메뉴 건너뛰기




Volumn 16, Issue 6, 1996, Pages 91-108

A comparative study of line design approaches for serial production systems

Author keywords

Assembly line balancing; Just in time; Production management; Production systems; Theory of constraints

Indexed keywords


EID: 0030555416     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443579610119117     Document Type: Review
Times cited : (33)

References (41)
  • 2
    • 0018509376 scopus 로고
    • On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times
    • Hillier, F.S. and Boling, R.W., "On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times", Management Science, Vol. 25 No. 8, August 1979, pp. 721-8.
    • (1979) Management Science , vol.25 , Issue.8 , pp. 721-8
    • Hillier, F.S.1    Boling, R.W.2
  • 3
    • 0024641336 scopus 로고
    • On the efficiency of unbalancing production lines
    • So, K.C., "On the efficiency of unbalancing production lines", International Journal of Production Research, Vol. 27 No. 4, April 1989, pp. 717-29.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 717-29
    • So, K.C.1
  • 6
    • 0042670526 scopus 로고
    • Markov processes occurring in the theory of traffic flow through an N-stage stochastic service system
    • Patterson, R.L., "Markov processes occurring in the theory of traffic flow through an N-stage stochastic service system", Journal of Industrial Engineering, Vol. 15 No. 4, July-August 1964, pp. 188-93.
    • (1964) Journal of Industrial Engineering , vol.15 , Issue.4 , pp. 188-93
    • Patterson, R.L.1
  • 7
    • 0009491781 scopus 로고
    • Pacing effects on manned assembly lines
    • Davis, L.E., "Pacing effects on manned assembly lines", International Journal of Production Research, Vol. 4 No. 3, March 1966, pp. 171-84.
    • (1966) International Journal of Production Research , vol.4 , Issue.3 , pp. 171-84
    • Davis, L.E.1
  • 8
    • 0001754984 scopus 로고
    • The effect of some design factors on the efficiency of production lines with variable operation times
    • Hillier, F.S. and Boling R.W., "The effect of some design factors on the efficiency of production lines with variable operation times", Journal of Industrial Engineering, Vol. 17 No. 12, December 1966, pp. 651-8.
    • (1966) Journal of Industrial Engineering , vol.17 , Issue.12 , pp. 651-8
    • Hillier, F.S.1    Boling, R.W.2
  • 9
    • 84952238341 scopus 로고
    • A note on the operating characteristics of 'balanced' and 'unbalanced' production flow lines
    • Payne, S.N., Slack N. and Wild, R., "A note on the operating characteristics of 'balanced' and 'unbalanced' production flow lines", International Journal of Production Research, Vol. 10 No. 1, 1972, pp. 93-8.
    • (1972) International Journal of Production Research , vol.10 , Issue.1 , pp. 93-8
    • Payne, S.N.1    Slack, N.2    Wild, R.3
  • 10
    • 0001562309 scopus 로고
    • Stochastic unpaced line design: Review and further experimental results
    • Smunt, T.L. and Perkins, W.C., "Stochastic unpaced line design: review and further experimental results", Journal of Operations Management, Vol. 5 No. 3, May 1985, pp. 351-73.
    • (1985) Journal of Operations Management , vol.5 , Issue.3 , pp. 351-73
    • Smunt, T.L.1    Perkins, W.C.2
  • 11
    • 38249026270 scopus 로고
    • Stochastic unpaced line design: A reply
    • Smunt, T.L. and Perkins, W.C., "Stochastic unpaced line design: a reply", Journal of Operations Management, Vol. 8 No. 1, January 1989, pp. 55-62.
    • (1989) Journal of Operations Management , vol.8 , Issue.1 , pp. 55-62
    • Smunt, T.L.1    Perkins, W.C.2
  • 12
    • 0043084774 scopus 로고
    • The efficiency of unbalancing production lines: An alternative interpretation
    • Smunt, T.L. and Perkins, W.C., "The efficiency of unbalancing production lines: an alternative interpretation", International Journal of Production Research, Vol. 28 No. 6, June 1989, pp. 1219-20.
    • (1989) International Journal of Production Research , vol.28 , Issue.6 , pp. 1219-20
    • Smunt, T.L.1    Perkins, W.C.2
  • 13
    • 0018297571 scopus 로고
    • The efficiency of balanced and unbalanced production lines
    • El-Rayah, T.E., "The efficiency of balanced and unbalanced production lines", International Journal of Production Research, Vol. 17 No. 1, 1979, pp. 61-76.
    • (1979) International Journal of Production Research , vol.17 , Issue.1 , pp. 61-76
    • El-Rayah, T.E.1
  • 14
    • 0043084775 scopus 로고
    • A note on 'stochastic unpaced line design: Review and further experimental results'
    • Karwan, K.R. and Philipoom, P.R., "A note on 'stochastic unpaced line design: review and further experimental results'", Journal of Operations Management, Vol. 8 No. 1, January 1989, pp. 48-54.
    • (1989) Journal of Operations Management , vol.8 , Issue.1 , pp. 48-54
    • Karwan, K.R.1    Philipoom, P.R.2
  • 15
    • 0004102424 scopus 로고
    • Dow Jones-Irwin Homewood, IL
    • Hall, R.W., Zero Inventories, Dow Jones-Irwin, Homewood, IL, 1983, pp. 120-35.
    • (1983) Zero Inventories , pp. 120-35
    • Hall, R.W.1
  • 16
    • 84985765951 scopus 로고
    • A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline, multistage production system: A comment
    • Monden, Y., "A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline, multistage production system: a comment", Decision Sciences, Vol. 15, 1984, pp. 445-7.
    • (1984) Decision Sciences , vol.15 , pp. 445-7
    • Monden, Y.1
  • 17
    • 3543090753 scopus 로고
    • Maximizing equipment effectiveness
    • Robinson, A. Productivity Press Cambridge, MA
    • Nakajima, S., "Maximizing equipment effectiveness", in Robinson, A. (Ed.), Continuous Improvement in Operations, Productivity Press, Cambridge, MA, 1991, pp. 307-31.
    • (1991) Continuous Improvement in Operations , pp. 307-31
    • Nakajima, S.1
  • 18
    • 0023167521 scopus 로고
    • Kanban, MRP, and shaping the manufacturing environment
    • Krajewski, L.J., King, B.E., Ritzman, L.P. and Wong, D.S., "Kanban, MRP, and shaping the manufacturing environment", Management Science, Vol. 33 No. 1, 1987, pp. 39-57.
    • (1987) Management Science , vol.33 , Issue.1 , pp. 39-57
    • Krajewski, L.J.1    King, B.E.2    Ritzman, L.P.3    Wong, D.S.4
  • 20
    • 0242328622 scopus 로고    scopus 로고
    • How the constraint theory improved a job shop operation
    • May 1988
    • Koziol, D.S., "How the constraint theory improved a job shop operation", Management Accounting, May 1988, pp. 44-9.
    • Management Accounting , pp. 44-9
    • Koziol, D.S.1
  • 21
    • 3543097853 scopus 로고    scopus 로고
    • Pricing strategy in the automotive glass industry
    • July 1989
    • Campbell, R.J., "Pricing strategy in the automotive glass industry", Management Accounting, July 1989, pp. 26-34.
    • Management Accounting , pp. 26-34
    • Campbell, R.J.1
  • 22
    • 0347826898 scopus 로고    scopus 로고
    • Measuring performance with synchronous management
    • February 1990
    • Lippa, V., "Measuring performance with synchronous management", Management Accounting, February 1990, pp. 54-9.
    • Management Accounting , pp. 54-9
    • Lippa, V.1
  • 23
    • 3543077877 scopus 로고    scopus 로고
    • Throughput with a capital 'T'
    • Sheridan, J.H., "Throughput with a capital 'T'", Industry Week, 4 March 1991, pp. 44-9.
    • Industry Week
    • Sheridan, J.H.1
  • 24
    • 3543060349 scopus 로고
    • Alkco lighting company and its journey to Goldratt's Goal
    • Andrews, C. and Becker, S.W., "Alkco lighting company and its journey to Goldratt's Goal", Total Quality Management, Vol. 3 No. 1, 1992, pp. 71-95.
    • (1992) Total Quality Management , vol.3 , Issue.1 , pp. 71-95
    • Andrews, C.1    Becker, S.W.2
  • 25
    • 3543100114 scopus 로고    scopus 로고
    • Stanley takes the team approach
    • January 1992
    • Plantz, B., "Stanley takes the team approach", Furniture Design and Manufacture, January 1992, pp. 30-37.
    • Furniture Design and Manufacture , pp. 30-37
    • Plantz, B.1
  • 27
    • 0026205378 scopus 로고
    • Using V-A-T analysis for determining the priority and location of JIT manufacturing techniques
    • Lockamy, A. and Cox, J.F., "Using V-A-T analysis for determining the priority and location of JIT manufacturing techniques", International Journal of Production Research, Vol. 29 No. 8, 1991, pp. 1661-72.
    • (1991) International Journal of Production Research , vol.29 , Issue.8 , pp. 1661-72
    • Lockamy, A.1    Cox, J.F.2
  • 28
    • 0002626852 scopus 로고    scopus 로고
    • Understanding and applying constraint management in today's manufacturing environments
    • Fawcett, S.E. and Pearson, J.N., "Understanding and applying constraint management in today's manufacturing environments", Productions and Inventory Management Journal, third quarter, 1991, pp. 46-55.
    • Productions and Inventory Management Journal
    • Fawcett, S.E.1    Pearson, J.N.2
  • 29
    • 0026880669 scopus 로고
    • Theory of Constraints and linear programming: A comparison
    • Luebbe, R. and Finch, B., "Theory of Constraints and linear programming: a comparison", International Journal of Production Research, Vol. 30 No. 6, 1992, pp. 1471-78.
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1471-78
    • Luebbe, R.1    Finch, B.2
  • 31
    • 0022775864 scopus 로고
    • The impact of service-time variability in a closed network of queues
    • Bondi, A.B. and Whitt, W., "The impact of service-time variability in a closed network of queues", Performance Evaluation, Vol. 6, 1986, pp. 219-34.
    • (1986) Performance Evaluation , vol.6 , pp. 219-34
    • Bondi, A.B.1    Whitt, W.2
  • 40
    • 0002112447 scopus 로고
    • The statistical analysis of simulation results
    • Lavenberg, S. Academic Press New York, NY
    • Welch, P.D., "The statistical analysis of simulation results", in Lavenberg, S. (Ed.), The Computer Performance Modeling Handbook, Academic Press, New York, NY, 1983, pp. 268-328.
    • (1983) The Computer Performance Modeling Handbook , pp. 268-328
    • Welch, P.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.