-
1
-
-
0003075019
-
Optimal two- and three-stage production schedules with setup times included
-
Johnson, S. M., Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1954, 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
2
-
-
0001551888
-
Sequencing n jobs on two machines with arbitrary time lags
-
Mitten, L. G., Sequencing n jobs on two machines with arbitrary time lags. Management Science, 1959, 5, 293-298.
-
(1959)
Management Science
, vol.5
, pp. 293-298
-
-
Mitten, L.G.1
-
3
-
-
0018520161
-
Optimal two-stage production scheduling with setup times separated
-
Yoshida, T. and Hitomi, K., Optimal two-stage production scheduling with setup times separated. AIIE Transactions, 1979, 11, 261-263.
-
(1979)
AIIE Transactions
, vol.11
, pp. 261-263
-
-
Yoshida, T.1
Hitomi, K.2
-
4
-
-
0020816005
-
Sequency on two and three machines with setup, processing and removal times separated
-
Sule, D. R. and Huang, K. Y., Sequency on two and three machines with setup, processing and removal times separated. International Journal of Production Research, 1983, 21, 723-732.
-
(1983)
International Journal of Production Research
, vol.21
, pp. 723-732
-
-
Sule, D.R.1
Huang, K.Y.2
-
5
-
-
21844508729
-
Lot streaming in the two-machine flow shop with setup times
-
Baker, K. R., Lot streaming in the two-machine flow shop with setup times. Annals of Operations Research, 1995, 57, 1-11.
-
(1995)
Annals of Operations Research
, vol.57
, pp. 1-11
-
-
Baker, K.R.1
-
6
-
-
0000399972
-
Unit sized transfer batch scheduling with setup times
-
Cetinkaya, F. C. and Kayaligil, M. S., Unit sized transfer batch scheduling with setup times. Computers and Industrial Engineering, 1992, 22, 177-183.
-
(1992)
Computers and Industrial Engineering
, vol.22
, pp. 177-183
-
-
Cetinkaya, F.C.1
Kayaligil, M.S.2
-
8
-
-
0026896286
-
Two- and three-machine flow shop scheduling problems with equal sized transfer batches
-
Vickson, R. G. and Alfredsson, B. E., Two- and three-machine flow shop scheduling problems with equal sized transfer batches. International Journal of Production Research, 1992, 30, 1551-1574.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1551-1574
-
-
Vickson, R.G.1
Alfredsson, B.E.2
-
9
-
-
0030149222
-
A computational study of heuristics for two-stage flexible flowshops
-
Guinet, A., Solomon, M. M., Kedia, P. K. and Dussauchoy, A., A computational study of heuristics for two-stage flexible flowshops. International Journal of Production Research, 1996, 34, 1399-1415.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1399-1415
-
-
Guinet, A.1
Solomon, M.M.2
Kedia, P.K.3
Dussauchoy, A.4
-
10
-
-
0000611941
-
Basic techniques for lot streaming
-
Trietsch, D. and Baker, K. R., Basic techniques for lot streaming. Operations Research, 1993, 41, 1065-1076.
-
(1993)
Operations Research
, vol.41
, pp. 1065-1076
-
-
Trietsch, D.1
Baker, K.R.2
-
11
-
-
0001658657
-
Note on the optimality of sub-batch sizes for a multi-stage EPQ model-A Rejoinder
-
Szendrovits, A. Z., Note on the optimality of sub-batch sizes for a multi-stage EPQ model-A Rejoinder. Management Science, 1976, 23, 334-338.
-
(1976)
Management Science
, vol.23
, pp. 334-338
-
-
Szendrovits, A.Z.1
-
12
-
-
0026868840
-
Scheduling in ann-job, m-stage flowshop with parallel processors to minimize makespan
-
Rajendran, C. and Chaudhuri, D., Scheduling in ann-job, m-stage flowshop with parallel processors to minimize makespan. International Journal of Production Economics, 1992, 27, 137-143.
-
(1992)
International Journal of Production Economics
, vol.27
, pp. 137-143
-
-
Rajendran, C.1
Chaudhuri, D.2
-
13
-
-
0026819776
-
A multi-stage parallel processors flowshop problem with minimum flowtime
-
Rajendran, C. and Chaudhuri, D., A multi-stage parallel processors flowshop problem with minimum flowtime. European Journal of Operational Research, 1992, 57, 111-122.
-
(1992)
European Journal of Operational Research
, vol.57
, pp. 111-122
-
-
Rajendran, C.1
Chaudhuri, D.2
-
14
-
-
0022680737
-
Some no-wait shops scheduling problems: Complexity concept
-
Sriskandarajah, C. and Ladet, P., Some no-wait shops scheduling problems: complexity concept. European Journal of Operational Research, 1986, 24, 424-438.
-
(1986)
European Journal of Operational Research
, vol.24
, pp. 424-438
-
-
Sriskandarajah, C.1
Ladet, P.2
-
15
-
-
0024769054
-
Scheduling algorithms for flexible flowshops: Worst and average case performance
-
Sriskandarajah, C. and Sethi, S. P., Scheduling algorithms for flexible flowshops: worst and average case performance. European Journal of Operational Research, 1989, 43, 143-160.
-
(1989)
European Journal of Operational Research
, vol.43
, pp. 143-160
-
-
Sriskandarajah, C.1
Sethi, S.P.2
-
17
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flowlines
-
Wittrock, R. J., An adaptable scheduling algorithm for flexible flowlines. Operations Research, 1988, 36, 445-453.
-
(1988)
Operations Research
, vol.36
, pp. 445-453
-
-
Wittrock, R.J.1
|