메뉴 건너뛰기




Volumn 108, Issue , 2017, Pages 1-17

Managing global sourcing with disruption risks in an assemble-to-order system

Author keywords

Assemble to order system; Disruption management; Flexible sourcing policy; Global sourcing; Inventory

Indexed keywords

ASSEMBLE TO ORDER; ASSEMBLE-TO-ORDER SYSTEM; COST RATIO; DISRUPTION MANAGEMENT; FLEXIBLE SOURCING POLICY; GLOBAL SOURCING; INVENTORY; LOCAL SUPPLIERS; ORDERING SYSTEM; OVERSEAS SUPPLIERS;

EID: 85042185868     PISSN: 13665545     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.tre.2017.09.009     Document Type: Article
Times cited : (23)

References (42)
  • 1
    • 85168420631 scopus 로고    scopus 로고
    • Accenture. Achieving high performance through procurement. Supply Chain Management Research Report.
    • Accenture, 2007. Achieving high performance through procurement. Supply Chain Management Research Report.
    • (2007)
  • 2
    • 85168418718 scopus 로고    scopus 로고
    • Accenture. Creating a more strategic procurement function. An interview with Yin Shaorong, Executive Director of Global Sourcing, Lenovo Group.
    • Accenture, 2013. Creating a more strategic procurement function. An interview with Yin Shaorong, Executive Director of Global Sourcing, Lenovo Group.
    • (2013)
  • 3
    • 85168424605 scopus 로고    scopus 로고
    • Supply disruption with a risk-averse buyer. Working paper, University of Chicago.
    • Adelman, D., Wang, S., 2013. Supply disruption with a risk-averse buyer. Working paper, University of Chicago.
    • (2013)
    • Adelman, D.1    Wang, S.2
  • 4
    • 85168415971 scopus 로고    scopus 로고
    • On the strategy of supply hubs for cost reduction and responsiveness. Technical report, Research Collection School of Information Systems.
    • Barnes, E., Dai, J., Deng, S., Down, D., Goh, M., LAU, H.C., Moosa, S., 2003. On the strategy of supply hubs for cost reduction and responsiveness. Technical report, Research Collection School of Information Systems.
    • (2003)
    • Barnes, E.1    Dai, J.2    Deng, S.3    Down, D.4    Goh, M.5    LAU, H.C.6    Moosa, S.7
  • 5
    • 85168410371 scopus 로고    scopus 로고
    • A bold new look for global sourcing
    • Basilio, R., Keith, H., A bold new look for global sourcing. Accenture, 2007.
    • (2007) Accenture
    • Basilio, R.1    Keith, H.2
  • 6
    • 33645801636 scopus 로고    scopus 로고
    • Matching Supply with Demand
    • third ed. McGraw-Hill Education
    • Cachon, G., Terwiesch, C., Matching Supply with Demand. third ed., 2012, McGraw-Hill Education.
    • (2012)
    • Cachon, G.1    Terwiesch, C.2
  • 7
    • 84991727611 scopus 로고    scopus 로고
    • Reliable design of an integrated supply chain with expedited shipments under disruption risks
    • Cui, J., Zhao, M., Li, X., Parsafard, M., An, S., Reliable design of an integrated supply chain with expedited shipments under disruption risks. Transp. Res. Part E: Logist. Transp. Rev. 95 (2016), 143–163.
    • (2016) Transp. Res. Part E: Logist. Transp. Rev. , vol.95 , pp. 143-163
    • Cui, J.1    Zhao, M.2    Li, X.3    Parsafard, M.4    An, S.5
  • 8
    • 84884154643 scopus 로고    scopus 로고
    • Inventory management for an assembly system subject to supply disruptions
    • DeCroix, G.A., Inventory management for an assembly system subject to supply disruptions. Manage. Sci. 59:9 (2013), 2079–2092.
    • (2013) Manage. Sci. , vol.59 , Issue.9 , pp. 2079-2092
    • DeCroix, G.A.1
  • 9
    • 61849122932 scopus 로고    scopus 로고
    • Component procurement strategies in decentralized assemble-to-order systems with time-dependent pricing
    • Fang, X., So, K.C., Wang, Y., Component procurement strategies in decentralized assemble-to-order systems with time-dependent pricing. Manage. Sci. 54:12 (2008), 1997–2011.
    • (2008) Manage. Sci. , vol.54 , Issue.12 , pp. 1997-2011
    • Fang, X.1    So, K.C.2    Wang, Y.3
  • 10
    • 33847070855 scopus 로고    scopus 로고
    • Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity
    • Fu, K., Hsu, V.N., Lee, C.-Y., Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity. Oper. Res. 54:6 (2006), 1137–1150.
    • (2006) Oper. Res. , vol.54 , Issue.6 , pp. 1137-1150
    • Fu, K.1    Hsu, V.N.2    Lee, C.-Y.3
  • 11
    • 67649982773 scopus 로고    scopus 로고
    • Note-optimal component acquisition for a single-product, single-demand assemble-to-order problem with expediting
    • Fu, K., Hsu, V.N., Lee, C.-Y., Note-optimal component acquisition for a single-product, single-demand assemble-to-order problem with expediting. Manuf. Service Oper. Manage. 11:2 (2009), 229–236.
    • (2009) Manuf. Service Oper. Manage. , vol.11 , Issue.2 , pp. 229-236
    • Fu, K.1    Hsu, V.N.2    Lee, C.-Y.3
  • 12
    • 0028396352 scopus 로고
    • Lot sizing in assembly systems with random component yields
    • Gerchak, Y., Wang, Y., Yano, C.A., Lot sizing in assembly systems with random component yields. IIE Trans. 26:2 (1994), 19–24.
    • (1994) IIE Trans. , vol.26 , Issue.2 , pp. 19-24
    • Gerchak, Y.1    Wang, Y.2    Yano, C.A.3
  • 13
    • 56549101461 scopus 로고    scopus 로고
    • On coordinating an assembly system under random yield and random demand
    • Güler, M.G., Bilgiç T., On coordinating an assembly system under random yield and random demand. Eur. J. Oper. Res. 196:1 (2009), 342–350.
    • (2009) Eur. J. Oper. Res. , vol.196 , Issue.1 , pp. 342-350
    • Güler, M.G.1    Bilgiç, T.2
  • 14
    • 3042545957 scopus 로고    scopus 로고
    • Supply management in assembly systems with random yield and random demand
    • Gurnani, H., Akella, R., Lehoczky, J., Supply management in assembly systems with random yield and random demand. IIE Trans. 32:8 (2000), 701–714.
    • (2000) IIE Trans. , vol.32 , Issue.8 , pp. 701-714
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 15
    • 33750008370 scopus 로고    scopus 로고
    • Coordination in decentralized assembly systems with uncertain component yields
    • Gurnani, H., Gerchak, Y., Coordination in decentralized assembly systems with uncertain component yields. Eur. J. Oper. Res. 176:3 (2007), 1559–1576.
    • (2007) Eur. J. Oper. Res. , vol.176 , Issue.3 , pp. 1559-1576
    • Gurnani, H.1    Gerchak, Y.2
  • 16
    • 33644931174 scopus 로고    scopus 로고
    • Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing
    • Hsu, V.N., Lee, C.Y., So, K.C., Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing. Manage. Sci. 52:3 (2006), 337–351.
    • (2006) Manage. Sci. , vol.52 , Issue.3 , pp. 337-351
    • Hsu, V.N.1    Lee, C.Y.2    So, K.C.3
  • 17
    • 34547662144 scopus 로고    scopus 로고
    • Managing components for assemble-to-order products with lead-time-dependent pricing: the full-shipment model
    • Hsu, V.N., Lee, C.Y., So, K.C., Managing components for assemble-to-order products with lead-time-dependent pricing: the full-shipment model. Naval Res. Logist. (NRL) 54:5 (2007), 510–523.
    • (2007) Naval Res. Logist. (NRL) , vol.54 , Issue.5 , pp. 510-523
    • Hsu, V.N.1    Lee, C.Y.2    So, K.C.3
  • 18
    • 84929206641 scopus 로고    scopus 로고
    • Managing supply disruptions when sourcing from reliable and unreliable suppliers
    • Hu, B., Kostamis, D., Managing supply disruptions when sourcing from reliable and unreliable suppliers. Prod. Oper. Manage. 24:5 (2015), 808–820.
    • (2015) Prod. Oper. Manage. , vol.24 , Issue.5 , pp. 808-820
    • Hu, B.1    Kostamis, D.2
  • 19
    • 84872726890 scopus 로고    scopus 로고
    • Managing risk of supply disruptions: incentives for capacity restoration
    • Hu, X., Gurnani, H., Wang, L., Managing risk of supply disruptions: incentives for capacity restoration. Prod. Oper. Manage. 22:1 (2013), 137–150.
    • (2013) Prod. Oper. Manage. , vol.22 , Issue.1 , pp. 137-150
    • Hu, X.1    Gurnani, H.2    Wang, L.3
  • 20
    • 84922902057 scopus 로고    scopus 로고
    • Managing supplier competition and sourcing sequence for component manufacturing
    • Jiang, L., Managing supplier competition and sourcing sequence for component manufacturing. Prod. Oper. Manage. 24:2 (2015), 287–310.
    • (2015) Prod. Oper. Manage. , vol.24 , Issue.2 , pp. 287-310
    • Jiang, L.1
  • 21
    • 85168425782 scopus 로고    scopus 로고
    • Why global sourcing is no longer a choice?
    • John, W., Why global sourcing is no longer a choice?. Articlesbase, 2014.
    • (2014) Articlesbase
    • John, W.1
  • 22
    • 84906811743 scopus 로고    scopus 로고
    • The Ripple Effect: How Manufacturing and Retail Executives View the Growing Challenge of Supply Chain Risk
    • Deloitte Consulting LLP
    • Kelly, M., Siva, P., The Ripple Effect: How Manufacturing and Retail Executives View the Growing Challenge of Supply Chain Risk. 2013, Deloitte Consulting LLP.
    • (2013)
    • Kelly, M.1    Siva, P.2
  • 23
    • 84885969138 scopus 로고    scopus 로고
    • Handbook of Integrated Risk Management in Global Supply Chains
    • John Wiley & Sons
    • Kouvelis, P., Dong, L., Boyabatli, O., Li, R., Handbook of Integrated Risk Management in Global Supply Chains. 2011, John Wiley & Sons.
    • (2011)
    • Kouvelis, P.1    Dong, L.2    Boyabatli, O.3    Li, R.4
  • 24
    • 84971623984 scopus 로고    scopus 로고
    • Impact of decision sequence on reliability enhancement with supply disruption risks
    • Li, G., Zhang, L., Guan, X., Zheng, J., Impact of decision sequence on reliability enhancement with supply disruption risks. Transp. Res. Part E: Logist. Transp. Rev. 90 (2016), 25–38.
    • (2016) Transp. Res. Part E: Logist. Transp. Rev. , vol.90 , pp. 25-38
    • Li, G.1    Zhang, L.2    Guan, X.3    Zheng, J.4
  • 25
    • 78651429051 scopus 로고    scopus 로고
    • Technical note-optimal product pricing and component production quantities for an assembly system under supply uncertainty
    • Pan, W., So, K.C., Technical note-optimal product pricing and component production quantities for an assembly system under supply uncertainty. Oper. Res. 58:6 (2010), 1792–1797.
    • (2010) Oper. Res. , vol.58 , Issue.6 , pp. 1792-1797
    • Pan, W.1    So, K.C.2
  • 26
    • 84956584439 scopus 로고    scopus 로고
    • Component procurement strategies in decentralized assembly systems under supply uncertainty
    • Pan, W., So, K.C., Component procurement strategies in decentralized assembly systems under supply uncertainty. IIE Trans. 48:3 (2016), 267–282.
    • (2016) IIE Trans. , vol.48 , Issue.3 , pp. 267-282
    • Pan, W.1    So, K.C.2
  • 27
    • 85168413851 scopus 로고    scopus 로고
    • Global sourcing: the path to high performance
    • Paul, D.L., Global sourcing: the path to high performance. Inbound Logist., 2007.
    • (2007) Inbound Logist.
    • Paul, D.L.1
  • 28
    • 84860184992 scopus 로고    scopus 로고
    • Supply disruption and reactive strategies in an assemble-to-order supply chain with time-sensitive demand
    • Shao, X.-F., Dong, M., Supply disruption and reactive strategies in an assemble-to-order supply chain with time-sensitive demand. IEEE Trans. Eng. Manage. 59:2 (2012), 201–212.
    • (2012) IEEE Trans. Eng. Manage. , vol.59 , Issue.2 , pp. 201-212
    • Shao, X.-F.1    Dong, M.2
  • 30
    • 77950476024 scopus 로고    scopus 로고
    • Supply Chain Operations: Assemble-to-Order Systems[J]. Handbooks in Operations Research & Management Science
    • Song, J.S., Zipkin, P., 2003. Supply Chain Operations: Assemble-to-Order Systems[J]. Handbooks in Operations Research & Management Science 11(03), 561–596.
    • (2003) , vol.11 , Issue.3 , pp. 561-596
    • Song, J.S.1    Zipkin, P.2
  • 31
    • 61349120745 scopus 로고    scopus 로고
    • Bounded rationality in newsvendor models
    • Su, X., Bounded rationality in newsvendor models. Manuf. Serv. Oper. Manage. 10:4 (2008), 566–589.
    • (2008) Manuf. Serv. Oper. Manage. , vol.10 , Issue.4 , pp. 566-589
    • Su, X.1
  • 32
    • 84904724844 scopus 로고    scopus 로고
    • Managing disruptions in decentralized supply chains with endogenous supply process reliability
    • Tang, S.Y., Gurnani, H., Gupta, D., Managing disruptions in decentralized supply chains with endogenous supply process reliability. Prod. Oper. Manage. 23:7 (2014), 1198–1211.
    • (2014) Prod. Oper. Manage. , vol.23 , Issue.7 , pp. 1198-1211
    • Tang, S.Y.1    Gurnani, H.2    Gupta, D.3
  • 33
    • 33646342992 scopus 로고    scopus 로고
    • On the value of mitigation and contingency strategies for managing supply chain disruption risks
    • Tomlin, B., On the value of mitigation and contingency strategies for managing supply chain disruption risks. Manage. Sci. 52:5 (2006), 639–657.
    • (2006) Manage. Sci. , vol.52 , Issue.5 , pp. 639-657
    • Tomlin, B.1
  • 34
    • 67649770080 scopus 로고    scopus 로고
    • Disruption-management strategies for short life-cycle products
    • Tomlin, B., Disruption-management strategies for short life-cycle products. Naval Res. Logist. (NRL) 56:4 (2009), 318–347.
    • (2009) Naval Res. Logist. (NRL) , vol.56 , Issue.4 , pp. 318-347
    • Tomlin, B.1
  • 35
    • 84900402115 scopus 로고    scopus 로고
    • Home or overseas? an analysis of sourcing strategies under competition
    • Wu, X., Zhang, F., Home or overseas? an analysis of sourcing strategies under competition. Manage. Sci. 60:5 (2014), 1223–1240.
    • (2014) Manage. Sci. , vol.60 , Issue.5 , pp. 1223-1240
    • Wu, X.1    Zhang, F.2
  • 36
    • 79953070276 scopus 로고    scopus 로고
    • Sharing demand and supply risk in a supply chain
    • Xia, Y., Ramachandran, K., Gurnani, H., Sharing demand and supply risk in a supply chain. IIE Trans. 43:6 (2011), 451–469.
    • (2011) IIE Trans. , vol.43 , Issue.6 , pp. 451-469
    • Xia, Y.1    Ramachandran, K.2    Gurnani, H.3
  • 37
    • 70449521201 scopus 로고    scopus 로고
    • Optimal decisions for assemble-to-order systems with uncertain assembly capacity
    • Xiao, Y., Chen, J., Lee, C.-Y., Optimal decisions for assemble-to-order systems with uncertain assembly capacity. Int. J. Prod. Econ. 123:1 (2010), 155–165.
    • (2010) Int. J. Prod. Econ. , vol.123 , Issue.1 , pp. 155-165
    • Xiao, Y.1    Chen, J.2    Lee, C.-Y.3
  • 38
    • 76949094221 scopus 로고    scopus 로고
    • A note on coordination in decentralized assembly systems with uncertain component yields
    • Yan, X., Zhang, M., Liu, K., A note on coordination in decentralized assembly systems with uncertain component yields. Eur. J. Oper. Res. 205:2 (2010), 469–478.
    • (2010) Eur. J. Oper. Res. , vol.205 , Issue.2 , pp. 469-478
    • Yan, X.1    Zhang, M.2    Liu, K.3
  • 39
    • 0024137576 scopus 로고
    • Optimal run quantities for an assembly system with random yields
    • Yao, D.D., Optimal run quantities for an assembly system with random yields. IIE Trans. 20:4 (1988), 399–403.
    • (1988) IIE Trans. , vol.20 , Issue.4 , pp. 399-403
    • Yao, D.D.1
  • 40
    • 84877813342 scopus 로고    scopus 로고
    • Dual-channel component replenishment problem in an assemble-to-order system
    • Yao, Z., Lee, L.H., Chew, E.P., Hsu, V.N., Jaruphongsa, W., Dual-channel component replenishment problem in an assemble-to-order system. IIE Trans. 45:3 (2013), 229–243.
    • (2013) IIE Trans. , vol.45 , Issue.3 , pp. 229-243
    • Yao, Z.1    Lee, L.H.2    Chew, E.P.3    Hsu, V.N.4    Jaruphongsa, W.5
  • 41
    • 84875260121 scopus 로고    scopus 로고
    • Integrating global and local procurement for superior supplier working relations
    • Yeniyurt, S., Henke, J.W. Jr., Cavusgil, E., Integrating global and local procurement for superior supplier working relations. Int. Bus. Rev. 22:2 (2013), 351–362.
    • (2013) Int. Bus. Rev. , vol.22 , Issue.2 , pp. 351-362
    • Yeniyurt, S.1    Henke, J.W.2    Cavusgil, E.3
  • 42
    • 84955251915 scopus 로고    scopus 로고
    • Transportation disruption risk management: business interruption insurance and backup transportation
    • Risk Management of Logistics Systems.
    • Zhen, X., Li, Y., Cai, G.G., Shi, D., Transportation disruption risk management: business interruption insurance and backup transportation. Transp. Res. Part E: Logist. Transp. Rev. 90 (2016), 51–68 Risk Management of Logistics Systems.
    • (2016) Transp. Res. Part E: Logist. Transp. Rev. , vol.90 , pp. 51-68
    • Zhen, X.1    Li, Y.2    Cai, G.G.3    Shi, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.