-
2
-
-
1342330563
-
A study of the utilization of capacity constrained resources in drum-buffer-rope systems
-
ATWATER, J. B. and CHAKRAVORTY, S.S., 2002, A study of the utilization of capacity constrained resources in drum-buffer-rope systems. Prod. Oper. Manag., 11(2), 259-273.
-
(2002)
Prod. Oper. Manag.
, vol.11
, Issue.2
, pp. 259-273
-
-
Atwater, J.B.1
Chakravorty, S.S.2
-
3
-
-
0021496929
-
Sequencing rules and due-date assignment in a job shop
-
BAKER, K. R., 1984, Sequencing rules and due-date assignment in a job shop. Manag. Sci., 30(9), 1093-1104.
-
(1984)
Manag. Sci.
, vol.30
, Issue.9
, pp. 1093-1104
-
-
Baker, K.R.1
-
4
-
-
0023861277
-
Multiproduct queuing networks with deterministic routings: Decomposition approach and the notion of interference
-
BITRAN, G. R. and TIRUPATI, D., 1988, Multiproduct queuing networks with deterministic routings: decomposition approach and the notion of interference. Manag. Sci., 34(1), 75-100.
-
(1988)
Manag. Sci.
, vol.34
, Issue.1
, pp. 75-100
-
-
Bitran, G.R.1
Tirupati, D.2
-
5
-
-
0036610796
-
Designing unbalanced lines - Understanding protective capacity and protective inventory
-
BLACKSTONE, J. H. and COX, J. F., 2002, Designing unbalanced lines - understanding protective capacity and protective inventory. Prod. Plan. Contr., 13(4), 416-423.
-
(2002)
Prod. Plan. Contr.
, vol.13
, Issue.4
, pp. 416-423
-
-
Blackstone, J.H.1
Cox, J.F.2
-
6
-
-
0030555416
-
A comparative study of line design approaches for serial production systems
-
CHAKRAVORTY S. S. and ATWATER, J. B., 1996, A comparative study of line design approaches for serial production systems. Int. J. Oper. Prod. Manag., 16(6), 91-108.
-
(1996)
Int. J. Oper. Prod. Manag.
, vol.16
, Issue.6
, pp. 91-108
-
-
Chakravorty, S.S.1
Atwater, J.B.2
-
7
-
-
0041856910
-
Learning the theory of constraints with a simulation game
-
CHAKRAVORTY, S. S. and VERHOEVEN, P. R., 1996, Learning the theory of constraints with a simulation game. Simul. Gaming, 27, 223-237.
-
(1996)
Simul. Gaming
, vol.27
, pp. 223-237
-
-
Chakravorty, S.S.1
Verhoeven, P.R.2
-
8
-
-
0028403388
-
A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
-
COOK, D. P., 1994, A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod. Inv. Manag. J., 35(1), 73-78.
-
(1994)
Prod. Inv. Manag. J.
, vol.35
, Issue.1
, pp. 73-78
-
-
Cook, D.P.1
-
9
-
-
3843095912
-
The fundamental measures
-
GOLDRATT, E. M., 1988, The fundamental measures. Theory Constr. J., 1(3), 1-21.
-
(1988)
Theory Constr. J.
, vol.1
, Issue.3
, pp. 1-21
-
-
Goldratt, E.M.1
-
10
-
-
9944229316
-
The paradigm shift
-
GOLDRATT, E. M., 1990a, The paradigm shift. Theory Constr. J., 1(6), 1-21.
-
(1990)
Theory Constr. J.
, vol.1
, Issue.6
, pp. 1-21
-
-
Goldratt, E.M.1
-
12
-
-
9944225406
-
The unbalanced plant
-
GOLDRATT, E. M., 1981, The unbalanced plant, in Proceedings of the APICS 24th Annual International Conference, 1(3), 1-21.
-
(1981)
Proceedings of the APICS 24th Annual International Conference
, vol.1
, Issue.3
, pp. 1-21
-
-
Goldratt, E.M.1
-
13
-
-
0004244247
-
-
Croton-on-Hudson, NY: North River Press
-
GOLDRATT, E. M. and Cox, J., 1984, The Goal (Croton-on-Hudson, NY: North River Press).
-
(1984)
The Goal
-
-
Goldratt, E.M.1
Cox, J.2
-
14
-
-
0003710588
-
-
Croton-on-Hudson, NY: North River Press
-
GOLDRATT, E. M. and Fox, R., 1986, The Race (Croton-on-Hudson, NY: North River Press).
-
(1986)
The Race
-
-
Goldratt, E.M.1
Fox, R.2
-
15
-
-
0037051313
-
TOC based performance measures and five focusing steps in a job-shop manufacturing environment
-
GUPTA, M., Ko, H. and MIN, H., 2002, TOC based performance measures and five focusing steps in a job-shop manufacturing environment. Int. J. Prod. Res., 40, 907-930.
-
(2002)
Int. J. Prod. Res.
, vol.40
, pp. 907-930
-
-
Gupta, M.1
Ko, H.2
Min, H.3
-
17
-
-
0024142562
-
JIT and constraint theory: The issue of bottleneck management
-
LAMBRRCHT, M. R. and DECALUWE, L., 1988, JIT and constraint theory: the issue of bottleneck management. Prod. Inv. Manag. J., 29(3), 61-65.
-
(1988)
Prod. Inv. Manag. J.
, vol.29
, Issue.3
, pp. 61-65
-
-
Lambrrcht, M.R.1
Decaluwe, L.2
-
18
-
-
84987012876
-
Shifting production bottlenecks: Causes, cures, and conundrums
-
LAWRENCE, S. R. and Buss, A. H., 1994, Shifting production bottlenecks: causes, cures, and conundrums. Prod, Oper. Manag., 3(1), 21-37.
-
(1994)
Prod, Oper. Manag.
, vol.3
, Issue.1
, pp. 21-37
-
-
Lawrence, S.R.1
Buss, A.H.2
-
20
-
-
0032114853
-
A quantitative approach to estimate the size of the time buffer in the theory of constraints
-
RADOVILSKY, Z. D., 1997, A quantitative approach to estimate the size of the time buffer in the theory of constraints. Int. J. Prod. Econ., 55, 113-119.
-
(1997)
Int. J. Prod. Econ.
, vol.55
, pp. 113-119
-
-
Radovilsky, Z.D.1
-
21
-
-
0242301554
-
Improving a practical DBR buffering approach using workload control
-
RIEZBOS, J., KORTE, G. J. and LAND, M. J., 2003, Improving a practical DBR buffering approach using workload control. Int. J. Prod. Res., 41(4), 699-712.
-
(2003)
Int. J. Prod. Res.
, vol.41
, Issue.4
, pp. 699-712
-
-
Riezbos, J.1
Korte, G.J.2
Land, M.J.3
-
23
-
-
0026414517
-
Buffer management: A diagnostic tool for production control
-
SCHRAGENHEIM, E. and RONEN, B., 1991, Buffer management: a diagnostic tool for production control. Prod. Inv. Manag. J., Second Quarter, 46-55.
-
(1991)
Prod. Inv. Manag. J., Second Quarter
, pp. 46-55
-
-
Schragenheim, E.1
Ronen, B.2
-
24
-
-
0002673047
-
An exposition of multiple constraint scheduling as implemented in the goal system
-
Spring
-
SIMONS, J. and SIMPSON, W., 1997, An exposition of multiple constraint scheduling as implemented in the goal system (formerly disaster). Prod. Oper. Manag., Spring, 3-22.
-
(1997)
Prod. Oper. Manag.
, pp. 3-22
-
-
Simons, J.1
Simpson, W.2
-
25
-
-
0030241135
-
Formulation and solution of the drum-buffer-rope constraint scheduling problem
-
SIMONS, JR, J. V., SIMPSON III, W. P., CARLSON, B. J., JAMES, S. W., LETTIERH, C. A. and MEDIATE, B. A., 1996, Formulation and solution of the drum-buffer-rope constraint scheduling problem. Int. J. Prod. Res., 34(9), 2405-2420.
-
(1996)
Int. J. Prod. Res.
, vol.34
, Issue.9
, pp. 2405-2420
-
-
Simons Jr., J.V.1
Simpson III, W.P.2
Carlson, B.J.3
James, S.W.4
Lettierh, C.A.5
Mediate, B.A.6
-
26
-
-
0011718957
-
On the theory of constraints and the goal system
-
SPEARMAN, M. L., 1997, On the theory of constraints and the goal system. Prod. Oper. Manag., 6(1), 28-33.
-
(1997)
Prod. Oper. Manag.
, vol.6
, Issue.1
, pp. 28-33
-
-
Spearman, M.L.1
-
27
-
-
0004274964
-
-
APICS, Falls Church, VA
-
THE AMERICAN PRODUCTION AND INVENTORY CONTROLS SOCIETY, 1995. APICS Dictionary, 8th edn. (APICS, Falls Church, VA).
-
(1995)
APICS Dictionary, 8th Edn.
-
-
|