-
1
-
-
0003075019
-
Optimal two and three-stage production schedules with setup times included
-
Johnson SM (1954). Optimal two and three-stage production schedules with setup times included. Naval Res Logist Q 1: 69-81.
-
(1954)
Naval Res Logist Q
, vol.1
, pp. 69-81
-
-
Johnson, S.M.1
-
2
-
-
0019899745
-
Minimizing the expected makespan in stochastic flowshops
-
Pinedo M (1982). Minimizing the expected makespan in stochastic flowshops. Opns Res 30: 148-162.
-
(1982)
Opns Res
, vol.30
, pp. 148-162
-
-
Pinedo, M.1
-
3
-
-
0021585421
-
Stochastically minimizing the makespan in flowshops
-
Foley RD and Suresh S (1984). Stochastically minimizing the makespan in flowshops. Naval Res Logist Q 31: 551-557.
-
(1984)
Naval Res Logist Q
, vol.31
, pp. 551-557
-
-
Foley, R.D.1
Suresh, S.2
-
4
-
-
0022569338
-
On Johnson’s two-machine flowshop with random processing times
-
Ku PS and Niu SC (1986). On Johnson’s two-machine flowshop with random processing times. Op Res 34: 130-136.
-
(1986)
Op Res
, vol.34
, pp. 130-136
-
-
Ku, P.S.1
Niu, S.C.2
-
5
-
-
38149147609
-
Two-machine ordered flowshop scheduling under random breakdowns
-
Allahverdi A and Mittenthal J (1994). Two-machine ordered flowshop scheduling under random breakdowns. Math Computer Modeling 20: 9-17.
-
(1994)
Math Computer Modeling
, vol.20
, pp. 9-17
-
-
Allahverdi, A.1
Mittenthal, J.2
-
6
-
-
0029632622
-
Scheduling on a two- machine flowshop subject to random breakdowns with a makespan objective function
-
Allahverdi A and Mittenthal J (1995). Scheduling on a two- machine flowshop subject to random breakdowns with a makespan objective function. Eur J Opl Res 81: 376-387.
-
(1995)
Eur J Opl Res
, vol.81
, pp. 376-387
-
-
Allahverdi, A.1
Mittenthal, J.2
-
7
-
-
0018520161
-
Optimal two-stage production scheduling with setup times separated
-
Yoshida T and Hitomi K (1979). Optimal two-stage production scheduling with setup times separated. AIIE Trans 11: 261-263.
-
(1979)
AIIE Trans
, vol.11
, pp. 261-263
-
-
Yoshida, T.1
Hitomi, K.2
-
8
-
-
0029343965
-
Two-stage production scheduling with separated set-up times and stochastic breakdowns
-
Allahverdi A (1995). Two-stage production scheduling with separated set-up times and stochastic breakdowns. J Opl Res Soc 46: 896-904.
-
(1995)
J Opl Res Soc
, vol.46
, pp. 896-904
-
-
Allahverdi, A.1
-
9
-
-
0020177876
-
Sequencing n jobs on two machines with setup, processing and removal times separated
-
Sule DR (1982). Sequencing n jobs on two machines with setup, processing and removal times separated. Naval Res Logist Q 29: 517-519.
-
(1982)
Naval Res Logist Q
, vol.29
, pp. 517-519
-
-
Sule, D.R.1
-
10
-
-
0020816005
-
Sequencing on two and three machines with setup, processing and removal times separated
-
Sule DR and Huang KY (1983). Sequencing on two and three machines with setup, processing and removal times separated. Int J Prod Res 21: 723-73.
-
(1983)
Int J Prod Res
, vol.21
, pp. 723-773
-
-
Sule, D.R.1
Huang, K.Y.2
-
11
-
-
0023440155
-
A flowshop with sequence- dependent additive setup times
-
Szwarc W and Gupta JND (1987). A flowshop with sequence- dependent additive setup times. Naval Res Logist 34: 619-627.
-
(1987)
Naval Res Logist
, vol.34
, pp. 619-627
-
-
Szwarc, W.1
Gupta, J.2
-
12
-
-
0001326653
-
Scheduling a two-stage hybrid flowshop with separable setup and removal times
-
Gupta JND and Tunc EA (1994). Scheduling a two-stage hybrid flowshop with separable setup and removal times. EurJ Opl Res 77: 415-428.
-
(1994)
Eurj Opl Res
, vol.77
, pp. 415-428
-
-
Gupta, J.1
Tunc, E.A.2
-
14
-
-
0001537909
-
On two-machine scheduling with release dates and due dates to minimize maximum lateness
-
Grabowski J (1980). On two-machine scheduling with release dates and due dates to minimize maximum lateness. Opsearch 17: 133-154.
-
(1980)
Opsearch
, vol.17
, pp. 133-154
-
-
Grabowski, J.1
-
15
-
-
2042534906
-
Optimal policies for a deterministic two- machine semi-ordered flowshop with maximum lateness objective
-
Allahverdi A (1994). Optimal policies for a deterministic two- machine semi-ordered flowshop with maximum lateness objective. Trans Opl Res 6: 47-54.
-
(1994)
Trans Opl Res
, vol.6
, pp. 47-54
-
-
Allahverdi, A.1
-
16
-
-
0030270129
-
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
-
Allahverdi A (1996). Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Comp & Op Res 23: 909-916.
-
(1996)
Comp & Op Res
, vol.23
, pp. 909-916
-
-
Allahverdi, A.1
-
17
-
-
0025824858
-
Job lateness in a two-machine flowshop with setup times separated
-
Dileepan P and Sen T (1991). Job lateness in a two-machine flowshop with setup times separated. Comp & Opns Res 18: 549-556.
-
(1991)
Comp & Opns Res
, vol.18
, pp. 549-556
-
-
Dileepan, P.1
Sen, T.2
-
18
-
-
0025539911
-
Multiobjective flow-shop scheduling
-
Daniels RL and Chambers RJ (1990). Multiobjective flow-shop scheduling. Naval Res Logist 37: 981-995.
-
(1990)
Naval Res Logist
, vol.37
, pp. 981-995
-
-
Daniels, R.L.1
Chambers, R.J.2
|