메뉴 건너뛰기




Volumn 53, Issue 1, 1997, Pages 101-116

Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system

Author keywords

Drum buffer rope; Priority dispatching rules; Recoverable manufacturing; Remanufacturing; Scheduling policies

Indexed keywords

COST EFFECTIVENESS; PROCESS CONTROL; PRODUCTION CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 0031556588     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(97)00097-2     Document Type: Article
Times cited : (64)

References (59)
  • 1
    • 0023418695 scopus 로고
    • Priority assignment procedures in a multi-level assembly job shops
    • Adam, N.R., Bertand, J., Surkis, J., 1987. Priority assignment procedures in a multi-level assembly job shops. IIE Trans. 19, 317-328.
    • (1987) IIE Trans. , vol.19 , pp. 317-328
    • Adam, N.R.1    Bertand, J.2    Surkis, J.3
  • 4
    • 0021899335 scopus 로고
    • Priority rules for shop floor control in a material requirements planning system under various levels of capacity
    • Biggs, J.R., 1985. Priority rules for shop floor control in a material requirements planning system under various levels of capacity. Int. J. Prod. Res. 23, 33-46.
    • (1985) Int. J. Prod. Res. , vol.23 , pp. 33-46
    • Biggs, J.R.1
  • 6
    • 0028403388 scopus 로고
    • A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
    • Cook, D.P., 1994. A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod. Inv. Mgmt. J. 35, 73-78.
    • (1994) Prod. Inv. Mgmt. J. , vol.35 , pp. 73-78
    • Cook, D.P.1
  • 7
    • 0020393745 scopus 로고
    • Job shop scheduling - A systematic approach
    • Dar-El, E.M., Wysk, R.A., 1982. Job shop scheduling - a systematic approach. J. Manufacturing Systems 1, 77-88.
    • (1982) J. Manufacturing Systems , vol.1 , pp. 77-88
    • Dar-El, E.M.1    Wysk, R.A.2
  • 8
    • 0029356018 scopus 로고
    • Disassembly and recycling of electronic consumer products: An overview
    • de Ron, A., Penev, K., 1995. Disassembly and recycling of electronic consumer products: an overview. Technovation 15, 363-374.
    • (1995) Technovation , vol.15 , pp. 363-374
    • De Ron, A.1    Penev, K.2
  • 12
    • 0039645194 scopus 로고
    • On the logistics aspects of integrating procurement, production and recycling by lean and agilewise manufacturing companies
    • Aachen, Germany
    • Flapper, S.D.P., 1994. On the logistics aspects of integrating procurement, production and recycling by lean and agilewise manufacturing companies. Int. Dedication Conf. on Lean/Agile Manufacturing in the Automotive Industry, Aachen, Germany, pp. 749-756.
    • (1994) Int. Dedication Conf. on Lean/agile Manufacturing in the Automotive Industry , pp. 749-756
    • Flapper, S.D.P.1
  • 13
    • 0011778547 scopus 로고
    • On the operational logistics aspects of reuse
    • Nottingham, UK
    • Flapper, S.D.P., 1995. On the operational logistics aspects of reuse. Proc. 2nd Int. Symp. on Logistics, Nottingham, UK, pp. 343-348.
    • (1995) Proc. 2nd Int. Symp. on Logistics , pp. 343-348
    • Flapper, S.D.P.1
  • 14
    • 0024641735 scopus 로고
    • The effects of product structure and sequencing rule and assembly shop performance
    • Fry, T.D., Oliff, M.D., Minor, E.D., Leong, G.K., 1989. The effects of product structure and sequencing rule and assembly shop performance. Int. J. Prod. Res. 27, 671-686.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 671-686
    • Fry, T.D.1    Oliff, M.D.2    Minor, E.D.3    Leong, G.K.4
  • 15
    • 84989446840 scopus 로고
    • Operating policies for scheduling assembled products
    • Goodwin, J.S., Goodwin, Jr, J.C., 1982. Operating policies for scheduling assembled products. Dec. Sci. 13, 585-603.
    • (1982) Dec. Sci. , vol.13 , pp. 585-603
    • Goodwin, J.S.1    Goodwin J.C., Jr.2
  • 16
    • 0022681216 scopus 로고
    • Evaluating scheduling policies in a multi-level assembly system
    • Goodwin, J.S., Weeks, J.K., 1986. Evaluating scheduling policies in a multi-level assembly system. Int. J. Prod. Res. 24, 247-257.
    • (1986) Int. J. Prod. Res. , vol.24 , pp. 247-257
    • Goodwin, J.S.1    Weeks, J.K.2
  • 18
    • 0029371528 scopus 로고
    • A simulation model of drum-buffer-rope for production planning and control at a naval aviation depot
    • Guide, Jr., V.D.R., 1995. A simulation model of drum-buffer-rope for production planning and control at a naval aviation depot. Simulation 65, 157-168.
    • (1995) Simulation , vol.65 , pp. 157-168
    • Guide V.D.R., Jr.1
  • 19
    • 0030129785 scopus 로고    scopus 로고
    • Scheduling using drum-buffer-rope in a remanufacturing environment
    • Guide, Jr., V.D.R., 1996. Scheduling using drum-buffer-rope in a remanufacturing environment. Int. J. Prod. Res. 34, 1081-1091.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 1081-1091
    • Guide V.D.R., Jr.1
  • 20
    • 0029370747 scopus 로고
    • Implementation of drum-buffer-rope at a military rework depot engine works
    • Guide, Jr., V.D.R., Ghiselli, G., 1995. Implementation of drum-buffer-rope at a military rework depot engine works. Prod. Inv. Mgmt. J. 36, 79-83.
    • (1995) Prod. Inv. Mgmt. J. , vol.36 , pp. 79-83
    • Guide V.D.R., Jr.1    Ghiselli, G.2
  • 21
    • 0030736226 scopus 로고    scopus 로고
    • An evaluation of order release strategies in a remanufacturing environment
    • Guide, Jr., V.D.R., Srivastava, R., 1997. An evaluation of order release strategies in a remanufacturing environment. Comput. Oper. Res. 24, 37-47.
    • (1997) Comput. Oper. Res. , vol.24 , pp. 37-47
    • Guide V.D.R., Jr.1    Srivastava, R.2
  • 23
    • 0030871134 scopus 로고    scopus 로고
    • An evaluation of capacity planning techniques in a remanufacturing environment
    • Guide, Jr. V.D.R., Srivastava, R., Spencer, M.S., 1997b. An evaluation of capacity planning techniques in a remanufacturing environment. Int. J. Prod. Res. 35, 67-82.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 67-82
    • Guide V.D.R., Jr.1    Srivastava, R.2    Spencer, M.S.3
  • 25
    • 0021424669 scopus 로고
    • A comparative study of priority dispatching rules in a hybrid assembly/job shop
    • Huang, P.Y., 1984. A comparative study of priority dispatching rules in a hybrid assembly/job shop. Int. J. Prod. Res. 22, 375-387.
    • (1984) Int. J. Prod. Res. , vol.22 , pp. 375-387
    • Huang, P.Y.1
  • 26
    • 84952519001 scopus 로고
    • Planning product disassembly for material recovery opportunities
    • Johnson, M.R., Wang, M.H., 1995. Planning product disassembly for material recovery opportunities. Int. J. Prod. Res. 33, 3119-3142.
    • (1995) Int. J. Prod. Res. , vol.33 , pp. 3119-3142
    • Johnson, M.R.1    Wang, M.H.2
  • 29
    • 0011725222 scopus 로고
    • Core obsolescence forecasting in remanufacturing
    • Krupp, J., 1992. Core obsolescence forecasting in remanufacturing. Prod. Inv. Mgmt. J. 33, 12-17.
    • (1992) Prod. Inv. Mgmt. J. , vol.33 , pp. 12-17
    • Krupp, J.1
  • 30
    • 0027908820 scopus 로고
    • Structuring bills of material for automotive remanufacturing
    • Krupp, J., 1993. Structuring bills of material for automotive remanufacturing. Prod. Inv. Mgmt. J. 34, 46-52.
    • (1993) Prod. Inv. Mgmt. J. , vol.34 , pp. 46-52
    • Krupp, J.1
  • 31
    • 0028330626 scopus 로고
    • A simulation study of unit exchange spares management of diesel locomotives in the Indian railways
    • Kumar, N., Vrat, P., Sushil, 1994. A simulation study of unit exchange spares management of diesel locomotives in the Indian railways. Int. J. Prod. Econom. 33, 225-236.
    • (1994) Int. J. Prod. Econom. , vol.33 , pp. 225-236
    • Kumar, N.1    Vrat, P.2    Sushil3
  • 32
    • 0002636447 scopus 로고
    • Buffer stock allocation in serial and assembly type of production lines
    • Lambrecht, M., Segaert, A., 1990. Buffer stock allocation in serial and assembly type of production lines. Int. J. Oper. Prod. Mgmt. 10, 47-61.
    • (1990) Int. J. Oper. Prod. Mgmt. , vol.10 , pp. 47-61
    • Lambrecht, M.1    Segaert, A.2
  • 35
    • 0021370421 scopus 로고
    • Remanufacturing
    • Lund, R., 1984. Remanufacturing. Technol. Rev. 87, 18-23.
    • (1984) Technol. Rev. , vol.87 , pp. 18-23
    • Lund, R.1
  • 37
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W.L., Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Res. Logisti Quart. 15, 241-254.
    • (1968) Naval Res. Logisti Quart. , vol.15 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2
  • 39
    • 0024142713 scopus 로고
    • MRPII for repair/refurbish industries
    • Panisset, B., 1989. MRPII for repair/refurbish industries. Prod. Inv. Mgmt. J. 29, 12-15.
    • (1989) Prod. Inv. Mgmt. J. , vol.29 , pp. 12-15
    • Panisset, B.1
  • 40
    • 0030085256 scopus 로고    scopus 로고
    • Determination of a disassembly strategy
    • Penev, K., de Ron, A., 1996. Determination of a disassembly strategy. Int. J. Prod. Res. 34, 495-506.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 495-506
    • Penev, K.1    De Ron, A.2
  • 41
    • 38249004133 scopus 로고
    • Sequencing rules, progress milestones and product structure in a multi-stage job shop
    • Phillipoom, P.R., Markland, R.E., Fry, T.D., 1989. Sequencing rules, progress milestones and product structure in a multi-stage job shop. J. Oper. Mgmt. 8, 209-228.
    • (1989) J. Oper. Mgmt. , vol.8 , pp. 209-228
    • Phillipoom, P.R.1    Markland, R.E.2    Fry, T.D.3
  • 42
    • 0030572943 scopus 로고    scopus 로고
    • The EOQ repair and waste disposal model with variable setup numbers
    • Richter, K., 1996a. The EOQ repair and waste disposal model with variable setup numbers. Eur. J. Oper. Res. 96, 313-324.
    • (1996) Eur. J. Oper. Res. , vol.96 , pp. 313-324
    • Richter, K.1
  • 43
    • 0030206702 scopus 로고    scopus 로고
    • The extended EOQ repair and waste disposal model
    • Richter, K., 1996b. The extended EOQ repair and waste disposal model. Int. J. Prod. Econom. 45, 443-447.
    • (1996) Int. J. Prod. Econom. , vol.45 , pp. 443-447
    • Richter, K.1
  • 44
    • 84985747359 scopus 로고
    • An evaluation of sequencing rules for an assembly shop
    • Russell, R.S., Taylor III, B.W., 1985a. An evaluation of sequencing rules for an assembly shop. Dec. Sci. 16, 196-212.
    • (1985) Dec. Sci. , vol.16 , pp. 196-212
    • Russell, R.S.1    Taylor B.W. III2
  • 45
    • 0022130137 scopus 로고
    • An evaluation of sequencing rules in a dual constrained assembly shop
    • Russell, R.S., Taylor III, B.W., 1985b. An evaluation of sequencing rules in a dual constrained assembly shop. IIE Trans. 17, 219-232.
    • (1985) IIE Trans. , vol.17 , pp. 219-232
    • Russell, R.S.1    Taylor B.W. III2
  • 47
  • 48
    • 0011727186 scopus 로고
    • Priority dispatching rules in job shops with assembly operations and random delays
    • Sculli, D., 1980. Priority dispatching rules in job shops with assembly operations and random delays. Omega, 8, 227-234.
    • (1980) Omega , vol.8 , pp. 227-234
    • Sculli, D.1
  • 49
    • 38149145323 scopus 로고
    • Priority dispatching rules in an assembly shop
    • Sculli, D., 1987. Priority dispatching rules in an assembly shop. Omega 15, 49-57.
    • (1987) Omega , vol.15 , pp. 49-57
    • Sculli, D.1
  • 50
    • 0025235188 scopus 로고
    • Priority dispatching rules in a fabrication/assembly shop
    • Sculli, D., Tsang, K., 1990. Priority dispatching rules in a fabrication/assembly shop. Math. Comput. Modeling 13, 73-79.
    • (1990) Math. Comput. Modeling , vol.13 , pp. 73-79
    • Sculli, D.1    Tsang, K.2
  • 51
    • 0042498352 scopus 로고
    • Performance analysis and capacity planing of a landing gear shop
    • Srikar, B., Vinod, B., 1989. Performance analysis and capacity planing of a landing gear shop. Interfaces 19, 52-60.
    • (1989) Interfaces , vol.19 , pp. 52-60
    • Srikar, B.1    Vinod, B.2
  • 55
    • 0030205950 scopus 로고    scopus 로고
    • Production remanufacturing and disposal: A numerical comparison of alternative control strategies
    • van der Laan, E., Salomon, M., Dekker, R., 1996. Production remanufacturing and disposal: A numerical comparison of alternative control strategies. Int. J. Prod. Econom. 45, 489-498..
    • (1996) Int. J. Prod. Econom. , vol.45 , pp. 489-498
    • Van Der Laan, E.1    Salomon, M.2    Dekker, R.3
  • 56
    • 0037819554 scopus 로고
    • Corporate challenge for an age of recomsumption
    • Vandermerwe, S., Oliff, M., 1991. Corporate challenge for an age of recomsumption. The Columbia J. World Bus. 27, 7-25.
    • (1991) The Columbia J. World Bus. , vol.27 , pp. 7-25
    • Vandermerwe, S.1    Oliff, M.2
  • 58
    • 4444329378 scopus 로고
    • Application of optimized production technology in a capacity constrained flow shop: A case study in a battery factory
    • Yenradee, P., 1994. Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory. Comput. Indust. Eng. 27, 217-220.
    • (1994) Comput. Indust. Eng. , vol.27 , pp. 217-220
    • Yenradee, P.1
  • 59
    • 0028530072 scopus 로고
    • Simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing
    • Wu, S., Morris, J., Gordon, T.A., 1994. Simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing. Comput. Indust. Eng. 26, 757-764.
    • (1994) Comput. Indust. Eng. , vol.26 , pp. 757-764
    • Wu, S.1    Morris, J.2    Gordon, T.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.