메뉴 건너뛰기




Volumn 5997, Issue , 2005, Pages

The effect of sudden server breakdown on the performance of a disassembly line

Author keywords

Breakdowns; Disassembly; JIT; Kanban

Indexed keywords

BREAKDOWNS; DISASSEMBLY; JIT; KANBAN;

EID: 33644635504     PISSN: 0277786X     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1117/12.630866     Document Type: Conference Paper
Times cited : (6)

References (17)
  • 2
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • Gungor A. and Gupta S. M., A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures, International Journal of Production Research, Vol. 39, No. 7, 1427-1467, 2001.
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Gungor, A.1    Gupta, S.M.2
  • 4
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery: A survey
    • Gungor A. and Gupta S. M., Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey, Computer and Industrial Engineering, Vol. 36, No. 4, 811-853, 1999.
    • (1999) Computer and Industrial Engineering , vol.36 , Issue.4 , pp. 811-853
    • Gungor, A.1    Gupta, S.M.2
  • 5
    • 0032089489 scopus 로고    scopus 로고
    • Adapting just-in-time manufacturing systems to preventive maintenance interrupts
    • Gupta S. M. and Al-Turki Y. A. Y., Adapting Just-In-Time Manufacturing Systems to Preventive Maintenance Interrupts. Production Planning and Control, Vol. 9, No. 4, 349-359, 1998.
    • (1998) Production Planning and Control , vol.9 , Issue.4 , pp. 349-359
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 6
    • 0031103287 scopus 로고    scopus 로고
    • An algorithm to dynamically adjust the number of kanbans in a stochastic processing times and variable demand environment
    • Gupta S. M. and Al-Turki Y. A. Y., An Algorithm to Dynamically Adjust the Number of Kanbans in a Stochastic Processing Times and Variable Demand Environment, Production Planning and Control, Vol. 8, No. 2, 133-141, 1997.
    • (1997) Production Planning and Control , vol.8 , Issue.2 , pp. 133-141
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 7
    • 0032122862 scopus 로고    scopus 로고
    • The effect of sudden material handling system breakdown on the performance of a JIT system
    • Gupta S. M. and Al-Turki Y. A. Y., The Effect of Sudden Material Handling System Breakdown on the Performance of a JIT System, International Journal of Production Research, Vol. 36, No. 7, 1935-1960, 1998.
    • (1998) International Journal of Production Research , vol.36 , Issue.7 , pp. 1935-1960
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.