메뉴 건너뛰기




Volumn 102, Issue 1, 1997, Pages 142-156

A hybrid two-stage flowshop with part family, batch production, major and minor set-ups

Author keywords

Heuristics; Hybrid flowshop; Lot production; Makespan; Part family

Indexed keywords

COMPUTATIONAL METHODS; HEURISTIC METHODS; INVENTORY CONTROL; PROBLEM SOLVING; PROCESS CONTROL; SCHEDULING;

EID: 0031248652     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(96)00213-5     Document Type: Article
Times cited : (49)

References (25)
  • 2
    • 0003901991 scopus 로고
    • Scheduling multiprocessor flow shops
    • D.-Z. Du and J. Sun (eds.), Kluwer Academic Publishers
    • Chen, B., (1994) "Scheduling multiprocessor flow shops", in: D.-Z. Du and J. Sun (eds.), New Advances in Optimization and Approximation, Kluwer Academic Publishers, 1-8.
    • (1994) New Advances in Optimization and Approximation , pp. 1-8
    • Chen, B.1
  • 3
    • 0029254603 scopus 로고
    • Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines atone stage
    • Chen, B., (1995), "Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines atone stage". Journal of Operational Research Society 46, 234-244.
    • (1995) Journal of Operational Research Society , vol.46 , pp. 234-244
    • Chen, B.1
  • 6
    • 0014477093 scopus 로고
    • Bounds on multiprocessing timing machines
    • Graham, R.L., 1969, "Bounds on multiprocessing timing machines", SIAM Journal of Applied Mathematics 17, 416-429.
    • (1969) SIAM Journal of Applied Mathematics , vol.17 , pp. 416-429
    • Graham, R.L.1
  • 8
    • 0026190509 scopus 로고
    • Scheduling for a two-stage hybrid flow-shop with parallel machines at the second stage
    • Gupta, J.N.D., and Tune, E.A. (1991), "Scheduling for a two-stage hybrid flow-shop with parallel machines at the second stage", International Journal of Production Research 29/7, 1489-1502.
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1489-1502
    • Gupta, J.N.D.1    Tune, E.A.2
  • 9
    • 0001326653 scopus 로고
    • Scheduling a two-stage hybrid flow-shop with separable setup and removal times
    • Gupta, J.N.D., and Tunc, E.A. (1994), "Scheduling a two-stage hybrid flow-shop with separable setup and removal times", European Journal of Operational Research 77, 415-428.
    • (1994) European Journal of Operational Research , vol.77 , pp. 415-428
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 11
    • 0028766172 scopus 로고
    • Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
    • Hunsucker, J.L., and Shah, J.R. (1994), "Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment", European Journal of Operational Research 72, 102-114.
    • (1994) European Journal of Operational Research , vol.72 , pp. 102-114
    • Hunsucker, J.L.1    Shah, J.R.2
  • 12
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • Johnson, S.M., 1954, "Optimal two-and three-stage production schedules with setup times included", Naval Research Logistics Quarterly 1, 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 13
    • 0023379505 scopus 로고
    • Interstage transportation planning in the deterministic flow shop environment
    • Langston, M.A. (1987), "Interstage transportation planning in the deterministic flow shop environment", Operations Research 35, 556-564.
    • (1987) Operations Research , vol.35 , pp. 556-564
    • Langston, M.A.1
  • 16
    • 84985846638 scopus 로고
    • Scheduling in a two-stage hybrid flow shop
    • Narasimhan, S.L., and Mangiameli, P.M. (1987), "Scheduling in a two-stage hybrid flow shop", Decision Sciences 18, 250-265.
    • (1987) Decision Sciences , vol.18 , pp. 250-265
    • Narasimhan, S.L.1    Mangiameli, P.M.2
  • 19
    • 0002434711 scopus 로고
    • A solution to a special case of flow shop scheduling problems
    • S.E. Elmaghraby (ed.), Springer-Verlag, New York
    • Salvador, M.S. (1973), "A solution to a special case of flow shop scheduling problems", in: S.E. Elmaghraby (ed.), Symposium of the Theory of Scheduling and Application, Springer-Verlag, New York, 83-91.
    • (1973) Symposium of the Theory of Scheduling and Application , pp. 83-91
    • Salvador, M.S.1
  • 22
    • 0020177876 scopus 로고
    • Sequencing n jobs on two machines with setup, processing and removal times separated
    • Sule, D.R. (1982), "Sequencing n jobs on two machines with setup, processing and removal times separated", Naval Research Logistics Quarterly 29\3, 517-519.
    • (1982) Naval Research Logistics Quarterly , vol.29 , Issue.3 , pp. 517-519
    • Sule, D.R.1
  • 23
    • 0023440155 scopus 로고
    • A Flow-shop with sequence-dependent additive setup times
    • Szwarc, W., and Gupta, J.N.D. (1987), "A Flow-shop with sequence-dependent additive setup times", Naval Research Logistics 34\5, 619-627.
    • (1987) Naval Research Logistics , vol.34 , Issue.5 , pp. 619-627
    • Szwarc, W.1    Gupta, J.N.D.2
  • 24
    • 0025699778 scopus 로고
    • Scheduling batches on parallel machines with major and minor set-ups
    • Tang, C. (1990), "Scheduling batches on parallel machines with major and minor set-ups", European Journal of Operational Research 46, 28-37.
    • (1990) European Journal of Operational Research , vol.46 , pp. 28-37
    • Tang, C.1
  • 25
    • 0024016313 scopus 로고
    • An adaptable scheduling algorithm for flexible flow lines
    • Wittrock, R.J. (1988), "An adaptable scheduling algorithm for flexible flow lines", Operations Research 36, 445-453.
    • (1988) Operations Research , vol.36 , pp. 445-453
    • Wittrock, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.