-
1
-
-
0003925028
-
-
Wiley: New York
-
Baccelli, F.L., Cohen, G., Olsder, G.J. and Quadrat, J.P., Synchronization and Linearity: An Algebra for Discrete Event Systems, 1992 (Wiley: New York).
-
(1992)
Synchronization and Linearity: An Algebra for Discrete Event Systems
-
-
Baccelli, F.L.1
Cohen, G.2
Olsder, G.J.3
Quadrat, J.P.4
-
2
-
-
23844544249
-
On liveness and controlled siphons in Petri nets
-
Barkaoui, K. and Pradat-Peyre, J.F., On liveness and controlled siphons in Petri nets. Lect. Notes Comput. Sci., 1996, 1091, 57-72.
-
(1996)
Lect. Notes Comput. Sci
, vol.1091
, pp. 57-72
-
-
Barkaoui, K.1
Pradat-Peyre, J.F.2
-
3
-
-
0036476753
-
-
Che, A., Chu, C. and Chu, F., Multicyclic hoist scheduling with constant processing times. IEEE Trans. Robot. Automn, 2002, 18, 69-80.
-
Che, A., Chu, C. and Chu, F., Multicyclic hoist scheduling with constant processing times. IEEE Trans. Robot. Automn, 2002, 18, 69-80.
-
-
-
-
4
-
-
0032000755
-
Cyclic scheduling of a hoist with time window constraints
-
Chen, H., Chu, C. and Proth, J.M., Cyclic scheduling of a hoist with time window constraints. IEEE Trans. Robot. Auromn, 1998, 14, 144-152.
-
(1998)
IEEE Trans. Robot. Auromn
, vol.14
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.M.3
-
5
-
-
0034367676
-
Cyclic scheduling in robotic flowshops
-
Crama, Y., Kats, V., van de Klundert, J. and Levner, E., Cyclic scheduling in robotic flowshops, Ann. Oper. Res., 2000, 96, 97-124.
-
(2000)
Ann. Oper. Res
, vol.96
, pp. 97-124
-
-
Crama, Y.1
Kats, V.2
van de Klundert, J.3
Levner, E.4
-
6
-
-
85008049266
-
Comments on "Deadlock avoidance policy for Petri-net modeling of flexible manufacturing systems with shared resources
-
Garcia-Vallés, F., Colom, J.M. and Ezpeleta, J., Comments on "Deadlock avoidance policy for Petri-net modeling of flexible manufacturing systems with shared resources". IEEE Trans. Autom. Contr., 2000, 45, 1760-1761.
-
(2000)
IEEE Trans. Autom. Contr
, vol.45
, pp. 1760-1761
-
-
Garcia-Vallés, F.1
Colom, J.M.2
Ezpeleta, J.3
-
7
-
-
0029480883
-
Towards an optimal dead-lock avoidance algorithm for flexible manufacturing systems
-
Man, and Cybernetics
-
Gurov, D.B., Muller, H.A., Kapron, B.M. and Escalante, M.A., Towards an optimal dead-lock avoidance algorithm for flexible manufacturing systems, in Proceedings of the IEEE International Conference Systems, Man, and Cybernetics, 1995, pp. 4137-4142.
-
(1995)
Proceedings of the IEEE International Conference Systems
, pp. 4137-4142
-
-
Gurov, D.B.1
Muller, H.A.2
Kapron, B.M.3
Escalante, M.A.4
-
8
-
-
0345757595
-
Cyclic scheduling in a robotic production line
-
Kats, V. and Levner, E., Cyclic scheduling in a robotic production line. J. Schedul., 2002, 5, 23-41.
-
(2002)
J. Schedul
, vol.5
, pp. 23-41
-
-
Kats, V.1
Levner, E.2
-
9
-
-
0041384559
-
Scheduling analysis of time-constrained dual-armed cluster tools
-
Kim, J.H., Lee, T.E., Lee, H.Y. and Park, D.B., Scheduling analysis of time-constrained dual-armed cluster tools. IEEE Trans. Semicond. Mfg, 2003, 6, 521-534.
-
(2003)
IEEE Trans. Semicond. Mfg
, vol.6
, pp. 521-534
-
-
Kim, J.H.1
Lee, T.E.2
Lee, H.Y.3
Park, D.B.4
-
10
-
-
33646717079
-
Scheduling single-armed cluster tools with reentrant wafer flows
-
to appear
-
Lee, H.Y. and Lee, T.E., Scheduling single-armed cluster tools with reentrant wafer flows. IEEE Trans. Semicond. Mfg, 2006 (to appear).
-
(2006)
IEEE Trans. Semicond. Mfg
-
-
Lee, H.Y.1
Lee, T.E.2
-
11
-
-
0033891784
-
Stable earliest schedule for cyclic job shops: A linear system approach
-
Lee, T.E., Stable earliest schedule for cyclic job shops: a linear system approach. Int. J. flex. Mfg Syst., 2000, 12, 59-82.
-
(2000)
Int. J. flex. Mfg Syst
, vol.12
, pp. 59-82
-
-
Lee, T.E.1
-
12
-
-
27644434964
-
An extended event graph with negative places and tokens for time window constraints
-
Lee, T.-E. and Park, S.-H., An extended event graph with negative places and tokens for time window constraints. IEEE Trans. Automn Sci. Engng, 2005a, 2, 319-332.
-
(2005)
IEEE Trans. Automn Sci. Engng
, vol.2
, pp. 319-332
-
-
Lee, T.-E.1
Park, S.-H.2
-
14
-
-
0030691565
-
Performance measures and schedules in periodic job shops
-
Lee, T.E. and Posner, M.E., Performance measures and schedules in periodic job shops. Oper. Res., 1997, 45, 72-91.
-
(1997)
Oper. Res
, vol.45
, pp. 72-91
-
-
Lee, T.E.1
Posner, M.E.2
-
15
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single-hoist electroplating line
-
Lei, L. and Wang, T.J., Determining optimal cyclic hoist schedules in a single-hoist electroplating line. IIE Trans., 1994, 26, 25-33.
-
(1994)
IIE Trans
, vol.26
, pp. 25-33
-
-
Lei, L.1
Wang, T.J.2
-
16
-
-
12344318544
-
Optimal cyclic multi-hoist scheduling: A mixed integer programming approach
-
Leung, J.M.Y., Zhang, G., Yang, X., Mak, R. and Lam, K., Optimal cyclic multi-hoist scheduling: a mixed integer programming approach. Oper. Res., 2004, 52, 965-976.
-
(2004)
Oper. Res
, vol.52
, pp. 965-976
-
-
Leung, J.M.Y.1
Zhang, G.2
Yang, X.3
Mak, R.4
Lam, K.5
-
17
-
-
0032165056
-
Analysis of deadlock and circular waits using a matrix model for flexible manufactruing systems
-
Lewis, F.L., Gurel, A., Bogdan, S., Doganalp, A. and Pastravanu, O.C., Analysis of deadlock and circular waits using a matrix model for flexible manufactruing systems. Automatica, 1998, 34, 1083-1100.
-
(1998)
Automatica
, vol.34
, pp. 1083-1100
-
-
Lewis, F.L.1
Gurel, A.2
Bogdan, S.3
Doganalp, A.4
Pastravanu, O.C.5
-
18
-
-
0036778727
-
Cyclic scheduling of a single hoist in extended electroplating lines: A comprehensive integer programming solution
-
Liu, J., Jiang, Y. and Zhou, Z., Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution. IIE Trans., 2002, 34, 905-914.
-
(2002)
IIE Trans
, vol.34
, pp. 905-914
-
-
Liu, J.1
Jiang, Y.2
Zhou, Z.3
-
19
-
-
0033974208
-
Evaluation of cleaning efficiency with a radioactive tracer and development of a microwave digestion method for semiconductor processes
-
Lu, J.K., Ko, F.H., Chu, T.C., Sun, Y.C., Wang, M.Y. and Wang, T.K., Evaluation of cleaning efficiency with a radioactive tracer and development of a microwave digestion method for semiconductor processes. Anal. chim. Acta, 2000, 407, 291-300.
-
(2000)
Anal. chim. Acta
, vol.407
, pp. 291-300
-
-
Lu, J.K.1
Ko, F.H.2
Chu, T.C.3
Sun, Y.C.4
Wang, M.Y.5
Wang, T.K.6
-
20
-
-
0034175276
-
Constraint-based model for the cyclic multi-hoists scheduling problem
-
Manier, M.A., Varnier, C. and Baptiste, P., Constraint-based model for the cyclic multi-hoists scheduling problem. Prod. Plann. Contr., 2000, 11, 244-257.
-
(2000)
Prod. Plann. Contr
, vol.11
, pp. 244-257
-
-
Manier, M.A.1
Varnier, C.2
Baptiste, P.3
-
21
-
-
0036996381
-
Deadlock analysis and routing on free-choice multipart reentrant flow lines using a matrix-based discrete event control
-
Mireles, J. and Lewis, F.L., Deadlock analysis and routing on free-choice multipart reentrant flow lines using a matrix-based discrete event control, in Proceedings of the 41st IEEE Conference on Decision and Control, 2002, pp. 793-798.
-
(2002)
Proceedings of the 41st IEEE Conference on Decision and Control
, pp. 793-798
-
-
Mireles, J.1
Lewis, F.L.2
-
22
-
-
0024645936
-
Petri nets: Properties, analysis and applications
-
Murata, T., Petri nets: properties, analysis and applications. Proc. IEEE, 1989, 77, 541-580.
-
(1989)
Proc. IEEE
, vol.77
, pp. 541-580
-
-
Murata, T.1
-
23
-
-
0029770852
-
A branch and bound algorithm for hoist scheduling of a circuit board production line
-
Ng, W.C., A branch and bound algorithm for hoist scheduling of a circuit board production line. Int. J. flex. Mfg Syst., 1996, 8, 44-65.
-
(1996)
Int. J. flex. Mfg Syst
, vol.8
, pp. 44-65
-
-
Ng, W.C.1
-
24
-
-
0016962332
-
Mathematical programming solution of a hoist scheduling program
-
Phillips, L.W. and Unger, P.S., Mathematical programming solution of a hoist scheduling program. AIIE Trans., 1976, 8, 219-225.
-
(1976)
AIIE Trans
, vol.8
, pp. 219-225
-
-
Phillips, L.W.1
Unger, P.S.2
-
26
-
-
0035485501
-
-
Rostami, S., Hamidzadeh, B. and Camporese, D., An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints. IEEE Trans. Robot. Automn, 2001, 17, 609-618.
-
Rostami, S., Hamidzadeh, B. and Camporese, D., An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints. IEEE Trans. Robot. Automn, 2001, 17, 609-618.
-
-
-
-
27
-
-
0036820026
-
Steady state analysis of cyclic job shops with overtaking
-
Seo, J.W. and Lee, T.E., Steady state analysis of cyclic job shops with overtaking. Int. J. flex. Mfg Syst., 2002, 14, 291-318.
-
(2002)
Int. J. flex. Mfg Syst
, vol.14
, pp. 291-318
-
-
Seo, J.W.1
Lee, T.E.2
-
28
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
Shaping G.W. and Nuttle, H.L., Hoist scheduling for a PCB electroplating facility. IIE Trans., 1988, 20, 157-167.
-
(1988)
IIE Trans
, vol.20
, pp. 157-167
-
-
Shaping, G.W.1
Nuttle, H.L.2
-
29
-
-
1342287000
-
Deadlock-free scheduling method for photolithography equipment in semiconductor fabrication
-
Yoon, H.J. and Lee, D.Y., Deadlock-free scheduling method for photolithography equipment in semiconductor fabrication. IEEE Trans. Semicond. Mfg, 2004, 17, 42-54.
-
(2004)
IEEE Trans. Semicond. Mfg
, vol.17
, pp. 42-54
-
-
Yoon, H.J.1
Lee, D.Y.2
|