-
1
-
-
85019557267
-
Improving the Migrating Birds Optimization Metaheuristic for the Permutation Flow Shop with Sequence-Dependent Set-up times
-
Benkalai, I., D., Rebaine, C., Gagné, and P., Baptiste. 2017. “Improving the Migrating Birds Optimization Metaheuristic for the Permutation Flow Shop with Sequence-Dependent Set-up times.” International Journal of Production Research 55 (20): 6145–6157.10.1080/00207543.2017.1327732
-
(2017)
International Journal of Production Research
, vol.55
, Issue.20
, pp. 6145-6157
-
-
Benkalai, I.1
Rebaine, D.2
Gagné, C.3
Baptiste, P.4
-
2
-
-
0030216880
-
Deformable Sheet Metal Fixturing: Principles, Algorithms and Simulations
-
Cai, W., S. J., Hu, and J. X., Yuan. 1996. “Deformable Sheet Metal Fixturing: Principles, Algorithms and Simulations.” Journal of Manufacturing Science and Engineering 118 (3): 318–324.10.1115/1.2831031
-
(1996)
Journal of Manufacturing Science and Engineering
, vol.118
, Issue.3
, pp. 318-324
-
-
Cai, W.1
Hu, S.J.2
Yuan, J.X.3
-
3
-
-
23344435792
-
Impact of Fixture Design on Sheet Metal Assembly Variation
-
Camelio, J. A., S. J., Hu, and D., Ceglarek. 2004. “Impact of Fixture Design on Sheet Metal Assembly Variation.” Journal of Manufacturing Systems 23 (3): 182–193.10.1016/S0278-6125(05)00006-3
-
(2004)
Journal of Manufacturing Systems
, vol.23
, Issue.3
, pp. 182-193
-
-
Camelio, J.A.1
Hu, S.J.2
Ceglarek, D.3
-
4
-
-
84981736269
-
Use of the Manufacturing System Design Decomposition for Comparative Analysis and Effective Design of Production Systems
-
Cochran, D. S., J. T., Foley, and Z. M., Bi. 2017. “Use of the Manufacturing System Design Decomposition for Comparative Analysis and Effective Design of Production Systems.” International Journal of Production Research 55 (3): 870–890.10.1080/00207543.2016.1218088
-
(2017)
International Journal of Production Research
, vol.55
, Issue.3
, pp. 870-890
-
-
Cochran, D.S.1
Foley, J.T.2
Bi, Z.M.3
-
5
-
-
0026955409
-
The Importance of the Application Sequence of Clamping Forces on Workpiece Accuracy
-
Cogun, C., 1992. “The Importance of the Application Sequence of Clamping Forces on Workpiece Accuracy.” Transactions of the ASME Journal of Engineering for Industry 114 (4): 539–543.10.1115/1.2900709
-
(1992)
Transactions of the ASME Journal of Engineering for Industry
, vol.114
, Issue.4
, pp. 539-543
-
-
Cogun, C.1
-
6
-
-
0035341665
-
A Model to Predict Minimum Required Clamp Pre-Loads in Light of Fixture–Workpiece Compliance
-
De Meter, E. C., W., Xie, and S., Choudhuri. 2001. “A Model to Predict Minimum Required Clamp Pre-Loads in Light of Fixture–Workpiece Compliance.” International Journal of Machine Tools & Manufacture 41 (7): 1031–1054.10.1016/S0890-6955(00)00114-0
-
(2001)
International Journal of Machine Tools & Manufacture
, vol.41
, Issue.7
, pp. 1031-1054
-
-
De Meter, E.C.1
Xie, W.2
Choudhuri, S.3
-
7
-
-
1942507931
-
Finite Element Simulation for Optimal Clamping Scheme of Thin-Walled Workpiece in Milling Process
-
Dong, H. Y., and Y. L., Ke. 2004. “Finite Element Simulation for Optimal Clamping Scheme of Thin-Walled Workpiece in Milling Process.” Journal of Zhejiang University (Engineering Science) 38 (1): 17–21
-
(2004)
Journal of Zhejiang University (Engineering Science)
, vol.38
, Issue.1
, pp. 17-21
-
-
Dong, H.Y.1
Ke, Y.L.2
-
8
-
-
0036430215
-
Computer‐Aided Fixture Design Verification
-
Kang, Y. Z., Y. M., Rong, J. C., Yang, and W., Ma. 2002. “Computer‐Aided Fixture Design Verification.” Assembly Automation 22 (4): 350–359.10.1108/01445150210446229
-
(2002)
Assembly Automation
, vol.22
, Issue.4
, pp. 350-359
-
-
Kang, Y.Z.1
Rong, Y.M.2
Yang, J.C.3
Ma, W.4
-
9
-
-
85021147563
-
An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-Dependent Set-Ups in Parallel Disassembly Environment
-
Forthcoming
-
Kim, H. W., and D. H., Lee. Forthcoming. “An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-Dependent Set-Ups in Parallel Disassembly Environment.” International Journal of Production Research. doi:10.1080/00207543.2017.1342879
-
International Journal of Production Research
-
-
Kim, H.W.1
Lee, D.H.2
-
10
-
-
70449574338
-
Optimisation of Assembly Sequences for Compliant Body Assemblies
-
Lai, X. M., Y. F., Xing, J., Sun, and G. L., Chen. 2009. “Optimisation of Assembly Sequences for Compliant Body Assemblies.” International Journal of Production Research 47 (21): 6129–6143.10.1080/00207540802172037
-
(2009)
International Journal of Production Research
, vol.47
, Issue.21
, pp. 6129-6143
-
-
Lai, X.M.1
Xing, Y.F.2
Sun, J.3
Chen, G.L.4
-
11
-
-
0036487119
-
Fixturing Analysis for Stability Consideration in an Automated Fixture Design System
-
Liao, J. M., 2002. “Fixturing Analysis for Stability Consideration in an Automated Fixture Design System.” Journal of Manufacturing Science and Engineering 124 (2): 98–104
-
(2002)
Journal of Manufacturing Science and Engineering
, vol.124
, Issue.2
, pp. 98-104
-
-
Liao, J.M.1
-
12
-
-
0033897321
-
Flexible Multibody Dynamics Based Fixture-Workpiece Analysis Model for Fixturing Stability
-
Liao, Y. J. G., and S. J., Hu. 2000. “Flexible Multibody Dynamics Based Fixture-Workpiece Analysis Model for Fixturing Stability.” International Journal of Machine Tools & Manufacture 40 (3): 343–362.10.1016/S0890-6955(99)00067-X
-
(2000)
International Journal of Machine Tools & Manufacture
, vol.40
, Issue.3
, pp. 343-362
-
-
Liao, Y.J.G.1
Hu, S.J.2
-
13
-
-
85060899881
-
Automotive Covering Parts of Springback Defect Analysis
-
Liu, S. R., and J. S., Lian. 1997. “Automotive Covering Parts of Springback Defect Analysis.” Automotive Technology 7 (1997): 39–43
-
(1997)
Automotive Technology
, vol.7
, Issue.1997
, pp. 39-43
-
-
Liu, S.R.1
Lian, J.S.2
-
14
-
-
25844528207
-
Modeling and Application of Workpiece Stability Based on the Linear Programming Method
-
Qin, G. H., W. H., Zhang, and M., Wang. 2005. “Modeling and Application of Workpiece Stability Based on the Linear Programming Method.” Chinese Journal of Mechanical Engineering 41 (9): 33–41.10.3901/JME.2005.09.033
-
(2005)
Chinese Journal of Mechanical Engineering
, vol.41
, Issue.9
, pp. 33-41
-
-
Qin, G.H.1
Zhang, W.H.2
Wang, M.3
-
15
-
-
0345867213
-
Analysis of the Effects of Fixture Clamping Sequence on Part Location Errors
-
Raghu, A., and S. N., Melkote. 2004. “Analysis of the Effects of Fixture Clamping Sequence on Part Location Errors.” International Journal of Machine Tools & Manufacture 44 (4): 373–382.10.1016/j.ijmachtools.2003.10.015
-
(2004)
International Journal of Machine Tools & Manufacture
, vol.44
, Issue.4
, pp. 373-382
-
-
Raghu, A.1
Melkote, S.N.2
-
16
-
-
84980347773
-
Assembly Sequence Planning for Processes with Heterogeneous Reliabilities
-
Shoval, S., M., Efatmaneshnik, and M. J., Ryan. 2017. “Assembly Sequence Planning for Processes with Heterogeneous Reliabilities.” International Journal of Production Research 55 (10): 2806–2828.10.1080/00207543.2016.1213449
-
(2017)
International Journal of Production Research
, vol.55
, Issue.10
, pp. 2806-2828
-
-
Shoval, S.1
Efatmaneshnik, M.2
Ryan, M.J.3
-
17
-
-
85060900642
-
Since Auto Manufacturing Testing Calculation
-
Beijing University of Science and Technology,. (in Chinese
-
Wang, Z. H., 2000. “Since Auto Manufacturing Testing Calculation.” PhD Thesis, Beijing University of Science and Technology. (in Chinese)
-
(2000)
PhD Thesis
-
-
Wang, Z.H.1
-
18
-
-
60449103240
-
A Study on Measurement Fixture Design for Complex Deformable Sheet Metal Workpieces
-
Shanghai Jiaotong University,. (in Chinese
-
Wang, J., 2004. “A Study on Measurement Fixture Design for Complex Deformable Sheet Metal Workpieces.” PhD Thesis, Shanghai Jiaotong University. (in Chinese)
-
(2004)
PhD Thesis
-
-
Wang, J.1
-
19
-
-
84862638545
-
Assembly Sequence Optimization of Auto-Body Parts Based on Compliant Assembly Variation Analysis
-
Shanghai Jiaotong University,. (in Chinese
-
Xing, Y. F., 2008. “Assembly Sequence Optimization of Auto-Body Parts Based on Compliant Assembly Variation Analysis.” PhD Thesis, Shanghai Jiaotong University. (in Chinese)
-
(2008)
PhD Thesis
-
-
Xing, Y.F.1
-
20
-
-
84868703507
-
Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm
-
Xing, Y. F., and Y. S., Wang. 2012. “Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm.” International Journal of Production Research. 50 (24): 7303–7312.10.1080/00207543.2011.648276
-
(2012)
International Journal of Production Research.
, vol.50
, Issue.24
, pp. 7303-7312
-
-
Xing, Y.F.1
Wang, Y.S.2
-
21
-
-
84875887658
-
Fixture Layout Design Based on Two-Stage Method for Sheet Metal Components
-
Xing, Y. F., and Y. S., Wang. 2013. “Fixture Layout Design Based on Two-Stage Method for Sheet Metal Components.” Journal of Engineering Manufacture 227 (1): 162–172.10.1177/0954405412463132
-
(2013)
Journal of Engineering Manufacture
, vol.227
, Issue.1
, pp. 162-172
-
-
Xing, Y.F.1
Wang, Y.S.2
-
22
-
-
60449111271
-
Application of Response Surface Methodology Based on Radial Basis Function in Fixture Design
-
in Chinese), and
-
Xing, Y. F., S., Jin, X. M., Lai, and G. L., Chen. 2009. “Application of Response Surface Methodology Based on Radial Basis Function in Fixture Design.” Journal of Computer-Aided Design & Computer Graphics 21 (1): 101–106. (in Chinese)
-
(2009)
Journal of Computer-Aided Design & Computer Graphics
, vol.21
, Issue.1
, pp. 101-106
-
-
Xing, Y.F.1
Jin, S.2
Lai, X.M.3
Chen, G.L.4
|