-
1
-
-
0023537240
-
Simplified generation of all mechanical assembly sequences
-
T. L. De Fazio and D. E. Whitney, "Simplified generation of all mechanical assembly sequences", IEEE Journal of Robotics and Automation, RA-3(6), pp. 640-658, 1987.
-
(1987)
IEEE Journal of Robotics and Automation
, vol.RA-3
, Issue.6
, pp. 640-658
-
-
De Fazio, T.L.1
Whitney, D.E.2
-
3
-
-
0026111068
-
An integrated computer aid for generating and evaluating assembly sequences for mechanical products
-
D. F. Baldwin, T. E. Abell, M. C. Lui, T. L. De Fazio and D. E. Whitney, "An integrated computer aid for generating and evaluating assembly sequences for mechanical products", IEEE Transactions on Robotics and Automation, 7(1), pp. 78-91, 1991.
-
(1991)
IEEE Transactions on Robotics and Automation
, vol.7
, Issue.1
, pp. 78-91
-
-
Baldwin, D.F.1
Abell, T.E.2
Lui, M.C.3
De Fazio, T.L.4
Whitney, D.E.5
-
6
-
-
0002089742
-
Automatic assembly of three-dimensional structures via connectivity graphs
-
M. Shpitalni, G. Elber and E. Lenz, "Automatic assembly of three-dimensional structures via connectivity graphs", CIRP, 38(1), pp. 25-28, 1989.
-
(1989)
CIRP
, vol.38
, Issue.1
, pp. 25-28
-
-
Shpitalni, M.1
Elber, G.2
Lenz, E.3
-
7
-
-
0003099486
-
An approach to the automatic assembly planning problem
-
E. Zussman, E. Lenz and M. Shpitalni, "An approach to the automatic assembly planning problem", Annals CIRP, 39(1), pp. 33-36, 1990.
-
(1990)
Annals CIRP
, vol.39
, Issue.1
, pp. 33-36
-
-
Zussman, E.1
Lenz, E.2
Shpitalni, M.3
-
8
-
-
0025888128
-
Automatic generation of production disassembly sequences
-
A. Subramani and P. Dewhurst, "Automatic generation of production disassembly sequences", Annals CIRP, 40(1), pp. 115-118, 1991.
-
(1991)
Annals CIRP
, vol.40
, Issue.1
, pp. 115-118
-
-
Subramani, A.1
Dewhurst, P.2
-
9
-
-
0027066109
-
Planning of products assembly and disassembly
-
L. Laperriere and H. A. ElMaraghy, "Planning of products assembly and disassembly", Annals CIRP, 41(2), pp. 5-9, 1992.
-
(1992)
Annals CIRP
, vol.41
, Issue.2
, pp. 5-9
-
-
Laperriere, L.1
ElMaraghy, H.A.2
-
10
-
-
0027052183
-
Automated sequencing and subassembly detection in assembly planning
-
G. Dini and M. Santochi, "Automated sequencing and subassembly detection in assembly planning", Annals CIRP, 41(1), pp. 1-4, 1992.
-
(1992)
Annals CIRP
, vol.41
, Issue.1
, pp. 1-4
-
-
Dini, G.1
Santochi, M.2
-
11
-
-
0023142910
-
Automatic assembling procedure generation from mating conditions
-
H. Ko and K. Lee, "Automatic assembling procedure generation from mating conditions", Computer-Aided Design, 19(1), pp. 3-10, 1987.
-
(1987)
Computer-aided Design
, vol.19
, Issue.1
, pp. 3-10
-
-
Ko, H.1
Lee, K.2
-
13
-
-
0031700901
-
Integrated knowledge-based assembly sequence-planning
-
X. F. Zha, Y. E. Lim and S. C. Fok, "Integrated knowledge-based assembly sequence-planning", International Journal of Advanced Manufacturing Technology, 14(1), pp. 50-64, 1998.
-
(1998)
International Journal of Advanced Manufacturing Technology
, vol.14
, Issue.1
, pp. 50-64
-
-
Zha, X.F.1
Lim, Y.E.2
Fok, S.C.3
|