-
1
-
-
21844513640
-
Operations Planning Issues in an Assembly/Disassembly Environment
-
Brennan L., Gupta S. M. and Taleb K. N., "Operations Planning Issues in an Assembly/Disassembly Environment", International Journal of Operations and Production Management, Vol. 14, No. 9, 57-67, 1994.
-
(1994)
International Journal of Operations and Production Management
, vol.14
, Issue.9
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
2
-
-
0035837942
-
A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures
-
Gungor A. and Gupta S. M., "A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures", International Journal of Production Research, Vol. 39, No. 7,1427-1467, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
3
-
-
0037143030
-
Disassembly Line in Product Recovery
-
Gungor A. and Gupta S. M., "Disassembly Line in Product Recovery", International Journal of Production Research, Vol. 40, No. 11, 2569-2589, 2002.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.11
, pp. 2569-2589
-
-
Gungor, A.1
Gupta, S.M.2
-
4
-
-
0033358107
-
Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey
-
Gungor A. and Gupta S. M., "Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey", Computer and Industrial Engineering, Vol. 36, No. 4, 811-853, 1999.
-
(1999)
Computer and Industrial Engineering
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
5
-
-
0032089489
-
Adapting Just-In-Time Manufacturing Systems to Preventive Maintenance Interrupts
-
Gupta S. M. and Al-Turki Y. A. Y., "Adapting Just-In-Time Manufacturing Systems to Preventive Maintenance Interrupts". Production Planning and Control, Vol. 9, No. 4, 349-359, 1998.
-
(1998)
Production Planning and Control
, vol.9
, Issue.4
, pp. 349-359
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
6
-
-
0031103287
-
An Algorithm to Dynamically Adjust the Number of Kanbans in a Stochastic Processing Times and Variable Demand Environment
-
Gupta S. M. and Al-Turki Y. A. Y., "An Algorithm to Dynamically Adjust the Number of Kanbans in a Stochastic Processing Times and Variable Demand Environment", Production Planning and Control, Vol. 8, No. 2, 133-141, 1997.
-
(1997)
Production Planning and Control
, vol.8
, Issue.2
, pp. 133-141
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
7
-
-
0032122862
-
The Effect of Sudden Material Handling System Breakdown on the Performance of a JIT System
-
Gupta S. M. and Al-Turki Y. A. Y., "The Effect of Sudden Material Handling System Breakdown on the Performance of a JIT System", International Journal of Production Research, Vol. 36, No. 7, 1935-1960, 1998.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.7
, pp. 1935-1960
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
8
-
-
3543124095
-
Flexible Kanban System
-
Gupta S. M., Al-Turki Y. A. Y. and Perry R. F., "Flexible Kanban System", International Journal of Operations and Production Management, Vol. 19, No. 10, 1065-1093,1999.
-
(1999)
International Journal of Operations and Production Management
, vol.19
, Issue.10
, pp. 1065-1093
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
Perry, R.F.3
-
11
-
-
0004177242
-
-
WCB, McGraw-Hill, New York
-
Kelton D. W., Sadowski R. P. and Sadowski, D. A., "Simulation with Arena®", WCB, McGraw-Hill, New York, 1998.
-
(1998)
Simulation with Arena®
-
-
Kelton, D.W.1
Sadowski, R.P.2
Sadowski, D.A.3
-
12
-
-
0035766557
-
Adaptive Kanban Control Mechanism for a Single Stage Hybrid System
-
Newton, Massachusetts, October 28-29
-
Korugan, A. and Gupta, S. M., "Adaptive Kanban Control Mechanism for a Single Stage Hybrid System", Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing II, Newton, Massachusetts, October 28-29, pp. 175-182, 2001.
-
(2001)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing II
, pp. 175-182
-
-
Korugan, A.1
Gupta, S.M.2
-
13
-
-
0038156629
-
Disassembly Sequencing: A Survey
-
Lambert A. J. D., "Disassembly Sequencing: A Survey", International Journal of Production Research, Vol. 41, No. 16, 3721-3759, 2003.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.16
, pp. 3721-3759
-
-
Lambert, A.J.D.1
-
14
-
-
0242492016
-
Greedy Algorithm for Disassembly Line Scheduling
-
Washington, DC, October 5-8
-
McGovern S. M. and Gupta S. M., "Greedy Algorithm for Disassembly Line Scheduling", Proceedings of the 2003 IEEE International Conference on Systems, Man, and Cybernetics, Washington, DC, October 5-8, pp. 1737- 1744, 2003.
-
(2003)
Proceedings of the 2003 IEEE International Conference on Systems, Man, and Cybernetics
, pp. 1737-1744
-
-
McGovern, S.M.1
Gupta, S.M.2
-
15
-
-
7044252312
-
Environmental Concerns and Recycling/Disassembly Efforts in the Electronics Industry
-
Moyer L. and Gupta S. M., "Environmental Concerns and Recycling/Disassembly Efforts in the Electronics Industry", Journal of Electronics Manufacturing, Vol. 7, No. 1, 1-22, 1997.
-
(1997)
Journal of Electronics Manufacturing
, vol.7
, Issue.1
, pp. 1-22
-
-
Moyer, L.1
Gupta, S.M.2
-
16
-
-
0034828875
-
A Systematic Approach to Disassembly Line Design
-
Denver, Colorado, May 7-9
-
Tang Y., Zhou M. and Caudill R., "A Systematic Approach to Disassembly Line Design", Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment, Denver, Colorado, May 7-9, pp. 173-178, 2001.
-
(2001)
Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment
, pp. 173-178
-
-
Tang, Y.1
Zhou, M.2
Caudill, R.3
|