The shifting bottleneck procedure for job shop scheduling
-
Adams, J., Balas, E. and Zawack, D., 1988, The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391-401.
-
(1988)
Management Science
, vol.34
, Issue.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
3342905557
-
-
MS thesis, AFIT/GSM/LAS/93S-9, Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (All), Wright-Patterson AFB, OH
-
Carlson, B. J. and Lettiere, C. A., 1993, A comparison of the DISASTER™ scheduling software with a simultaneous scheduling algorithm for minimizing maximum tardiness in job shops. MS thesis, AFIT/GSM/LAS/93S-9, Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (All), Wright-Patterson AFB, OH.
-
(1993)
A Comparison of the DISASTER™ Scheduling Software with a Simultaneous Scheduling Algorithm for Minimizing Maximum Tardiness in Job Shops.
-
-
Carlson, B.J.1
Lettiere, C.A.2
-
4
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester, E. L. and Herroelen, W. S., 1992a, A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38(12), 1803-1818.
-
(1992)
Management Science
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
5
-
-
0002907360
-
-
Research Report N 9206, Department of Applied Economic Sciences, Katholieke Universiteit Leuven, Belgium
-
Demeulemeester, E. L. and Herroelen, W. S., 1992b, A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Research Report N 9206, Department of Applied Economic Sciences, Katholieke Universiteit Leuven, Belgium.
-
(1992)
A Branch-And-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem.
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
7
-
-
0039770263
-
An implicit enumeration algorithm for the machine sequencing problem
-
Florian, M., Trepant, P. and McMahon, G., 1971, An implicit enumeration algorithm for the machine sequencing problem. Management Science, 17, B782-B792.
-
(1971)
Management Science
, vol.17
, pp. B782-B792
-
-
Florian, M.1
Trepant, P.2
Mc Mahon, G.3
-
8
-
-
3342959354
-
An evaluation of resource constraint measures in a dual constrained job environment
-
San Francisco, CA: Decision Sciences Institute
-
Gargeya, V. B., 1992, An evaluation of resource constraint measures in a dual constrained job environment. Proceedings of the Annual Meeting of the Decision Sciences Institute, San Francisco, CA: Decision Sciences Institute, pp. 1538-1540.
-
(1992)
Proceedings of the Annual Meeting of the Decision Sciences Institute
, pp. 1538-1540
-
-
Gargeya, V.B.1
-
11
-
-
0348024594
-
-
Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (AU), Wright-Patterson AFB, OH
-
James, S. W. and Mediate, B. A., Jr., 1993, Benchmark production scheduling problems for job shops with interactive constraints. MS thesis, AF1T/GSM/LAS/93S-9. Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (AU), Wright-Patterson AFB, OH.
-
(1993)
Benchmark Production Scheduling Problems for Job Shops with Interactive Constraints. MS Thesis, AF1T/GSM/LAS/93S-9
-
-
James, S.W.1
Mediate, B.A.2
-
12
-
-
0026880669
-
Theory of constraints and linear programming: A comparison
-
Luebbe, R. and Finch, B., 1992, Theory of constraints and linear programming: a comparison. International Journal of Production Research, 30(6), 1471-1478.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.6
, pp. 1471-1478
-
-
Luebbe, R.1
Finch, B.2
-
13
-
-
0027912256
-
Optimizing theory of constraints when multiple constrained resources exist
-
Peenert, G., 1993, Optimizing theory of constraints when multiple constrained resources exist. European Journal of Operational Research, 70, 126-133.
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 126-133
-
-
Peenert, G.1
-
14
-
-
3343019519
-
Flow shop scheduling with multiple operations and time lags
-
Monk, Belgium
-
Riezebos, J., Gaalman, G. J. C. and Gupta, J. N. D., 1993, Flow shop scheduling with multiple operations and time lags. Proceedings of the FuCOM Conference, Monk, Belgium, 576-590.
-
(1993)
Proceedings of the Fucom Conference
, pp. 576-590
-
-
Riezebos, J.1
Gaalman, G.J.C.2
Gupta, J.N.D.3
-
15
-
-
85023518835
-
-
22 February, Personal communication
-
Rose, C, 22 February 1993, Personal communication.
-
(1993)
-
-
Rose, C.1
-
16
-
-
0025699540
-
Drum-buffer-rope shop floor control
-
Senragenheim, E. and Ronen, B., 1990, Drum-buffer-rope shop floor control. Production and Inventory Management Journal, Q3, 31, 18-23.
-
(1990)
Production and Inventory Management Journal
, vol.Q3
, Issue.31
, pp. 18-23
-
-
Senragenheim, E.1
Ronen, B.2
-
17
-
-
85033821589
-
-
Technical Memorandum, AF1T-LA-TM-95-1, Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (AU), Wright-Patterson AFB, OH
-
Simons, J. V., Jr. and Simpson, W. P., III., 1995, An explication and characterization of the Goal System (formerly DISASTER™) approach to multiple constraint scheduling for drum-bufler-rope (DBR) production management systems. Technical Memorandum, AF1T-LA-TM-95-1, Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology (AU), Wright-Patterson AFB, OH.
-
(1995)
An Explication and Characterization of the Goal System (Formerly DISASTER™) Approach to Multiple Constraint Scheduling for Drum-Bufler-Rope (DBR) Production Management Systems.
-
-
Simons, J.V.1
Simpson, W.P.2
|