-
1
-
-
21844513640
-
Operations planning issues in an assembly/disassembly environment
-
Brennan L., Gupta S. M. and Taleb K. N., Operations Planning Issues in an Assembly/Disassembly Environment, International Journal of Operations and Production Management, Vol. 14, No. 9, 57-67, 1994.
-
(1994)
International Journal of Operations and Production Management
, vol.14
, Issue.9
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
2
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
Gungor A. and Gupta S. M., A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures, International Journal of Production Research, Vol. 39, No. 7, 1427-1467, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
3
-
-
0037143030
-
Disassembly line in product recovery
-
Gungor A. and Gupta S. M., Disassembly Line in Product Recovery, International Journal of Production Research, Vol. 40, No. 11, 2569-2589, 2002.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.11
, pp. 2569-2589
-
-
Gungor, A.1
Gupta, S.M.2
-
4
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
Gungor A. and Gupta S. M., Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey, Computer and Industrial Engineering, Vol. 36, No. 4, 811-853, 1999.
-
(1999)
Computer and Industrial Engineering
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
5
-
-
0032089489
-
Adapting just-in-time manufacturing systems to preventive maintenance interrupts
-
Gupta S. M. and Al-Turki Y. A. Y., Adapting Just-In-Time Manufacturing Systems to Preventive Maintenance Interrupts. Production Planning and Control, Vol. 9, No. 4, 349-359, 1998.
-
(1998)
Production Planning and Control
, vol.9
, Issue.4
, pp. 349-359
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
6
-
-
0031103287
-
An algorithm to dynamically adjust the number of kanbans in a stochastic processing times and variable demand environment
-
Gupta S. M. and Al-Turki Y. A. Y., An Algorithm to Dynamically Adjust the Number of Kanbans in a Stochastic Processing Times and Variable Demand Environment, Production Planning and Control, Vol. 8, No. 2, 133-141, 1997.
-
(1997)
Production Planning and Control
, vol.8
, Issue.2
, pp. 133-141
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
7
-
-
0032122862
-
The effect of sudden material handling system breakdown on the performance of a JIT system
-
Gupta S. M. and Al-Turki Y. A. Y., The Effect of Sudden Material Handling System Breakdown on the Performance of a JIT System, International Journal of Production Research, Vol. 36, No. 7, 1935-1960, 1998.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.7
, pp. 1935-1960
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
8
-
-
3543124095
-
Flexible kanban system
-
Gupta S. M., Al-Turki Y. A. Y. and Perry R. F., Flexible Kanban System, International Journal of Operations and Production Management, Vol. 19, No. 10, 1065-1093, 1999.
-
(1999)
International Journal of Operations and Production Management
, vol.19
, Issue.10
, pp. 1065-1093
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
Perry, R.F.3
-
11
-
-
0004177242
-
-
WCB, McGraw-Hill, New York
-
Kelton D. W., Sadowski R. P. and Sadowski, D. A., Simulation with Arena®, WCB, McGraw-Hill, New York, 1998.
-
(1998)
Simulation with Arena®
-
-
Kelton, D.W.1
Sadowski, R.P.2
Sadowski, D.A.3
-
12
-
-
0035766557
-
Adaptive kanban control mechanism for a single stage hybrid system
-
Newton, Massachusetts, October 28-29
-
Korugan, A. and Gupta, S. M., Adaptive Kanban Control Mechanism for a Single Stage Hybrid System, Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing II, Newton, Massachusetts, October 28-29, pp. 175-182, 2001.
-
(2001)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing II
, pp. 175-182
-
-
Korugan, A.1
Gupta, S.M.2
-
13
-
-
0038156629
-
Disassembly sequencing: A survey
-
Lambert A. J. D., Disassembly Sequencing: A Survey, International Journal of Production Research, Vol. 41, No. 16, 3721-3759, 2003.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.16
, pp. 3721-3759
-
-
Lambert, A.J.D.1
-
14
-
-
29344464281
-
-
Boca Raton, Florida, CRC Press
-
Lambert, A. J. D. and Gupta, S. M., Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling, Boca Raton, Florida, CRC Press, 2005.
-
(2005)
Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
15
-
-
0242492016
-
Greedy algorithm for disassembly line scheduling
-
Washington, DC, October 5-8
-
McGovern S. M. and Gupta S. M., Greedy Algorithm for Disassembly Line Scheduling, Proceedings of the 2003 IEEE International Conference on Systems, Man, and Cybernetics, Washington, DC, October 5-8, pp. 1737-1744, 2003.
-
(2003)
Proceedings of the 2003 IEEE International Conference on Systems, Man, and Cybernetics
, pp. 1737-1744
-
-
McGovern, S.M.1
Gupta, S.M.2
-
16
-
-
0034828875
-
A systematic approach to disassembly line design
-
Denver, Colorado, May 7-9
-
Tang Y., Zhou M. and Caudill R., A Systematic Approach to Disassembly Line Design, Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment, Denver, Colorado, May 7-9, pp. 173-178, 2001.
-
(2001)
Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment
, pp. 173-178
-
-
Tang, Y.1
Zhou, M.2
Caudill, R.3
-
17
-
-
2142641854
-
Multi-kanban model for disassembly line with demand fluctuation
-
Udomsawat, G., Gupta, S. M. and Al-Turki, Y.A.Y., Multi-Kanban Model for Disassembly Line with Demand Fluctuation, Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III, Vol. 5262, pp. 85-93, 2003.
-
(2003)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III
, vol.5262
, pp. 85-93
-
-
Udomsawat, G.1
Gupta, S.M.2
Al-Turki, Y.A.Y.3
|