-
2
-
-
0003901991
-
Scheduling multiprocessor flow shops
-
D.-Z. Du and J. Sun (eds.), Kluwer Academic Publishers
-
Chen, B., (1994) "Scheduling multiprocessor flow shops", in: D.-Z. Du and J. Sun (eds.), New Advances in Optimization and Approximation, Kluwer Academic Publishers, 1-8.
-
(1994)
New Advances in Optimization and Approximation
, pp. 1-8
-
-
Chen, B.1
-
3
-
-
0029254603
-
Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines atone stage
-
Chen, B., (1995), "Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines atone stage". Journal of Operational Research Society 46, 234-244.
-
(1995)
Journal of Operational Research Society
, vol.46
, pp. 234-244
-
-
Chen, B.1
-
4
-
-
0003603813
-
-
Freeman, San Francisco, Calif.
-
Garey, M.R., and Johnson, D.S. (1979), Computers and Intractability: A Guide to the Theory of NP-Completeness, Freeman, San Francisco, Calif.
-
(1979)
Computers and Intractability: A Guide to the Theory of NP-completeness
-
-
Garey, M.R.1
Johnson, D.S.2
-
5
-
-
0004239125
-
-
North Holland, Amsterdam
-
Graves, S.C., Rinnooy Kan, A.H.G., and Zipkin, P.H. (1993), Logistics of Production and Inventory, North Holland, Amsterdam.
-
(1993)
Logistics of Production and Inventory
-
-
Graves, S.C.1
Rinnooy Kan, A.H.G.2
Zipkin, P.H.3
-
6
-
-
0014477093
-
Bounds on multiprocessing timing machines
-
Graham, R.L., 1969, "Bounds on multiprocessing timing machines", SIAM Journal of Applied Mathematics 17, 416-429.
-
(1969)
SIAM Journal of Applied Mathematics
, vol.17
, pp. 416-429
-
-
Graham, R.L.1
-
8
-
-
0026190509
-
Scheduling for a two-stage hybrid flow-shop with parallel machines at the second stage
-
Gupta, J.N.D., and Tune, E.A. (1991), "Scheduling for a two-stage hybrid flow-shop with parallel machines at the second stage", International Journal of Production Research 29/7, 1489-1502.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1489-1502
-
-
Gupta, J.N.D.1
Tune, E.A.2
-
9
-
-
0001326653
-
Scheduling a two-stage hybrid flow-shop with separable setup and removal times
-
Gupta, J.N.D., and Tunc, E.A. (1994), "Scheduling a two-stage hybrid flow-shop with separable setup and removal times", European Journal of Operational Research 77, 415-428.
-
(1994)
European Journal of Operational Research
, vol.77
, pp. 415-428
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
10
-
-
30244439109
-
Minimizing makespan in a multiprocessor flowshop is NP-hard
-
forthcoming
-
Hoogeveen, J.A., Lenstra, J.K., and Veltman, B., (1995) "Minimizing makespan in a multiprocessor flowshop is NP-hard", European Journal of Operational Research, forthcoming.
-
(1995)
European Journal of Operational Research
-
-
Hoogeveen, J.A.1
Lenstra, J.K.2
Veltman, B.3
-
11
-
-
0028766172
-
Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
-
Hunsucker, J.L., and Shah, J.R. (1994), "Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment", European Journal of Operational Research 72, 102-114.
-
(1994)
European Journal of Operational Research
, vol.72
, pp. 102-114
-
-
Hunsucker, J.L.1
Shah, J.R.2
-
12
-
-
0003075019
-
Optimal two-and three-stage production schedules with setup times included
-
Johnson, S.M., 1954, "Optimal two-and three-stage production schedules with setup times included", Naval Research Logistics Quarterly 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
13
-
-
0023379505
-
Interstage transportation planning in the deterministic flow shop environment
-
Langston, M.A. (1987), "Interstage transportation planning in the deterministic flow shop environment", Operations Research 35, 556-564.
-
(1987)
Operations Research
, vol.35
, pp. 556-564
-
-
Langston, M.A.1
-
15
-
-
85033114068
-
-
McGill University, Canada
-
Li, S. (1995), "Technical Report on A Hybrid Two-Stage Flowshop with Part Family, Batch Production, Major and Minor Set-ups", McGill University, Canada.
-
(1995)
Technical Report on A Hybrid Two-stage Flowshop with Part Family, Batch Production, Major and Minor Set-ups
-
-
Li, S.1
-
16
-
-
84985846638
-
Scheduling in a two-stage hybrid flow shop
-
Narasimhan, S.L., and Mangiameli, P.M. (1987), "Scheduling in a two-stage hybrid flow shop", Decision Sciences 18, 250-265.
-
(1987)
Decision Sciences
, vol.18
, pp. 250-265
-
-
Narasimhan, S.L.1
Mangiameli, P.M.2
-
17
-
-
0026117836
-
Flow-shop scheduling with set-up, processing and removal times separated
-
Proust, C., Gupta, J.N.D., and Deschamps, V. (1991), "Flow-shop scheduling with set-up, processing and removal times separated", International Journal of Production Research 29\3, 479-494.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.3
, pp. 479-494
-
-
Proust, C.1
Gupta, J.N.D.2
Deschamps, V.3
-
19
-
-
0002434711
-
A solution to a special case of flow shop scheduling problems
-
S.E. Elmaghraby (ed.), Springer-Verlag, New York
-
Salvador, M.S. (1973), "A solution to a special case of flow shop scheduling problems", in: S.E. Elmaghraby (ed.), Symposium of the Theory of Scheduling and Application, Springer-Verlag, New York, 83-91.
-
(1973)
Symposium of the Theory of Scheduling and Application
, pp. 83-91
-
-
Salvador, M.S.1
-
21
-
-
84952071818
-
Models and algorithms for a two-stage production process
-
Sherali, H.D., Sarin, S.C., and Kodialam, M.S. (1990), "Models and algorithms for a two-stage production process", Production Planning and Control 1/1, 27-39.
-
(1990)
Production Planning and Control
, vol.1
, Issue.1
, pp. 27-39
-
-
Sherali, H.D.1
Sarin, S.C.2
Kodialam, M.S.3
-
22
-
-
0020177876
-
Sequencing n jobs on two machines with setup, processing and removal times separated
-
Sule, D.R. (1982), "Sequencing n jobs on two machines with setup, processing and removal times separated", Naval Research Logistics Quarterly 29\3, 517-519.
-
(1982)
Naval Research Logistics Quarterly
, vol.29
, Issue.3
, pp. 517-519
-
-
Sule, D.R.1
-
23
-
-
0023440155
-
A Flow-shop with sequence-dependent additive setup times
-
Szwarc, W., and Gupta, J.N.D. (1987), "A Flow-shop with sequence-dependent additive setup times", Naval Research Logistics 34\5, 619-627.
-
(1987)
Naval Research Logistics
, vol.34
, Issue.5
, pp. 619-627
-
-
Szwarc, W.1
Gupta, J.N.D.2
-
24
-
-
0025699778
-
Scheduling batches on parallel machines with major and minor set-ups
-
Tang, C. (1990), "Scheduling batches on parallel machines with major and minor set-ups", European Journal of Operational Research 46, 28-37.
-
(1990)
European Journal of Operational Research
, vol.46
, pp. 28-37
-
-
Tang, C.1
-
25
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock, R.J. (1988), "An adaptable scheduling algorithm for flexible flow lines", Operations Research 36, 445-453.
-
(1988)
Operations Research
, vol.36
, pp. 445-453
-
-
Wittrock, R.J.1
|