메뉴 건너뛰기




Volumn 56, Issue 24, 2018, Pages 7190-7200

Clamping-sequence optimisation based on heuristic algorithm for sheet-metal components

Author keywords

design for assembly; design for manufacture; fixture design; optimisation; sequencing

Indexed keywords

DEFORMATION; FINITE ELEMENT METHOD; FIXTURES (TOOLING); HEURISTIC ALGORITHMS; MACHINE DESIGN; MANUFACTURE; OPTIMIZATION; SHEET METAL;

EID: 85037985201     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2017.1410245     Document Type: Article
Times cited : (7)

References (22)
  • 1
    • 85019557267 scopus 로고    scopus 로고
    • Improving the Migrating Birds Optimization Metaheuristic for the Permutation Flow Shop with Sequence-Dependent Set-up times
    • Benkalai, I., D., Rebaine, C., Gagné, and P., Baptiste. 2017. “Improving the Migrating Birds Optimization Metaheuristic for the Permutation Flow Shop with Sequence-Dependent Set-up times.” International Journal of Production Research 55 (20): 6145–6157.10.1080/00207543.2017.1327732
    • (2017) International Journal of Production Research , vol.55 , Issue.20 , pp. 6145-6157
    • Benkalai, I.1    Rebaine, D.2    Gagné, C.3    Baptiste, P.4
  • 2
    • 0030216880 scopus 로고    scopus 로고
    • Deformable Sheet Metal Fixturing: Principles, Algorithms and Simulations
    • Cai, W., S. J., Hu, and J. X., Yuan. 1996. “Deformable Sheet Metal Fixturing: Principles, Algorithms and Simulations.” Journal of Manufacturing Science and Engineering 118 (3): 318–324.10.1115/1.2831031
    • (1996) Journal of Manufacturing Science and Engineering , vol.118 , Issue.3 , pp. 318-324
    • Cai, W.1    Hu, S.J.2    Yuan, J.X.3
  • 3
    • 23344435792 scopus 로고    scopus 로고
    • Impact of Fixture Design on Sheet Metal Assembly Variation
    • Camelio, J. A., S. J., Hu, and D., Ceglarek. 2004. “Impact of Fixture Design on Sheet Metal Assembly Variation.” Journal of Manufacturing Systems 23 (3): 182–193.10.1016/S0278-6125(05)00006-3
    • (2004) Journal of Manufacturing Systems , vol.23 , Issue.3 , pp. 182-193
    • Camelio, J.A.1    Hu, S.J.2    Ceglarek, D.3
  • 4
    • 84981736269 scopus 로고    scopus 로고
    • Use of the Manufacturing System Design Decomposition for Comparative Analysis and Effective Design of Production Systems
    • Cochran, D. S., J. T., Foley, and Z. M., Bi. 2017. “Use of the Manufacturing System Design Decomposition for Comparative Analysis and Effective Design of Production Systems.” International Journal of Production Research 55 (3): 870–890.10.1080/00207543.2016.1218088
    • (2017) International Journal of Production Research , vol.55 , Issue.3 , pp. 870-890
    • Cochran, D.S.1    Foley, J.T.2    Bi, Z.M.3
  • 5
    • 0026955409 scopus 로고
    • The Importance of the Application Sequence of Clamping Forces on Workpiece Accuracy
    • Cogun, C., 1992. “The Importance of the Application Sequence of Clamping Forces on Workpiece Accuracy.” Transactions of the ASME Journal of Engineering for Industry 114 (4): 539–543.10.1115/1.2900709
    • (1992) Transactions of the ASME Journal of Engineering for Industry , vol.114 , Issue.4 , pp. 539-543
    • Cogun, C.1
  • 6
    • 0035341665 scopus 로고    scopus 로고
    • A Model to Predict Minimum Required Clamp Pre-Loads in Light of Fixture–Workpiece Compliance
    • De Meter, E. C., W., Xie, and S., Choudhuri. 2001. “A Model to Predict Minimum Required Clamp Pre-Loads in Light of Fixture–Workpiece Compliance.” International Journal of Machine Tools & Manufacture 41 (7): 1031–1054.10.1016/S0890-6955(00)00114-0
    • (2001) International Journal of Machine Tools & Manufacture , vol.41 , Issue.7 , pp. 1031-1054
    • De Meter, E.C.1    Xie, W.2    Choudhuri, S.3
  • 7
    • 1942507931 scopus 로고    scopus 로고
    • Finite Element Simulation for Optimal Clamping Scheme of Thin-Walled Workpiece in Milling Process
    • Dong, H. Y., and Y. L., Ke. 2004. “Finite Element Simulation for Optimal Clamping Scheme of Thin-Walled Workpiece in Milling Process.” Journal of Zhejiang University (Engineering Science) 38 (1): 17–21
    • (2004) Journal of Zhejiang University (Engineering Science) , vol.38 , Issue.1 , pp. 17-21
    • Dong, H.Y.1    Ke, Y.L.2
  • 8
    • 0036430215 scopus 로고    scopus 로고
    • Computer‐Aided Fixture Design Verification
    • Kang, Y. Z., Y. M., Rong, J. C., Yang, and W., Ma. 2002. “Computer‐Aided Fixture Design Verification.” Assembly Automation 22 (4): 350–359.10.1108/01445150210446229
    • (2002) Assembly Automation , vol.22 , Issue.4 , pp. 350-359
    • Kang, Y.Z.1    Rong, Y.M.2    Yang, J.C.3    Ma, W.4
  • 9
    • 85021147563 scopus 로고    scopus 로고
    • An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-Dependent Set-Ups in Parallel Disassembly Environment
    • Forthcoming
    • Kim, H. W., and D. H., Lee. Forthcoming. “An Optimal Algorithm for Selective Disassembly Sequencing with Sequence-Dependent Set-Ups in Parallel Disassembly Environment.” International Journal of Production Research. doi:10.1080/00207543.2017.1342879
    • International Journal of Production Research
    • Kim, H.W.1    Lee, D.H.2
  • 10
    • 70449574338 scopus 로고    scopus 로고
    • Optimisation of Assembly Sequences for Compliant Body Assemblies
    • Lai, X. M., Y. F., Xing, J., Sun, and G. L., Chen. 2009. “Optimisation of Assembly Sequences for Compliant Body Assemblies.” International Journal of Production Research 47 (21): 6129–6143.10.1080/00207540802172037
    • (2009) International Journal of Production Research , vol.47 , Issue.21 , pp. 6129-6143
    • Lai, X.M.1    Xing, Y.F.2    Sun, J.3    Chen, G.L.4
  • 11
    • 0036487119 scopus 로고    scopus 로고
    • Fixturing Analysis for Stability Consideration in an Automated Fixture Design System
    • Liao, J. M., 2002. “Fixturing Analysis for Stability Consideration in an Automated Fixture Design System.” Journal of Manufacturing Science and Engineering 124 (2): 98–104
    • (2002) Journal of Manufacturing Science and Engineering , vol.124 , Issue.2 , pp. 98-104
    • Liao, J.M.1
  • 12
    • 0033897321 scopus 로고    scopus 로고
    • Flexible Multibody Dynamics Based Fixture-Workpiece Analysis Model for Fixturing Stability
    • Liao, Y. J. G., and S. J., Hu. 2000. “Flexible Multibody Dynamics Based Fixture-Workpiece Analysis Model for Fixturing Stability.” International Journal of Machine Tools & Manufacture 40 (3): 343–362.10.1016/S0890-6955(99)00067-X
    • (2000) International Journal of Machine Tools & Manufacture , vol.40 , Issue.3 , pp. 343-362
    • Liao, Y.J.G.1    Hu, S.J.2
  • 13
    • 85060899881 scopus 로고    scopus 로고
    • Automotive Covering Parts of Springback Defect Analysis
    • Liu, S. R., and J. S., Lian. 1997. “Automotive Covering Parts of Springback Defect Analysis.” Automotive Technology 7 (1997): 39–43
    • (1997) Automotive Technology , vol.7 , Issue.1997 , pp. 39-43
    • Liu, S.R.1    Lian, J.S.2
  • 14
    • 25844528207 scopus 로고    scopus 로고
    • Modeling and Application of Workpiece Stability Based on the Linear Programming Method
    • Qin, G. H., W. H., Zhang, and M., Wang. 2005. “Modeling and Application of Workpiece Stability Based on the Linear Programming Method.” Chinese Journal of Mechanical Engineering 41 (9): 33–41.10.3901/JME.2005.09.033
    • (2005) Chinese Journal of Mechanical Engineering , vol.41 , Issue.9 , pp. 33-41
    • Qin, G.H.1    Zhang, W.H.2    Wang, M.3
  • 15
    • 0345867213 scopus 로고    scopus 로고
    • Analysis of the Effects of Fixture Clamping Sequence on Part Location Errors
    • Raghu, A., and S. N., Melkote. 2004. “Analysis of the Effects of Fixture Clamping Sequence on Part Location Errors.” International Journal of Machine Tools & Manufacture 44 (4): 373–382.10.1016/j.ijmachtools.2003.10.015
    • (2004) International Journal of Machine Tools & Manufacture , vol.44 , Issue.4 , pp. 373-382
    • Raghu, A.1    Melkote, S.N.2
  • 16
    • 84980347773 scopus 로고    scopus 로고
    • Assembly Sequence Planning for Processes with Heterogeneous Reliabilities
    • Shoval, S., M., Efatmaneshnik, and M. J., Ryan. 2017. “Assembly Sequence Planning for Processes with Heterogeneous Reliabilities.” International Journal of Production Research 55 (10): 2806–2828.10.1080/00207543.2016.1213449
    • (2017) International Journal of Production Research , vol.55 , Issue.10 , pp. 2806-2828
    • Shoval, S.1    Efatmaneshnik, M.2    Ryan, M.J.3
  • 17
    • 85060900642 scopus 로고    scopus 로고
    • Since Auto Manufacturing Testing Calculation
    • Beijing University of Science and Technology,. (in Chinese
    • Wang, Z. H., 2000. “Since Auto Manufacturing Testing Calculation.” PhD Thesis, Beijing University of Science and Technology. (in Chinese)
    • (2000) PhD Thesis
    • Wang, Z.H.1
  • 18
    • 60449103240 scopus 로고    scopus 로고
    • A Study on Measurement Fixture Design for Complex Deformable Sheet Metal Workpieces
    • Shanghai Jiaotong University,. (in Chinese
    • Wang, J., 2004. “A Study on Measurement Fixture Design for Complex Deformable Sheet Metal Workpieces.” PhD Thesis, Shanghai Jiaotong University. (in Chinese)
    • (2004) PhD Thesis
    • Wang, J.1
  • 19
    • 84862638545 scopus 로고    scopus 로고
    • Assembly Sequence Optimization of Auto-Body Parts Based on Compliant Assembly Variation Analysis
    • Shanghai Jiaotong University,. (in Chinese
    • Xing, Y. F., 2008. “Assembly Sequence Optimization of Auto-Body Parts Based on Compliant Assembly Variation Analysis.” PhD Thesis, Shanghai Jiaotong University. (in Chinese)
    • (2008) PhD Thesis
    • Xing, Y.F.1
  • 20
    • 84868703507 scopus 로고    scopus 로고
    • Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm
    • Xing, Y. F., and Y. S., Wang. 2012. “Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm.” International Journal of Production Research. 50 (24): 7303–7312.10.1080/00207543.2011.648276
    • (2012) International Journal of Production Research. , vol.50 , Issue.24 , pp. 7303-7312
    • Xing, Y.F.1    Wang, Y.S.2
  • 21
    • 84875887658 scopus 로고    scopus 로고
    • Fixture Layout Design Based on Two-Stage Method for Sheet Metal Components
    • Xing, Y. F., and Y. S., Wang. 2013. “Fixture Layout Design Based on Two-Stage Method for Sheet Metal Components.” Journal of Engineering Manufacture 227 (1): 162–172.10.1177/0954405412463132
    • (2013) Journal of Engineering Manufacture , vol.227 , Issue.1 , pp. 162-172
    • Xing, Y.F.1    Wang, Y.S.2
  • 22
    • 60449111271 scopus 로고    scopus 로고
    • Application of Response Surface Methodology Based on Radial Basis Function in Fixture Design
    • in Chinese), and
    • Xing, Y. F., S., Jin, X. M., Lai, and G. L., Chen. 2009. “Application of Response Surface Methodology Based on Radial Basis Function in Fixture Design.” Journal of Computer-Aided Design & Computer Graphics 21 (1): 101–106. (in Chinese)
    • (2009) Journal of Computer-Aided Design & Computer Graphics , vol.21 , Issue.1 , pp. 101-106
    • Xing, Y.F.1    Jin, S.2    Lai, X.M.3    Chen, G.L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.