메뉴 건너뛰기




Volumn 123, Issue 1, 2010, Pages 155-165

Optimal decisions for assemble-to-order systems with uncertain assembly capacity

Author keywords

Assemble in advance; Assemble to order systems; Assembly outsourcing; Emergency replenishment; Uncertain assembly capacity

Indexed keywords

ASSEMBLE-IN-ADVANCE; ASSEMBLE-TO-ORDER SYSTEMS; ASSEMBLY OUTSOURCING; EMERGENCY REPLENISHMENT; UNCERTAIN ASSEMBLY CAPACITY;

EID: 70449521201     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2009.07.012     Document Type: Article
Times cited : (34)

References (28)
  • 1
    • 17344394414 scopus 로고    scopus 로고
    • Joint inventory replenishment and component allocation optimization in an assemble-to-order system
    • Akçay A., and Xu S.H. Joint inventory replenishment and component allocation optimization in an assemble-to-order system. Management Science 50 1 (2004) 99-116
    • (2004) Management Science , vol.50 , Issue.1 , pp. 99-116
    • Akçay, A.1    Xu, S.H.2
  • 2
    • 0033207830 scopus 로고    scopus 로고
    • Modeling emergency supply flexibility in a two-echelon inventory system
    • Alfredsson P., and Verrijdt J. Modeling emergency supply flexibility in a two-echelon inventory system. Management Science 45 10 (1999) 1416-1431
    • (1999) Management Science , vol.45 , Issue.10 , pp. 1416-1431
    • Alfredsson, P.1    Verrijdt, J.2
  • 3
    • 0001385966 scopus 로고
    • A delivery-lag inventory model with an emergency provision
    • Barankin E.W. A delivery-lag inventory model with an emergency provision. Naval Research Logistics 8 (1961) 285-311
    • (1961) Naval Research Logistics , vol.8 , pp. 285-311
    • Barankin, E.W.1
  • 4
    • 11844299024 scopus 로고    scopus 로고
    • A decomposition approach for managing assembly systems with demand and supply uncertainty
    • Bollapragada R., Rao U.S., and Zhang J. A decomposition approach for managing assembly systems with demand and supply uncertainty. Management Science 50 12 (2004) 1729-1743
    • (2004) Management Science , vol.50 , Issue.12 , pp. 1729-1743
    • Bollapragada, R.1    Rao, U.S.2    Zhang, J.3
  • 6
    • 0003285290 scopus 로고
    • A delivery-lag inventory model with emergency
    • Scarf H.E., Gilford D.M., and Shelly M.W. (Eds), Stanford University Press, Stanford, CA
    • Daniel K.H. A delivery-lag inventory model with emergency. In: Scarf H.E., Gilford D.M., and Shelly M.W. (Eds). Multistage Inventory Models and Techniques (1962), Stanford University Press, Stanford, CA
    • (1962) Multistage Inventory Models and Techniques
    • Daniel, K.H.1
  • 7
    • 84977362686 scopus 로고
    • Assemble to order and assemble in advance in a single-period stochastic environment
    • Eynan A., and Rosenblatt M.J. Assemble to order and assemble in advance in a single-period stochastic environment. Naval Research Logistics 42 (1995) 861-872
    • (1995) Naval Research Logistics , vol.42 , pp. 861-872
    • Eynan, A.1    Rosenblatt, M.J.2
  • 8
    • 34548573576 scopus 로고    scopus 로고
    • The impact of component commonality on composite assembly policies
    • Eynan A., and Rosenblatt M.J. The impact of component commonality on composite assembly policies. Naval Research Logistics 54 6 (2007) 615-622
    • (2007) Naval Research Logistics , vol.54 , Issue.6 , pp. 615-622
    • Eynan, A.1    Rosenblatt, M.J.2
  • 9
    • 33847070855 scopus 로고    scopus 로고
    • Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity
    • Fu K., Hsu V.N., and Lee C.Y. Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity. Operations Research 54 (2006) 1137-1150
    • (2006) Operations Research , vol.54 , pp. 1137-1150
    • Fu, K.1    Hsu, V.N.2    Lee, C.Y.3
  • 10
    • 67649982773 scopus 로고    scopus 로고
    • Optimal component acquisition for an assemble-to-order system with expediting
    • Fu K., Hsu V.N., and Lee C.Y. Optimal component acquisition for an assemble-to-order system with expediting. Manufacturing and Service Operations Management 11 (2009) 229-236
    • (2009) Manufacturing and Service Operations Management , vol.11 , pp. 229-236
    • Fu, K.1    Hsu, V.N.2    Lee, C.Y.3
  • 11
    • 0030285543 scopus 로고    scopus 로고
    • Optimal order policies in assembly systems with random demand and random supplier delivery
    • Gurnani H., Akella R., and Lehoczky J. Optimal order policies in assembly systems with random demand and random supplier delivery. IIE Transactions 28 (1996) 865-878
    • (1996) IIE Transactions , vol.28 , pp. 865-878
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 12
    • 0032162978 scopus 로고    scopus 로고
    • A single-period, multi-echelon stochastic model under a mix of assemble to order and assemble in advance policies
    • Hariga M. A single-period, multi-echelon stochastic model under a mix of assemble to order and assemble in advance policies. Naval Research Logistics 45 (1998) 599-614
    • (1998) Naval Research Logistics , vol.45 , pp. 599-614
    • Hariga, M.1
  • 13
    • 0027562596 scopus 로고
    • Setting safety leadtimes for purchased components in assembly systems
    • Hopp W., and Spearman M. Setting safety leadtimes for purchased components in assembly systems. IIE Transactions 25 (1993) 2-11
    • (1993) IIE Transactions , vol.25 , pp. 2-11
    • Hopp, W.1    Spearman, M.2
  • 14
    • 33644931174 scopus 로고    scopus 로고
    • Optimal component stocking policy for assemble-to-order systems with leadtime-dependent component and product pricing
    • Hsu V.N., Lee C.Y., and So K.C. Optimal component stocking policy for assemble-to-order systems with leadtime-dependent component and product pricing. Management Science 52 3 (2006) 337-351
    • (2006) Management Science , vol.52 , Issue.3 , pp. 337-351
    • Hsu, V.N.1    Lee, C.Y.2    So, K.C.3
  • 15
    • 0024682607 scopus 로고
    • Component inventory costs in an assembly problem with uncertain supplier lead-times
    • Kumar A. Component inventory costs in an assembly problem with uncertain supplier lead-times. IIE Transactions 21 (1989) 112-121
    • (1989) IIE Transactions , vol.21 , pp. 112-121
    • Kumar, A.1
  • 17
    • 70449531864 scopus 로고    scopus 로고
    • Rudi, N., 1998. Optimal inventory levels in systems with common components. Working paper, W.E. Simon Graduate School of Business Administration, University of Rochester, N.Y.
    • Rudi, N., 1998. Optimal inventory levels in systems with common components. Working paper, W.E. Simon Graduate School of Business Administration, University of Rochester, N.Y.
  • 18
    • 70449533473 scopus 로고    scopus 로고
    • Rudi, N., 2000. Dual sourcing: combining make-to-stock and assemble-to-order. Working paper, W.E. Simon Graduate School of Business Administration, University of Rochester, N.Y.
    • Rudi, N., 2000. Dual sourcing: combining make-to-stock and assemble-to-order. Working paper, W.E. Simon Graduate School of Business Administration, University of Rochester, N.Y.
  • 19
    • 0029392207 scopus 로고
    • Setting safety lead-times for purchased components in assembly systems: a general solution procedure
    • Shore H. Setting safety lead-times for purchased components in assembly systems: a general solution procedure. IIE Transactions 27 (1995) 634-637
    • (1995) IIE Transactions , vol.27 , pp. 634-637
    • Shore, H.1
  • 20
    • 0002779268 scopus 로고    scopus 로고
    • Order fulfillment performance measures in an assemble-to-order system with stochastic leadtimes
    • Song J.S., Xu S., and Liu B. Order fulfillment performance measures in an assemble-to-order system with stochastic leadtimes. Operations Research 47 1 (1999) 131-149
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 131-149
    • Song, J.S.1    Xu, S.2    Liu, B.3
  • 21
    • 0348154255 scopus 로고    scopus 로고
    • Contract assembly: dealing with combined supply lead time and demand quantity uncertainty
    • Song J.S., Yano C.A., and Lerssrisutiya P. Contract assembly: dealing with combined supply lead time and demand quantity uncertainty. Manufacturing and Service Operations Management 2 3 (2000) 287-296
    • (2000) Manufacturing and Service Operations Management , vol.2 , Issue.3 , pp. 287-296
    • Song, J.S.1    Yano, C.A.2    Lerssrisutiya, P.3
  • 22
    • 77950476024 scopus 로고    scopus 로고
    • Supply chain operations: assemble-to-order systems
    • Graves S., and Kok R.D. (Eds), North Holland, Amsterdam, The Netherlands (Chapter 11)
    • Song J.S., and Zipkin P. Supply chain operations: assemble-to-order systems. In: Graves S., and Kok R.D. (Eds). Handbooks in Operations Research and Management Science (2003), North Holland, Amsterdam, The Netherlands (Chapter 11)
    • (2003) Handbooks in Operations Research and Management Science
    • Song, J.S.1    Zipkin, P.2
  • 23
    • 0032292446 scopus 로고    scopus 로고
    • Managing broader product lines through delayed differentiation using Vanilla boxes
    • Swaminathan J.M., and Tayur S.R. Managing broader product lines through delayed differentiation using Vanilla boxes. Management Science 44 12 (1998) S161-S172
    • (1998) Management Science , vol.44 , Issue.12
    • Swaminathan, J.M.1    Tayur, S.R.2
  • 24
    • 0035295088 scopus 로고    scopus 로고
    • A periodic review inventory system with emergency replenishments
    • Tagaras G., and Vlachos D. A periodic review inventory system with emergency replenishments. Management Science 47 3 (2001) 415-429
    • (2001) Management Science , vol.47 , Issue.3 , pp. 415-429
    • Tagaras, G.1    Vlachos, D.2
  • 25
    • 58049194043 scopus 로고    scopus 로고
    • Multi-site available-to-promise modeling for assemble-to-order manufacturing: an illustration on TFT-LCD manufacturing
    • Tsai K., and Wang S. Multi-site available-to-promise modeling for assemble-to-order manufacturing: an illustration on TFT-LCD manufacturing. International Journal of Production Economics 117 1 (2009) 174-184
    • (2009) International Journal of Production Economics , vol.117 , Issue.1 , pp. 174-184
    • Tsai, K.1    Wang, S.2
  • 27
    • 0023558979 scopus 로고
    • Stochastic leadtimes in two-level assembly systems
    • Yano C. Stochastic leadtimes in two-level assembly systems. IIE Transactions 19 (1987) 371-378
    • (1987) IIE Transactions , vol.19 , pp. 371-378
    • Yano, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.