-
4
-
-
0030086424
-
Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems
-
Su Q, Chen FE. Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems. IEEE Transactions on Robotics and Automation 1996;12:22-30.
-
(1996)
IEEE Transactions on Robotics and Automation
, vol.12
, pp. 22-30
-
-
Su, Q.1
Chen, F.E.2
-
7
-
-
0001067461
-
Sequencing and scheduling: Algorithms and complexity
-
Nemhauser GL, Rinnooy Kan AHG (editors), Amsterdam: North-Holland
-
Lawler EL, Lenstra JK, Rinnooy Kan AHG, Shmoys DB. Sequencing and scheduling: Algorithms and complexity. In: Nemhauser GL, Rinnooy Kan AHG (editors), Logistics of Production and Inventory. Amsterdam: North-Holland, 1993.
-
(1993)
Logistics of Production and Inventory
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
8
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
Hall NG, Sriskandarajah C. A survey of machine scheduling problems with blocking and no-wait in process. Operations Ressearch 1996;44:510-24.
-
(1996)
Operations Ressearch
, vol.44
, pp. 510-524
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
9
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Crama Y, van de Klundert J. Cyclic scheduling of identical parts in a robotic cell. Operations Research 1997;45:952-6.
-
(1997)
Operations Research
, vol.45
, pp. 952-956
-
-
Crama, Y.1
Van De Klundert, J.2
-
11
-
-
0026124166
-
Automated two-machine flowshop scheduling: A solvable case
-
Kise H, Shioyama T, Ibaraki T. Automated two-machine flowshop scheduling: A solvable case. IIE Transactions 1991;23:10-6.
-
(1991)
IIE Transactions
, vol.23
, pp. 10-16
-
-
Kise, H.1
Shioyama, T.2
Ibaraki, T.3
-
12
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
Sethi SP, Sriskandarajah C, Sorger G, Blazewicz J, Kubiak W. Sequencing of parts and robot moves in a robotic cell. International Journal of Flexible Manufacturing Systems 1992;4:331-58.
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 331-358
-
-
Sethi, S.P.1
Sriskandarajah, C.2
Sorger, G.3
Blazewicz, J.4
Kubiak, W.5
-
13
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
Hall NG, Kamoun H, Sriskandarajah C. Scheduling in robotic cells: Classification, two and three machine cells. Operations Research 1997;45:421-39.
-
(1997)
Operations Research
, vol.45
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
15
-
-
0029491089
-
Flowshop scheduling of robotic cells with job-dependent transportation and set-up effects
-
Levner E, Kogan K, Maimon O. Flowshop scheduling of robotic cells with job-dependent transportation and set-up effects. Journal of the Operational Research Society 1995;46:1447-55.
-
(1995)
Journal of the Operational Research Society
, vol.46
, pp. 1447-1455
-
-
Levner, E.1
Kogan, K.2
Maimon, O.3
-
16
-
-
0030289711
-
Lot scheduling in a two-machine cell with swapping devices
-
Agnetis A, Pacciarelli D, Rossi F. Lot scheduling in a two-machine cell with swapping devices. IIE Transactions 1996;28:911-7.
-
(1996)
IIE Transactions
, vol.28
, pp. 911-917
-
-
Agnetis, A.1
Pacciarelli, D.2
Rossi, F.3
-
18
-
-
0001068310
-
Sequencing a one-state variable machine: A solvable case of the traveling salesman problem
-
Gilmore PC, Gomory RE. Sequencing a one-state variable machine: A solvable case of the traveling salesman problem. Operations Research 1964;12:655-79.
-
(1964)
Operations Research
, vol.12
, pp. 655-679
-
-
Gilmore, P.C.1
Gomory, R.E.2
|