-
4
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker P., Drexl A., Möhring R., Neumann K., Pesch E. Resource-constrained project scheduling. Notation, classification, models, and methods European Journal of Operational Research. 112(1):1999;3-41
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.1
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
5
-
-
0004421071
-
An evolution programme for the resource-constrained project scheduling problem
-
Cheng R., Gen M. An evolution programme for the resource-constrained project scheduling problem. International Journal of Computer Integrated Manufacturing. 11(3):1998;274-287
-
(1998)
International Journal of Computer Integrated Manufacturing
, vol.11
, Issue.3
, pp. 274-287
-
-
Cheng, R.1
Gen, M.2
-
6
-
-
0031188915
-
A simulated annealing algorithm for resource constrained project scheduling problems
-
Cho J.-H., Kim Y.D. A simulated annealing algorithm for resource constrained project scheduling problems. Journal of the Operational Research Society. 49:1997;736-744
-
(1997)
Journal of the Operational Research Society
, vol.49
, pp. 736-744
-
-
Cho, J.-H.1
Kim, Y.D.2
-
7
-
-
85102188694
-
Belief maintenance in dynamic constraint networks
-
Dechter, R., Dechter, A., 1988. Belief maintenance in dynamic constraint networks. Proceedings of the AAAI, pp. 37-42.
-
(1988)
Proceedings of the AAAI
, pp. 37-42
-
-
Dechter, R.1
Dechter, A.2
-
8
-
-
0025449198
-
Simulated annealing: A tool for operational research
-
Eglese R.W. Simulated annealing. A tool for operational research European Journal of Operational Research. 46:1990;271-281
-
(1990)
European Journal of Operational Research
, vol.46
, pp. 271-281
-
-
Eglese, R.W.1
-
9
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
Glover F. Future paths for integer programming and links to artificial intelligence. Computers and Operations Research. 13:1986;533-549
-
(1986)
Computers and Operations Research
, vol.13
, pp. 533-549
-
-
Glover, F.1
-
11
-
-
0028524436
-
Fuzzy project scheduling system for software development
-
Hapke M., Slowinski R. Fuzzy project scheduling system for software development. Fuzzy Sets and Systems. 67:1994;101-117
-
(1994)
Fuzzy Sets and Systems
, vol.67
, pp. 101-117
-
-
Hapke, M.1
Slowinski, R.2
-
12
-
-
0030286425
-
Fuzzy priority heuristics for project scheduling
-
Hapke M., Slowinski R. Fuzzy priority heuristics for project scheduling. Fuzzy Sets and Systems. 83:1996;291-299
-
(1996)
Fuzzy Sets and Systems
, vol.83
, pp. 291-299
-
-
Hapke, M.1
Slowinski, R.2
-
13
-
-
0024770085
-
Optimization by simulated annealing: An experimental evaluation - Part I (graph partitioning)
-
Johnson D.S., Aragon C.R., McGeoch L.A., Schevon C. Optimization by simulated annealing. An experimental evaluation - Part I (graph partitioning) Operations Research. 37(6):1989;865-892
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 865-892
-
-
Johnson, D.S.1
Aragon, C.R.2
McGeoch, L.A.3
Schevon, C.4
-
14
-
-
0001047763
-
Optimization by simulated annealing: An experimental evaluation - Part II (graph coloring and number partitioning)
-
Johnson D.S., Aragon C.R., McGeoch L.A., Schevon C. Optimization by simulated annealing. An experimental evaluation - Part II (graph coloring and number partitioning) Operations Research. 39(3):1991;378-406
-
(1991)
Operations Research
, vol.39
, Issue.3
, pp. 378-406
-
-
Johnson, D.S.1
Aragon, C.R.2
McGeoch, L.A.3
Schevon, C.4
-
15
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revised: Theory and computation
-
Kolisch R. Serial and parallel resource-constrained project scheduling methods revised. Theory and computation European Journal of Operational Research. 90:1996;320-333
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
16
-
-
0012889212
-
An integrated survey of project scheduling
-
Institut für Betriebswirtschaftslehre, Christian-Albrechts-Universität, Kiel, Germany.
-
Kolisch, R., Padman, R., 1997. An integrated survey of project scheduling, Technical Report no. 463, Institut für Betriebswirtschaftslehre, Christian-Albrechts-Universität, Kiel, Germany.
-
(1997)
Technical Report No. 463
, vol.463
-
-
Kolisch, R.1
Padman, R.2
-
18
-
-
0030151930
-
Search heuristics for resource-constrained project scheduling
-
Lee J.-K., Kim Y.-D. Search heuristics for resource-constrained project scheduling. Journal of the Operational Research Society. 47(5):1996;678-689
-
(1996)
Journal of the Operational Research Society
, vol.47
, Issue.5
, pp. 678-689
-
-
Lee, J.-K.1
Kim, Y.-D.2
-
21
-
-
0031192667
-
A genetic algorithm for multi-mode resource constrained project scheduling problem
-
Mori M., Tseng C.C. A genetic algorithm for multi-mode resource constrained project scheduling problem. European Journal of Operational Research. 100(1):1997;134-141
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.1
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
22
-
-
0030125477
-
A computational study of constraint satisfaction for multiple capacitated job shop scheduling
-
Nuitjen W.P.M., Aarts E.H.L. A computational study of constraint satisfaction for multiple capacitated job shop scheduling. European Journal of Operational Research. 90:1996;269-284
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 269-284
-
-
Nuitjen, W.P.M.1
Aarts, E.H.L.2
-
24
-
-
0029393209
-
A survey on the resource-constrained project scheduling problem
-
Özdamar L., Ulusoy G. A survey on the resource-constrained project scheduling problem. IIE Transactions. 27(5):1995;574-586
-
(1995)
IIE Transactions
, vol.27
, Issue.5
, pp. 574-586
-
-
Özdamar, L.1
Ulusoy, G.2
-
25
-
-
0030246423
-
Variable and value ordering heuristics for the job shop scheduling constraint satisfaction problem
-
Sadeh N., Fox M.S. Variable and value ordering heuristics for the job shop scheduling constraint satisfaction problem. Artificial intelligence. 86(1):1996;1-41
-
(1996)
Artificial Intelligence
, vol.86
, Issue.1
, pp. 1-41
-
-
Sadeh, N.1
Fox, M.S.2
-
26
-
-
0023015634
-
Callisto: An intelligent project management system
-
Sathi A., Morton T.E., Roth S.F. Callisto. An intelligent project management system AI Magazine. 7(5):1986;34-51
-
(1986)
AI Magazine
, vol.7
, Issue.5
, pp. 34-51
-
-
Sathi, A.1
Morton, T.E.2
Roth, S.F.3
-
27
-
-
0025442958
-
An integrated framework for generating and revising factory schedulers
-
Smith S.F., Ow P.S., Muscettola N., Potvin J.Y., Matthys D. An integrated framework for generating and revising factory schedulers. Journal of the Operational Research Society. 41(6):1990;539-552
-
(1990)
Journal of the Operational Research Society
, vol.41
, Issue.6
, pp. 539-552
-
-
Smith, S.F.1
Ow, P.S.2
Muscettola, N.3
Potvin, J.Y.4
Matthys, D.5
-
28
-
-
0026170795
-
Why is software late? An empirical study of reasons for delay in software development
-
van Genuchten M. Why is software late? An empirical study of reasons for delay in software development. IEEE Transactions on Software Engineering. 17(6):1991;582-590
-
(1991)
IEEE Transactions on Software Engineering
, vol.17
, Issue.6
, pp. 582-590
-
-
Van Genuchten, M.1
-
31
-
-
0037117669
-
A fuzzy project scheduling approach to minimize schedule risk for product development
-
Wang J. A fuzzy project scheduling approach to minimize schedule risk for product development. Fuzzy Sets and Systems. 127(2):2002;99-116
-
(2002)
Fuzzy Sets and Systems
, vol.127
, Issue.2
, pp. 99-116
-
-
Wang, J.1
-
32
-
-
0141859879
-
A fuzzy robust scheduling approach for product development projects
-
Wang J. A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research. 152(1):2004;180-194
-
(2004)
European Journal of Operational Research
, vol.152
, Issue.1
, pp. 180-194
-
-
Wang, J.1
-
33
-
-
0003227484
-
The role of concurrent engineering in weapons system acquisition
-
Institute for Defense Analysis, Alexandria, VA.
-
Winner, R.I., Pennell, J.P., Bertrand, H.E., Slusarczuk, M.M.G., 1988. The role of concurrent engineering in weapons system acquisition. IDA Report R-338, Institute for Defense Analysis, Alexandria, VA.
-
(1988)
IDA Report
, vol.R-338
-
-
Winner, R.I.1
Pennell, J.P.2
Bertrand, H.E.3
Slusarczuk, M.M.G.4
-
35
-
-
0027700624
-
Scheduling and rescheduling with iterative repair
-
Zweben M., Davis E., Daun B., Deale M.J. Scheduling and rescheduling with iterative repair. IEEE Transactions on Systems, Man, and Cybernetics. 23(6):1993;1588-1596
-
(1993)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.23
, Issue.6
, pp. 1588-1596
-
-
Zweben, M.1
Davis, E.2
Daun, B.3
Deale, M.J.4
|