywords
[No Author keywords available]
|
Indexed keywords
FLEXIBLE MANUFACTURING SYSTEMS;
OPTIMIZATION;
PROCESS ENGINEERING;
PRODUCT DEVELOPMENT;
PRODUCTION ENGINEERING;
RESOURCE ALLOCATION;
SCHEDULING;
STRATEGIC PLANNING;
PARALLEL PRODUCT DISASSEMBLY PROCESS;
TASK ALLOCATIONS;
CELLULAR MANUFACTURING;
|
EID: 0033718996
PISSN: 00078506
EISSN: None
Source Type: Journal
DOI: 10.1016/S0007-8506(07)62886-8 Document Type: Article |
Times cited : (33)
|
References (7)
|