메뉴 건너뛰기




Volumn 95, Issue 3, 2005, Pages 399-414

Constraint-based schedule repair for product development projects with time-limited constraints

Author keywords

Genetic algorithms; Product development; Project scheduling; Resource allocation; Simulated annealing

Indexed keywords

BENCHMARKING; CONSTRAINT THEORY; COSTS; GENETIC ALGORITHMS; REPAIR; RESEARCH AND DEVELOPMENT MANAGEMENT; RESOURCE ALLOCATION; SCHEDULING; SIMULATED ANNEALING; SOCIETIES AND INSTITUTIONS;

EID: 12244267730     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2004.02.005     Document Type: Article
Times cited : (47)

References (35)
  • 5
    • 0004421071 scopus 로고    scopus 로고
    • An evolution programme for the resource-constrained project scheduling problem
    • Cheng R., Gen M. An evolution programme for the resource-constrained project scheduling problem. International Journal of Computer Integrated Manufacturing. 11(3):1998;274-287
    • (1998) International Journal of Computer Integrated Manufacturing , vol.11 , Issue.3 , pp. 274-287
    • Cheng, R.1    Gen, M.2
  • 6
    • 0031188915 scopus 로고    scopus 로고
    • A simulated annealing algorithm for resource constrained project scheduling problems
    • Cho J.-H., Kim Y.D. A simulated annealing algorithm for resource constrained project scheduling problems. Journal of the Operational Research Society. 49:1997;736-744
    • (1997) Journal of the Operational Research Society , vol.49 , pp. 736-744
    • Cho, J.-H.1    Kim, Y.D.2
  • 7
    • 85102188694 scopus 로고
    • Belief maintenance in dynamic constraint networks
    • Dechter, R., Dechter, A., 1988. Belief maintenance in dynamic constraint networks. Proceedings of the AAAI, pp. 37-42.
    • (1988) Proceedings of the AAAI , pp. 37-42
    • Dechter, R.1    Dechter, A.2
  • 8
    • 0025449198 scopus 로고
    • Simulated annealing: A tool for operational research
    • Eglese R.W. Simulated annealing. A tool for operational research European Journal of Operational Research. 46:1990;271-281
    • (1990) European Journal of Operational Research , vol.46 , pp. 271-281
    • Eglese, R.W.1
  • 9
    • 0022865373 scopus 로고
    • Future paths for integer programming and links to artificial intelligence
    • Glover F. Future paths for integer programming and links to artificial intelligence. Computers and Operations Research. 13:1986;533-549
    • (1986) Computers and Operations Research , vol.13 , pp. 533-549
    • Glover, F.1
  • 11
    • 0028524436 scopus 로고
    • Fuzzy project scheduling system for software development
    • Hapke M., Slowinski R. Fuzzy project scheduling system for software development. Fuzzy Sets and Systems. 67:1994;101-117
    • (1994) Fuzzy Sets and Systems , vol.67 , pp. 101-117
    • Hapke, M.1    Slowinski, R.2
  • 12
    • 0030286425 scopus 로고    scopus 로고
    • Fuzzy priority heuristics for project scheduling
    • Hapke M., Slowinski R. Fuzzy priority heuristics for project scheduling. Fuzzy Sets and Systems. 83:1996;291-299
    • (1996) Fuzzy Sets and Systems , vol.83 , pp. 291-299
    • Hapke, M.1    Slowinski, R.2
  • 13
    • 0024770085 scopus 로고
    • Optimization by simulated annealing: An experimental evaluation - Part I (graph partitioning)
    • Johnson D.S., Aragon C.R., McGeoch L.A., Schevon C. Optimization by simulated annealing. An experimental evaluation - Part I (graph partitioning) Operations Research. 37(6):1989;865-892
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 865-892
    • Johnson, D.S.1    Aragon, C.R.2    McGeoch, L.A.3    Schevon, C.4
  • 14
    • 0001047763 scopus 로고
    • Optimization by simulated annealing: An experimental evaluation - Part II (graph coloring and number partitioning)
    • Johnson D.S., Aragon C.R., McGeoch L.A., Schevon C. Optimization by simulated annealing. An experimental evaluation - Part II (graph coloring and number partitioning) Operations Research. 39(3):1991;378-406
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 378-406
    • Johnson, D.S.1    Aragon, C.R.2    McGeoch, L.A.3    Schevon, C.4
  • 15
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revised: Theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revised. Theory and computation European Journal of Operational Research. 90:1996;320-333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 16
    • 0012889212 scopus 로고    scopus 로고
    • An integrated survey of project scheduling
    • Institut für Betriebswirtschaftslehre, Christian-Albrechts-Universität, Kiel, Germany.
    • Kolisch, R., Padman, R., 1997. An integrated survey of project scheduling, Technical Report no. 463, Institut für Betriebswirtschaftslehre, Christian-Albrechts-Universität, Kiel, Germany.
    • (1997) Technical Report No. 463 , vol.463
    • Kolisch, R.1    Padman, R.2
  • 18
    • 0030151930 scopus 로고    scopus 로고
    • Search heuristics for resource-constrained project scheduling
    • Lee J.-K., Kim Y.-D. Search heuristics for resource-constrained project scheduling. Journal of the Operational Research Society. 47(5):1996;678-689
    • (1996) Journal of the Operational Research Society , vol.47 , Issue.5 , pp. 678-689
    • Lee, J.-K.1    Kim, Y.-D.2
  • 19
    • 0033102403 scopus 로고    scopus 로고
    • Scheduling of design projects with uncertain number of iterations
    • Luh P.B., Liu F., Moser B. Scheduling of design projects with uncertain number of iterations. European Journal of Operational Research. 113:1999;575-592
    • (1999) European Journal of Operational Research , vol.113 , pp. 575-592
    • Luh, P.B.1    Liu, F.2    Moser, B.3
  • 21
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for multi-mode resource constrained project scheduling problem
    • Mori M., Tseng C.C. A genetic algorithm for multi-mode resource constrained project scheduling problem. European Journal of Operational Research. 100(1):1997;134-141
    • (1997) European Journal of Operational Research , vol.100 , Issue.1 , pp. 134-141
    • Mori, M.1    Tseng, C.C.2
  • 22
    • 0030125477 scopus 로고    scopus 로고
    • A computational study of constraint satisfaction for multiple capacitated job shop scheduling
    • Nuitjen W.P.M., Aarts E.H.L. A computational study of constraint satisfaction for multiple capacitated job shop scheduling. European Journal of Operational Research. 90:1996;269-284
    • (1996) European Journal of Operational Research , vol.90 , pp. 269-284
    • Nuitjen, W.P.M.1    Aarts, E.H.L.2
  • 24
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Özdamar L., Ulusoy G. A survey on the resource-constrained project scheduling problem. IIE Transactions. 27(5):1995;574-586
    • (1995) IIE Transactions , vol.27 , Issue.5 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 25
    • 0030246423 scopus 로고    scopus 로고
    • Variable and value ordering heuristics for the job shop scheduling constraint satisfaction problem
    • Sadeh N., Fox M.S. Variable and value ordering heuristics for the job shop scheduling constraint satisfaction problem. Artificial intelligence. 86(1):1996;1-41
    • (1996) Artificial Intelligence , vol.86 , Issue.1 , pp. 1-41
    • Sadeh, N.1    Fox, M.S.2
  • 26
    • 0023015634 scopus 로고
    • Callisto: An intelligent project management system
    • Sathi A., Morton T.E., Roth S.F. Callisto. An intelligent project management system AI Magazine. 7(5):1986;34-51
    • (1986) AI Magazine , vol.7 , Issue.5 , pp. 34-51
    • Sathi, A.1    Morton, T.E.2    Roth, S.F.3
  • 28
    • 0026170795 scopus 로고
    • Why is software late? An empirical study of reasons for delay in software development
    • van Genuchten M. Why is software late? An empirical study of reasons for delay in software development. IEEE Transactions on Software Engineering. 17(6):1991;582-590
    • (1991) IEEE Transactions on Software Engineering , vol.17 , Issue.6 , pp. 582-590
    • Van Genuchten, M.1
  • 31
    • 0037117669 scopus 로고    scopus 로고
    • A fuzzy project scheduling approach to minimize schedule risk for product development
    • Wang J. A fuzzy project scheduling approach to minimize schedule risk for product development. Fuzzy Sets and Systems. 127(2):2002;99-116
    • (2002) Fuzzy Sets and Systems , vol.127 , Issue.2 , pp. 99-116
    • Wang, J.1
  • 32
    • 0141859879 scopus 로고    scopus 로고
    • A fuzzy robust scheduling approach for product development projects
    • Wang J. A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research. 152(1):2004;180-194
    • (2004) European Journal of Operational Research , vol.152 , Issue.1 , pp. 180-194
    • Wang, J.1
  • 33
    • 0003227484 scopus 로고
    • The role of concurrent engineering in weapons system acquisition
    • Institute for Defense Analysis, Alexandria, VA.
    • Winner, R.I., Pennell, J.P., Bertrand, H.E., Slusarczuk, M.M.G., 1988. The role of concurrent engineering in weapons system acquisition. IDA Report R-338, Institute for Defense Analysis, Alexandria, VA.
    • (1988) IDA Report , vol.R-338
    • Winner, R.I.1    Pennell, J.P.2    Bertrand, H.E.3    Slusarczuk, M.M.G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.