-
1
-
-
0001298655
-
Locating point synthesis in fixture design
-
Menassa, R.J., and DeVries, W.R., 1989, "Locating Point Synthesis in Fixture Design," CIRP Ann., 38/1, pp. 165-169.
-
(1989)
CIRP Ann.
, vol.38
, Issue.1
, pp. 165-169
-
-
Menassa, R.J.1
DeVries, W.R.2
-
2
-
-
45549110689
-
A framework for a rule-based expert fixturing system for face milling planar surfaces on a CAD system using flexible fixtures
-
Nnaji, B.O., Alladin, S., and Lyu, P., 1988, "A Framework for a Rule-based Expert Fixturing System for Face Milling Planar Surfaces on a CAD System Using Flexible Fixtures," J. Manuf. Syst., 7, No. 3, pp. 193-207.
-
(1988)
J. Manuf. Syst.
, vol.7
, Issue.3
, pp. 193-207
-
-
Nnaji, B.O.1
Alladin, S.2
Lyu, P.3
-
3
-
-
0026902046
-
An automatic workholding verification system
-
Trappey, J.C., and Liu, C.R., 1992, "An Automatic Workholding Verification System," Rob. Comput.-Integr. Manufact., 9, No. 4/5, pp. 321-326.
-
(1992)
Rob. Comput.-Integr. Manufact.
, vol.9
, Issue.4-5
, pp. 321-326
-
-
Trappey, J.C.1
Liu, C.R.2
-
4
-
-
0031995184
-
Automated modular fixture planning: Accuracy, clamping, and accessibility analyses
-
Feb.
-
Wu, Y., Rong, Y., Ma, W., and LeClair, S.R., 1998, "Automated Modular Fixture Planning: Accuracy, Clamping, and Accessibility Analyses," Rob. Comput.-Integr. Manufact., 14, No. 1, pp. 17-26, Feb.
-
(1998)
Rob. Comput.-Integr. Manufact.
, vol.14
, Issue.1
, pp. 17-26
-
-
Wu, Y.1
Rong, Y.2
Ma, W.3
Leclair, S.R.4
-
5
-
-
0022074551
-
Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures
-
Asada, H., and By, A., 1985, "Kinematic Analysis of Workpart Fixturing for Flexible Assembly with Automatically Reconfigurable Fixtures," IEEE Journal of Robotics and Automation, RA-1, No. 2.
-
(1985)
IEEE Journal of Robotics and Automation
, vol.RA-1
, Issue.2
-
-
Asada, H.1
By, A.2
-
6
-
-
0024771578
-
A mathematical approach to automatic configuration of machining fixtures: Analysis and synthesis
-
Chou, Y.C., Chandru, V., and Barash, M.M., 1989, "A Mathematical Approach to Automatic Configuration of Machining Fixtures: Analysis and Synthesis," ASME J. Eng. Ind., 111, pp. 299-306.
-
(1989)
ASME J. Eng. Ind.
, vol.111
, pp. 299-306
-
-
Chou, Y.C.1
Chandru, V.2
Barash, M.M.3
-
7
-
-
0027681460
-
An integrated fixture planning and analysis system for machining processes
-
Fuh, J.Y.H., Chang, C.H., and Melkanoff, M.A., 1993, "An Integrated Fixture Planning and Analysis System for Machining Processes," Rob. Comput.-Integr. Manufact., 10, No. 5, pp. 339-353.
-
(1993)
Rob. Comput.-Integr. Manufact.
, vol.10
, Issue.5
, pp. 339-353
-
-
Fuh, J.Y.H.1
Chang, C.H.2
Melkanoff, M.A.3
-
8
-
-
0000517925
-
Verification and optimization of workholding schemes for fixture design
-
Fuh, J.Y.H., and Nee, A.Y.C., 1994, "Verification and Optimization of Workholding Schemes for Fixture Design," Journal of Design and Manufacturing, 4, pp. 307-318.
-
(1994)
Journal of Design and Manufacturing
, vol.4
, pp. 307-318
-
-
Fuh, J.Y.H.1
Nee, A.Y.C.2
-
9
-
-
44949282945
-
Dynamic modeling of the fixture-workpiece system
-
Mittal, R.O., Cohen, P.H., and Gilmore, B.J., 1991, "Dynamic Modeling of the Fixture-Workpiece System," Rob. Comput.-Integr. Manufact., 8, No. 4, pp. 201-217.
-
(1991)
Rob. Comput.-Integr. Manufact.
, vol.8
, Issue.4
, pp. 201-217
-
-
Mittal, R.O.1
Cohen, P.H.2
Gilmore, B.J.3
-
10
-
-
0032669538
-
Automatic generation of dynamic clamping forces for machining fixtures
-
Tan, Z.J., Kumar, S.A., and Nee, A.Y.C., 1999, "Automatic Generation of Dynamic Clamping Forces for Machining Fixtures," Int. J. Prod. Res., 37, No. 12, pp. 2755-2776.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.12
, pp. 2755-2776
-
-
Tan, Z.J.1
Kumar, S.A.2
Nee, A.Y.C.3
-
12
-
-
0028424706
-
Restraint analysis of fixtures which rely on surface contact
-
May
-
DeMeter, E.C., 1994, "Restraint Analysis of Fixtures Which Rely on Surface Contact," ASME J. Eng. Ind., 116, pp. 207-215, May.
-
(1994)
ASME J. Eng. Ind.
, vol.116
, pp. 207-215
-
-
Demeter, E.C.1
|