Volumn 49, Issue 9, 1998, Pages 1001-1006

Job lateness in flowshops with setup and removal times separated

Author keywords

Maximum lateness; Ordered flowshop; Removal time; Setup time; Two machine flowshop

Indexed keywords

CRITICAL PATH ANALYSIS; OPTIMIZATION; PERT; PROCESS CONTROL; SCHEDULING;

EID: 0032163754     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2600583     Document Type: Article
Times cited : (18)

References (18)
  • 1
    • 0003075019 scopus 로고
    • Optimal two and three-stage production schedules with setup times included
    • Johnson SM (1954). Optimal two and three-stage production schedules with setup times included. Naval Res Logist Q 1: 69-81.
    • (1954) Naval Res Logist Q , vol.1 , pp. 69-81
    • Johnson, S.M.1
  • 2
    • 0019899745 scopus 로고
    • Minimizing the expected makespan in stochastic flowshops
    • Pinedo M (1982). Minimizing the expected makespan in stochastic flowshops. Opns Res 30: 148-162.
    • (1982) Opns Res , vol.30 , pp. 148-162
    • Pinedo, M.1
  • 3
    • 0021585421 scopus 로고
    • Stochastically minimizing the makespan in flowshops
    • Foley RD and Suresh S (1984). Stochastically minimizing the makespan in flowshops. Naval Res Logist Q 31: 551-557.
    • (1984) Naval Res Logist Q , vol.31 , pp. 551-557
    • Foley, R.D.1    Suresh, S.2
  • 4
    • 0022569338 scopus 로고
    • On Johnson’s two-machine flowshop with random processing times
    • Ku PS and Niu SC (1986). On Johnson’s two-machine flowshop with random processing times. Op Res 34: 130-136.
    • (1986) Op Res , vol.34 , pp. 130-136
    • Ku, P.S.1    Niu, S.C.2
  • 5
    • 38149147609 scopus 로고
    • Two-machine ordered flowshop scheduling under random breakdowns
    • Allahverdi A and Mittenthal J (1994). Two-machine ordered flowshop scheduling under random breakdowns. Math Computer Modeling 20: 9-17.
    • (1994) Math Computer Modeling , vol.20 , pp. 9-17
    • Allahverdi, A.1    Mittenthal, J.2
  • 6
    • 0029632622 scopus 로고
    • Scheduling on a two- machine flowshop subject to random breakdowns with a makespan objective function
    • Allahverdi A and Mittenthal J (1995). Scheduling on a two- machine flowshop subject to random breakdowns with a makespan objective function. Eur J Opl Res 81: 376-387.
    • (1995) Eur J Opl Res , vol.81 , pp. 376-387
    • Allahverdi, A.1    Mittenthal, J.2
  • 7
    • 0018520161 scopus 로고
    • Optimal two-stage production scheduling with setup times separated
    • Yoshida T and Hitomi K (1979). Optimal two-stage production scheduling with setup times separated. AIIE Trans 11: 261-263.
    • (1979) AIIE Trans , vol.11 , pp. 261-263
    • Yoshida, T.1    Hitomi, K.2
  • 8
    • 0029343965 scopus 로고
    • Two-stage production scheduling with separated set-up times and stochastic breakdowns
    • Allahverdi A (1995). Two-stage production scheduling with separated set-up times and stochastic breakdowns. J Opl Res Soc 46: 896-904.
    • (1995) J Opl Res Soc , vol.46 , pp. 896-904
    • Allahverdi, A.1
  • 9
    • 0020177876 scopus 로고
    • Sequencing n jobs on two machines with setup, processing and removal times separated
    • Sule DR (1982). Sequencing n jobs on two machines with setup, processing and removal times separated. Naval Res Logist Q 29: 517-519.
    • (1982) Naval Res Logist Q , vol.29 , pp. 517-519
    • Sule, D.R.1
  • 10
    • 0020816005 scopus 로고
    • Sequencing on two and three machines with setup, processing and removal times separated
    • Sule DR and Huang KY (1983). Sequencing on two and three machines with setup, processing and removal times separated. Int J Prod Res 21: 723-73.
    • (1983) Int J Prod Res , vol.21 , pp. 723-773
    • Sule, D.R.1    Huang, K.Y.2
  • 11
    • 0023440155 scopus 로고
    • A flowshop with sequence- dependent additive setup times
    • Szwarc W and Gupta JND (1987). A flowshop with sequence- dependent additive setup times. Naval Res Logist 34: 619-627.
    • (1987) Naval Res Logist , vol.34 , pp. 619-627
    • Szwarc, W.1    Gupta, J.2
  • 12
    • 0001326653 scopus 로고
    • Scheduling a two-stage hybrid flowshop with separable setup and removal times
    • Gupta JND and Tunc EA (1994). Scheduling a two-stage hybrid flowshop with separable setup and removal times. EurJ Opl Res 77: 415-428.
    • (1994) Eurj Opl Res , vol.77 , pp. 415-428
    • Gupta, J.1    Tunc, E.A.2
  • 14
    • 0001537909 scopus 로고
    • On two-machine scheduling with release dates and due dates to minimize maximum lateness
    • Grabowski J (1980). On two-machine scheduling with release dates and due dates to minimize maximum lateness. Opsearch 17: 133-154.
    • (1980) Opsearch , vol.17 , pp. 133-154
    • Grabowski, J.1
  • 15
    • 2042534906 scopus 로고
    • Optimal policies for a deterministic two- machine semi-ordered flowshop with maximum lateness objective
    • Allahverdi A (1994). Optimal policies for a deterministic two- machine semi-ordered flowshop with maximum lateness objective. Trans Opl Res 6: 47-54.
    • (1994) Trans Opl Res , vol.6 , pp. 47-54
    • Allahverdi, A.1
  • 16
    • 0030270129 scopus 로고    scopus 로고
    • Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
    • Allahverdi A (1996). Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Comp & Op Res 23: 909-916.
    • (1996) Comp & Op Res , vol.23 , pp. 909-916
    • Allahverdi, A.1
  • 17
    • 0025824858 scopus 로고
    • Job lateness in a two-machine flowshop with setup times separated
    • Dileepan P and Sen T (1991). Job lateness in a two-machine flowshop with setup times separated. Comp & Opns Res 18: 549-556.
    • (1991) Comp & Opns Res , vol.18 , pp. 549-556
    • Dileepan, P.1    Sen, T.2
  • 18
    • 0025539911 scopus 로고
    • Multiobjective flow-shop scheduling
    • Daniels RL and Chambers RJ (1990). Multiobjective flow-shop scheduling. Naval Res Logist 37: 981-995.
    • (1990) Naval Res Logist , vol.37 , pp. 981-995
    • Daniels, R.L.1    Chambers, R.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.