메뉴 건너뛰기




Volumn 5262, Issue , 2004, Pages 85-93

Multi-Kanban Model for Disassembly Line with Demand Fluctuation

Author keywords

Disassembly; JIT; Kanban

Indexed keywords

DEMAND FLUCTUATION; DISASSEMBLY; ENVIRONMENTALLY CONCIOUS MANUFACTURING (ECM); KANBAN; KNANBAN ROUTING;

EID: 2142641854     PISSN: 0277786X     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1117/12.516202     Document Type: Conference Paper
Times cited : (10)

References (16)
  • 2
    • 0035837942 scopus 로고    scopus 로고
    • A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures
    • Gungor A. and Gupta S. M., "A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures", International Journal of Production Research, Vol. 39, No. 7,1427-1467, 2001.
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Gungor, A.1    Gupta, S.M.2
  • 4
    • 0033358107 scopus 로고    scopus 로고
    • Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey
    • Gungor A. and Gupta S. M., "Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey", Computer and Industrial Engineering, Vol. 36, No. 4, 811-853, 1999.
    • (1999) Computer and Industrial Engineering , vol.36 , Issue.4 , pp. 811-853
    • Gungor, A.1    Gupta, S.M.2
  • 5
    • 0032089489 scopus 로고    scopus 로고
    • Adapting Just-In-Time Manufacturing Systems to Preventive Maintenance Interrupts
    • Gupta S. M. and Al-Turki Y. A. Y., "Adapting Just-In-Time Manufacturing Systems to Preventive Maintenance Interrupts". Production Planning and Control, Vol. 9, No. 4, 349-359, 1998.
    • (1998) Production Planning and Control , vol.9 , Issue.4 , pp. 349-359
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 6
    • 0031103287 scopus 로고    scopus 로고
    • An Algorithm to Dynamically Adjust the Number of Kanbans in a Stochastic Processing Times and Variable Demand Environment
    • Gupta S. M. and Al-Turki Y. A. Y., "An Algorithm to Dynamically Adjust the Number of Kanbans in a Stochastic Processing Times and Variable Demand Environment", Production Planning and Control, Vol. 8, No. 2, 133-141, 1997.
    • (1997) Production Planning and Control , vol.8 , Issue.2 , pp. 133-141
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 7
    • 0032122862 scopus 로고    scopus 로고
    • The Effect of Sudden Material Handling System Breakdown on the Performance of a JIT System
    • Gupta S. M. and Al-Turki Y. A. Y., "The Effect of Sudden Material Handling System Breakdown on the Performance of a JIT System", International Journal of Production Research, Vol. 36, No. 7, 1935-1960, 1998.
    • (1998) International Journal of Production Research , vol.36 , Issue.7 , pp. 1935-1960
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 15
    • 7044252312 scopus 로고    scopus 로고
    • Environmental Concerns and Recycling/Disassembly Efforts in the Electronics Industry
    • Moyer L. and Gupta S. M., "Environmental Concerns and Recycling/Disassembly Efforts in the Electronics Industry", Journal of Electronics Manufacturing, Vol. 7, No. 1, 1-22, 1997.
    • (1997) Journal of Electronics Manufacturing , vol.7 , Issue.1 , pp. 1-22
    • Moyer, L.1    Gupta, S.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.