메뉴 건너뛰기




Volumn 52, Issue 3, 2006, Pages 337-351

Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing

Author keywords

Assemble to order manufacturing; Inventory management; Lead time management; Optimal stocking policies

Indexed keywords

ASSEMBLE-TO-ORDER MANUFACTURING; INVENTORY MANAGEMENT; LEAD-TIME MANAGEMENT; OPTIMAL STOCKING POLICIES;

EID: 33644931174     PISSN: 00251909     EISSN: 15265501     Source Type: Journal    
DOI: 10.1287/mnsc.1050.0438     Document Type: Article
Times cited : (51)

References (34)
  • 1
    • 0345549463 scopus 로고    scopus 로고
    • Product differentiation and capacity cost interaction in time and price sensitive market
    • Boyaci, T., S. Ray. 2003. Product differentiation and capacity cost interaction in time and price sensitive market. Manufacturing Service Oper. Management 5 18-36.
    • (2003) Manufacturing Service Oper. Management , vol.5 , pp. 18-36
    • Boyaci, T.1    Ray, S.2
  • 2
    • 0036815272 scopus 로고    scopus 로고
    • Competition and outsourcing with scale economies
    • Cachon, G., P. Parker. 2002. Competition and outsourcing with scale economies. Management Sci 48 1314-1333.
    • (2002) Management Sci , vol.48 , pp. 1314-1333
    • Cachon, G.1    Parker, P.2
  • 3
    • 0029288586 scopus 로고
    • Multiple failures in a multi-item spare inventory model
    • Cheung, K. L., W. Hausman. 1995. Multiple failures in a multi-item spare inventory model. IIE Trans. 27 171-180.
    • (1995) IIE Trans. , vol.27 , pp. 171-180
    • Cheung, K.L.1    Hausman, W.2
  • 4
    • 84989726438 scopus 로고
    • Supply management in assembly systems
    • Chu, C., J. M. Proth, X. Xie. 1993. Supply management in assembly systems. Naval Res. Logist. 40 933-950.
    • (1993) Naval Res. Logist. , vol.40 , pp. 933-950
    • Chu, C.1    Proth, J.M.2    Xie, X.3
  • 5
    • 26944447779 scopus 로고    scopus 로고
    • An optimal (Q, r) policy for a multipart assembly system under stochastic part procurement lead times
    • Fujiwara, O., D. Sedarage. 1997. An optimal (Q, r) policy for a multipart assembly system under stochastic part procurement lead times. Eur. J. Oper. Res. 100 550-556.
    • (1997) Eur. J. Oper. Res. , vol.100 , pp. 550-556
    • Fujiwara, O.1    Sedarage, D.2
  • 6
    • 0035536034 scopus 로고    scopus 로고
    • A simple and effective component procurement policy for assembly systems
    • Gallien, J., L. Wein. 2001. A simple and effective component procurement policy for assembly systems. Queueing Systems 38 221-248.
    • (2001) Queueing Systems , vol.38 , pp. 221-248
    • Gallien, J.1    Wein, L.2
  • 7
    • 0032202098 scopus 로고    scopus 로고
    • Leadtime-inventory tradeoffs in assemble-to-order systems
    • Glasserman, P., Y. Wang. 1998. Leadtime-inventory tradeoffs in assemble-to-order systems. Oper. Res. 46 858-871.
    • (1998) Oper. Res. , vol.46 , pp. 858-871
    • Glasserman, P.1    Wang, Y.2
  • 8
    • 0030285543 scopus 로고    scopus 로고
    • Optimal order policies in assembly systems with random demand and random supplier delivery
    • Gurnani, H., R. Akella, J. Lehoczky. 1996. Optimal order policies in assembly systems with random demand and random supplier delivery. IIE Trans. 28 865-878.
    • (1996) IIE Trans. , vol.28 , pp. 865-878
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 9
    • 0032169180 scopus 로고    scopus 로고
    • Order response time reliability in a multi-item inventory systems
    • Hausman, W. H., H. L. Lee, A. X. Zhang. 1998. Order response time reliability in a multi-item inventory systems. Eur. J. Oper. Res. 109 646-659.
    • (1998) Eur. J. Oper. Res. , vol.109 , pp. 646-659
    • Hausman, W.H.1    Lee, H.L.2    Zhang, A.X.3
  • 10
    • 0027562596 scopus 로고
    • Setting safety leadtimes for purchased components in assembly systems
    • Hopp, W., M. Spearman. 1993. Setting safety leadtimes for purchased components in assembly systems. IIE Trans. 25 2-11.
    • (1993) IIE Trans. , vol.25 , pp. 2-11
    • Hopp, W.1    Spearman, M.2
  • 11
    • 33644891768 scopus 로고    scopus 로고
    • Managing components for assemble-to-order products with leadtime-dependent pricing: The full-shipment model
    • University of California, Irvine, CA
    • Hsu, V. N., C. Y. Lee, K. C. So. 2005. Managing components for assemble-to-order products with leadtime-dependent pricing: The full-shipment model. Working paper, University of California, Irvine, CA.
    • (2005) Working Paper
    • Hsu, V.N.1    Lee, C.Y.2    So, K.C.3
  • 12
    • 0024682607 scopus 로고
    • Component inventory costs in an assembly problem with uncertain supplier lead-times
    • Kumar, A. 1989. Component inventory costs in an assembly problem with uncertain supplier lead-times. IIE Trans. 21 112-121.
    • (1989) IIE Trans. , vol.21 , pp. 112-121
    • Kumar, A.1
  • 13
    • 0031147138 scopus 로고    scopus 로고
    • Pricing, production scheduling and delivery-time competition
    • Lederer, P. J., L. Li. 1997. Pricing, production scheduling and delivery-time competition. Oper. Res. 45 407-420.
    • (1997) Oper. Res. , vol.45 , pp. 407-420
    • Lederer, P.J.1    Li, L.2
  • 14
    • 4344612887 scopus 로고    scopus 로고
    • Order fill rate, leadtime variability, and advance demand information in an assemble-to-order system
    • Lu, Y., J. S. Song, D. D. Yao. 2003. Order fill rate, leadtime variability, and advance demand information in an assemble-to-order system. Oper. Res. 51 292-308.
    • (2003) Oper. Res. , vol.51 , pp. 292-308
    • Lu, Y.1    Song, J.S.2    Yao, D.D.3
  • 15
    • 0032003355 scopus 로고    scopus 로고
    • Lead time setting, capacity utilization, and pricing decisions under lead time dependent demand
    • Palaka, K., S. Erlebacher, H. Kropp. 1998. Lead time setting, capacity utilization, and pricing decisions under lead time dependent demand. IIE Trans. 30 151-163.
    • (1998) IIE Trans. , vol.30 , pp. 151-163
    • Palaka, K.1    Erlebacher, S.2    Kropp, H.3
  • 16
    • 0031249189 scopus 로고    scopus 로고
    • Supply management for cost minimization in an assembly system with random component yield times
    • Proth, J.-M., G. Mauroy, Y Wardi, C. Chu. 1997. Supply management for cost minimization in an assembly system with random component yield times. J. Intelligent Manufacturing 8 385-403.
    • (1997) J. Intelligent Manufacturing , vol.8 , pp. 385-403
    • Proth, J.-M.1    Mauroy, G.2    Wardi, Y.3    Chu, C.4
  • 17
    • 0242406687 scopus 로고    scopus 로고
    • Customer lead time management when both price and demand are lead time dependent
    • Ray, S., E. M. Jewkes. 2003. Customer lead time management when both price and demand are lead time dependent. Eur. J. Oper. Res. 153 769-781.
    • (2003) Eur. J. Oper. Res. , vol.153 , pp. 769-781
    • Ray, S.1    Jewkes, E.M.2
  • 18
    • 0024701994 scopus 로고
    • Optimal inventory policies for assembly systems under random demands
    • Rosling, K. 1989. Optimal inventory policies for assembly systems under random demands. Oper. Res. 37 565-579.
    • (1989) Oper. Res. , vol.37 , pp. 565-579
    • Rosling, K.1
  • 19
    • 0022131173 scopus 로고
    • Optimal policies for a two-stage assembly system under random demand
    • Schmidt, C., S. Nahmias. 1985. Optimal policies for a two-stage assembly system under random demand. Oper. Res. 33 1130-1145.
    • (1985) Oper. Res. , vol.33 , pp. 1130-1145
    • Schmidt, C.1    Nahmias, S.2
  • 20
    • 0029392207 scopus 로고
    • Setting safety lead-times for purchased components in assembly systems: A general solution procedure
    • Shore, H. 1995. Setting safety lead-times for purchased components in assembly systems: A general solution procedure. IIE Trans. 27 634-637.
    • (1995) IIE Trans. , vol.27 , pp. 634-637
    • Shore, H.1
  • 21
    • 0042072128 scopus 로고    scopus 로고
    • Price and time competition for service delivery
    • So, K. C. 2000. Price and time competition for service delivery. Manufacturing Service Oper. Management 2 392-409.
    • (2000) Manufacturing Service Oper. Management , vol.2 , pp. 392-409
    • So, K.C.1
  • 22
    • 0032210055 scopus 로고    scopus 로고
    • Price, delivery time guarantees and capacity selection
    • So, K. C., J. J. Song. 1998. Price, delivery time guarantees and capacity selection. Eur. J. Oper. Res. 111 28-49.
    • (1998) Eur. J. Oper. Res. , vol.111 , pp. 28-49
    • So, K.C.1    Song, J.J.2
  • 23
    • 0032201713 scopus 로고    scopus 로고
    • On the order fill rate in a multi-item, base-stock inventory system
    • Song, J. S. 1998. On the order fill rate in a multi-item, base-stock inventory system. Oper, Res. 46 831-845.
    • (1998) Oper, Res. , vol.46 , pp. 831-845
    • Song, J.S.1
  • 24
    • 0036541991 scopus 로고    scopus 로고
    • Order-based backorders and their implications in multi-item inventory systems
    • Song, J. S. 2002. Order-based backorders and their implications in multi-item inventory systems. Management Sci. 48 499-516.
    • (2002) Management Sci. , vol.48 , pp. 499-516
    • Song, J.S.1
  • 25
    • 0036758161 scopus 로고    scopus 로고
    • Performance analysis and optimization of assemble-to-order systems with random leadtimes
    • Song, J. S., D. D. Yao. 2002. Performance analysis and optimization of assemble-to-order systems with random leadtimes. Oper. Res. 50 889-903.
    • (2002) Oper. Res. , vol.50 , pp. 889-903
    • Song, J.S.1    Yao, D.D.2
  • 26
    • 77950476024 scopus 로고    scopus 로고
    • Supply chain operations: Assemble-to-order
    • A. de Kok, S. Graves, eds. Chapter 11 . North-Holland, Amsterdam, The Netherlands
    • Song, J. S., P. Zipkin. 2003. Supply chain operations: Assemble-to-order. A. de Kok, S. Graves, eds. Chapter 11, Handbooks in Operations Research and Management Science, Vol. 30. North-Holland, Amsterdam, The Netherlands.
    • (2003) Handbooks in Operations Research and Management Science , vol.30
    • Song, J.S.1    Zipkin, P.2
  • 27
    • 0002779268 scopus 로고    scopus 로고
    • Order fulfillment performance measures in an assembly-to-order system with stochastic leadtimes
    • Song, J. S., S. Xu, B. Liu. 1999. Order fulfillment performance measures in an assembly-to-order system with stochastic leadtimes. Oper. Res. 47 131-149.
    • (1999) Oper. Res. , vol.47 , pp. 131-149
    • Song, J.S.1    Xu, S.2    Liu, B.3
  • 28
    • 0348154255 scopus 로고    scopus 로고
    • Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty
    • Song, J. S., C. A. Yano, P. Lerssrisutiya. 2000. Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing Service Oper. Management 1 287-296.
    • (2000) Manufacturing Service Oper. Management , vol.1 , pp. 287-296
    • Song, J.S.1    Yano, C.A.2    Lerssrisutiya, P.3
  • 29
    • 0005041648 scopus 로고    scopus 로고
    • Dynamic lot sizing with random demand and nonstationary costs
    • Sox, C. R. 1997. Dynamic lot sizing with random demand and nonstationary costs. Oper. Res, Lett. 20 155-164.
    • (1997) Oper. Res, Lett. , vol.20 , pp. 155-164
    • Sox, C.R.1
  • 30
    • 0030287501 scopus 로고    scopus 로고
    • Multi-item, multi-period production planning with uncertain demand
    • Sox, C. R., J. A. Muckstadt. 1996. Multi-item, multi-period production planning with uncertain demand. IIE Trans. 28 891-900.
    • (1996) IIE Trans. , vol.28 , pp. 891-900
    • Sox, C.R.1    Muckstadt, J.A.2
  • 31
    • 0031145148 scopus 로고    scopus 로고
    • Optimization-based planning for the stochastic lot-scheduling problem
    • Sox, C. R., J. A. Muckstadt. 1997. Optimization-based planning for the stochastic lot-scheduling problem. IIE Trans. 29 349-357.
    • (1997) IIE Trans. , vol.29 , pp. 349-357
    • Sox, C.R.1    Muckstadt, J.A.2
  • 32
    • 0345548370 scopus 로고    scopus 로고
    • Capacity games in assembly systems with uncertain demand
    • Wang, Y., Y. Gerchak. 2003. Capacity games in assembly systems with uncertain demand. Manufucturing Service Oper, Management 5 252-267.
    • (2003) Manufucturing Service Oper, Management , vol.5 , pp. 252-267
    • Wang, Y.1    Gerchak, Y.2
  • 33
    • 13544273051 scopus 로고    scopus 로고
    • Dynamic pricing and lead-time policies for make-to-order systems
    • Webster, S. 2002. Dynamic pricing and lead-time policies for make-to-order systems. Decision Sci. 33 579-599.
    • (2002) Decision Sci. , vol.33 , pp. 579-599
    • Webster, S.1
  • 34
    • 0023558979 scopus 로고
    • Stochastic leadtimes in two-level assembly systems
    • Yano, C. 1987. Stochastic leadtimes in two-level assembly systems. IIE Trans. 19 371-378.
    • (1987) IIE Trans. , vol.19 , pp. 371-378
    • Yano, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.