-
1
-
-
23844558161
-
Designing for Assembly Quality: Strategies, Guidelines and Techniques
-
Booker, J. D., K. G., Swift, and N. J., Brown. 2005. “Designing for Assembly Quality:Strategies, Guidelines and Techniques.” Journal of Engineering Design 16 (3):279–295.10.1080/09544820500126672
-
(2005)
Journal of Engineering Design
, vol.16
, Issue.3
, pp. 279-295
-
-
Booker, J.D.1
Swift, K.G.2
Brown, N.J.3
-
2
-
-
84979208075
-
Design for Manual Handling and Assembly
-
Amherst: Department of Mechanical Engineering, University of Massachusetts
-
Boothroyd, G., 1979. “Design for Manual Handling and Assembly.” In Report No. 4. Amherst:Department of Mechanical Engineering, University of Massachusetts.
-
(1979)
Report No. 4
-
-
Boothroyd, G.1
-
5
-
-
0042262321
-
Design for Assembly: The Road to Higher Productivity
-
Boothroyd, Geoffrey. 1982. “Design for Assembly:The Road to Higher Productivity.” Assembly Engineering 25 (3):21–29.
-
(1982)
Assembly Engineering
, vol.25
, Issue.3
, pp. 21-29
-
-
Boothroyd, G.1
-
7
-
-
0004582105
-
DFA at Ford Motor Company
-
Burke, G. J., and J. B., Carlson. 1989. “DFA at Ford Motor Company.” DFMA Insight 1 (4).
-
(1989)
DFMA Insight
, vol.1
, Issue.4
-
-
Burke, G.J.1
Carlson, J.B.2
-
8
-
-
79751537157
-
Multi-objective Optimization of a Stochastic Assembly Line Balancing: A Hybrid Simulated Annealing Algorithm
-
Cakir, Burcin, Fulya, Altiparmak, and Berna, Dengiz. 2011. “Multi-objective Optimization of a Stochastic Assembly Line Balancing:A Hybrid Simulated Annealing Algorithm.” Computers & Industrial Engineering 60 (3):376–384. doi:10.1016/j.cie.2010.08.013.
-
(2011)
Computers & Industrial Engineering
, vol.60
, Issue.3
, pp. 376-384
-
-
Cakir, B.1
Altiparmak, F.2
Dengiz, B.3
-
9
-
-
36348942008
-
-
Concorde. 2011. “Concorde TSP Solver.” http://www.math.uwaterloo.ca/tsp/concorde.html.
-
(2011)
Concorde TSP Solver
-
-
-
11
-
-
84911985273
-
Balancing and Sequencing of Stochastic Mixed-model Assembly U-lines to Minimise the Expectation of Work Overload Time
-
Dong, Jietao, Linxuan, Zhang, Tianyuan, Xiao, and Huachao, Mao. 2014. “Balancing and Sequencing of Stochastic Mixed-model Assembly U-lines to Minimise the Expectation of Work Overload Time.” International Journal of Production Research 52 (24):7529–7548.10.1080/00207543.2014.944280
-
(2014)
International Journal of Production Research
, vol.52
, Issue.24
, pp. 7529-7548
-
-
Dong, J.1
Zhang, L.2
Xiao, T.3
Mao, H.4
-
12
-
-
84922882972
-
On Optimal Modularity for System Construction
-
Efatmaneshnik, Mahmoud, and Michael J., Ryan. 2015. “On Optimal Modularity for System Construction.” Complexity 21 (5):176–189. doi:10.1002/cplx.21646.
-
(2015)
Complexity
, vol.21
, Issue.5
, pp. 176-189
-
-
Efatmaneshnik, M.1
Ryan, M.J.2
-
13
-
-
27744559270
-
Stochastic Assembly Line Balancing using Beam Search
-
Erel, E., I., Sabuncuoglu, and H., Sekerci. 2005. “Stochastic Assembly Line Balancing using Beam Search.” International Journal of Production Research 43 (7):1411–1426.10.1080/00207540412331320526
-
(2005)
International Journal of Production Research
, vol.43
, Issue.7
, pp. 1411-1426
-
-
Erel, E.1
Sabuncuoglu, I.2
Sekerci, H.3
-
14
-
-
0242721158
-
Intelligent Virtual Assembly Planning with Integrated Assembly Model
-
Washington, DC:
-
Fan, Jing, and Jinxiang, Dong. 2003. “Intelligent Virtual Assembly Planning with Integrated Assembly Model.” IEEE International Conference on Systems, Man and Cybernetics, Washington, DC.
-
(2003)
IEEE International Conference on Systems, Man and Cybernetics
-
-
Fan, J.1
Dong, J.2
-
15
-
-
0023537240
-
Simplified Generation of All Mechanical Assembly Sequences
-
De Fazio, Thomas L., and Daniel E., Whitney. 1987. “Simplified Generation of All Mechanical Assembly Sequences.” IEEE Journal on Robotics and Automation 3 (6):640–658.10.1109/JRA.1987.1087132
-
(1987)
IEEE Journal on Robotics and Automation
, vol.3
, Issue.6
, pp. 640-658
-
-
De Fazio, T.L.1
Whitney, D.E.2
-
16
-
-
84908192508
-
Study on the Theory, Method and Model for Mechanical Dynamic Assembly Reliability Optimization
-
Fei, Chengwei, Wenzhong, Tang, and Guangchen, Bai. 2014. “Study on the Theory, Method and Model for Mechanical Dynamic Assembly Reliability Optimization.” Proceedings of the Institution of Mechanical Engineers, Part C:Journal of Mechanical Engineering Science 228 (16):3019–3038. doi:10.1177/0954406214525137.
-
(2014)
Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science
, vol.228
, Issue.16
, pp. 3019-3038
-
-
Fei, C.1
Tang, W.2
Bai, G.3
-
18
-
-
84870419286
-
Stability Measure for a Generalized Assembly Line Balancing Problem
-
Gurevsky, Evgeny, Olga, Battaïa, and Alexandre, Dolgui. 2013. “Stability Measure for a Generalized Assembly Line Balancing Problem.” Discrete Applied Mathematics 161 (3):377–394. doi:10.1016/j.dam.2012.08.037.
-
(2013)
Discrete Applied Mathematics
, vol.161
, Issue.3
, pp. 377-394
-
-
Gurevsky, E.1
Battaïa, O.2
Dolgui, A.3
-
19
-
-
84876104666
-
Assembly Line Balancing under Uncertainty: Robust Optimization Models and Exact Solution Method
-
Hazır, Öncü, and Alexandre, Dolgui. 2013. “Assembly Line Balancing under Uncertainty:Robust Optimization Models and Exact Solution Method.” Computers & Industrial Engineering 65 (2):261–267. doi:10.1016/j.cie.2013.03.004.
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.2
, pp. 261-267
-
-
Hazır, Ö.1
Dolgui, A.2
-
20
-
-
77953227821
-
American Manufacturing Fights Back
-
Henchy, L. W., 1988. “American Manufacturing Fights Back.” Business Solutions, February 22, 10.
-
(1988)
Business Solutions
, pp. 10
-
-
Henchy, L.W.1
-
21
-
-
84942510792
-
Assembly Sequences, Assembly Constraints, Precedence Graphs
-
Besancon:
-
Henrioud, Jean-Michel, Laurent, Relange, and Christophe, Perrard. 2003. “Assembly Sequences, Assembly Constraints, Precedence Graphs.” Proceedings of the IEEE International Symposium on Assembly and Task Planning, 2003, Besancon.
-
(2003)
Proceedings of the IEEE International Symposium on Assembly and Task Planning, 2003
-
-
Henrioud, J.-M.1
Relange, L.2
Perrard, C.3
-
22
-
-
79952695482
-
Analytical Approximations to Predict Performance Measures of Markovian Type Manufacturing Systems with Job Failures and Parallel Processing
-
Hulett, Maria, and Purushothaman, Damodaran. 2011. “Analytical Approximations to Predict Performance Measures of Markovian Type Manufacturing Systems with Job Failures and Parallel Processing.” European Journal of Operational Research 212 (1):89–99.10.1016/j.ejor.2011.01.034
-
(2011)
European Journal of Operational Research
, vol.212
, Issue.1
, pp. 89-99
-
-
Hulett, M.1
Damodaran, P.2
-
23
-
-
0032312383
-
On Constraints in Assembly Planning
-
Jones, Rondall E., Randall H., Wilson, and Terri L., Calton. 1998. “On Constraints in Assembly Planning.” IEEE Transactions on Robotics and Automation 14 (6):849–863.10.1109/70.736770
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, Issue.6
, pp. 849-863
-
-
Jones, R.E.1
Wilson, R.H.2
Calton, T.L.3
-
24
-
-
56249109072
-
Binary Fuzzy Goal Programming Approach to Single Model Straight and U-shaped Assembly Line Balancing
-
Kara, Yakup, Turan, Paksoy, and Ching-Ter, Chang. 2009. “Binary Fuzzy Goal Programming Approach to Single Model Straight and U-shaped Assembly Line Balancing.” European Journal of Operational Research 195 (2):335–347. doi:10.1016/j.ejor.2008.01.003.
-
(2009)
European Journal of Operational Research
, vol.195
, Issue.2
, pp. 335-347
-
-
Kara, Y.1
Paksoy, T.2
Chang, C.-T.3
-
25
-
-
34247093754
-
Assembly Sequence Planning of Automobile Body Components Based on Liaison Graph
-
Karjalainen, Ilpo, Y., Xing, G., Chen, X., Lai, S., Jin, and J., Zhou. 2007. “Assembly Sequence Planning of Automobile Body Components Based on Liaison Graph.” Assembly Automation 27 (2):157–164.10.1108/01445150710733423
-
(2007)
Assembly Automation
, vol.27
, Issue.2
, pp. 157-164
-
-
Karjalainen, I.1
Xing, Y.2
Chen, G.3
Lai, X.4
Jin, S.5
Zhou, J.6
-
26
-
-
0003216869
-
The Particle Swarm: Social Adaptation in Information-Processing Systems
-
Corne D., Dorigo M., Glaover F., (eds), London, UK: McGraw-Hill
-
Kennedy, J., and Russell C., Eberhart. 1999. “The Particle Swarm:Social Adaptation in Information-Processing Systems.” In New Ideas in Optimization, editted by D., Corne, M., Dorigo, and F., Glaover, 379–387. London, UK:McGraw-Hill.
-
(1999)
New Ideas in Optimization
, pp. 379-387
-
-
Kennedy, J.1
Eberhart, R.C.2
-
28
-
-
70449574338
-
Optimisation of Assembly Sequences for Compliant Body Assemblies
-
Lai, Xin-Min, Yan-Feng, Xing, Jin, Sun, and Guan-Long, Chen. 2009. “Optimisation of Assembly Sequences for Compliant Body Assemblies.” International Journal of Production Research 47 (21):6129–6143.10.1080/00207540802172037
-
(2009)
International Journal of Production Research
, vol.47
, Issue.21
, pp. 6129-6143
-
-
Lai, X.-M.1
Xing, Y.-F.2
Sun, J.3
Chen, G.-L.4
-
30
-
-
77951584645
-
GAPP: A Generative Assembly Process Planner
-
Laperrière, Luc, and Hoda A., ElMaraghy. 1996. “GAPP:A Generative Assembly Process Planner.” Journal of Manufacturing Systems 15 (4):282–293.10.1016/0278-6125(96)84553-5
-
(1996)
Journal of Manufacturing Systems
, vol.15
, Issue.4
, pp. 282-293
-
-
Laperrière, L.1
ElMaraghy, H.A.2
-
31
-
-
0032046796
-
Automatic a Priori, a Posteriori or Appropriate Determination of Subassemblies
-
Mascle, C., 1998. “Automatic a Priori, a Posteriori or Appropriate Determination of Subassemblies.” International Journal of Production Research 36 (4):1001–1021. doi:10.1080/002075498193499
-
(1998)
International Journal of Production Research
, vol.36
, Issue.4
, pp. 1001-1021
-
-
Mascle, C.1
-
33
-
-
0141681206
-
A Hierarchical Approach to Generating Precedence Graphs for Assembly Planning
-
Niu, Xinwen, Han, Ding, and Youlun, Xiong. 2003. “A Hierarchical Approach to Generating Precedence Graphs for Assembly Planning.” International Journal of Machine Tools and Manufacture 43 (14):1473–1486.10.1016/S0890-6955(03)00168-8
-
(2003)
International Journal of Machine Tools and Manufacture
, vol.43
, Issue.14
, pp. 1473-1486
-
-
Niu, X.1
Ding, H.2
Xiong, Y.3
-
34
-
-
12144260436
-
Extended Assemblability Evaluation Method (AEM). Extended Quantitative Assembly Producibility Evaluation for Assembled Parts and Products
-
Ohashi, Toshijiro, Minoru, Iwata, Shoji, Arimoto, and Seii, Miyakawa. 2002. “Extended Assemblability Evaluation Method (AEM). Extended Quantitative Assembly Producibility Evaluation for Assembled Parts and Products.” JSME International Journal Series C 45 (2):567–574.10.1299/jsmec.45.567
-
(2002)
JSME International Journal Series C
, vol.45
, Issue.2
, pp. 567-574
-
-
Ohashi, T.1
Iwata, M.2
Arimoto, S.3
Miyakawa, S.4
-
35
-
-
78650589919
-
A Genetic Algorithm for the Stochastic Mixed-model U-line Balancing and Sequencing Problem
-
Özcan, Uğur, Talip, Kellegöz, and Bilal, Toklu. 2011. “A Genetic Algorithm for the Stochastic Mixed-model U-line Balancing and Sequencing Problem.” International Journal of Production Research 49 (6):1605–1626.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.6
, pp. 1605-1626
-
-
Özcan, U.1
Kellegöz, T.2
Toklu, B.3
-
36
-
-
33748705123
-
Case Study: The Impact of Assembly Reorientations on Assembly Time
-
Pan, Chunxia, and Shana, Smith. 2006. “Case Study:The Impact of Assembly Reorientations on Assembly Time.” International Journal of Production Research 44 (21):4569–4585.10.1080/00207540500534413
-
(2006)
International Journal of Production Research
, vol.44
, Issue.21
, pp. 4569-4585
-
-
Pan, C.1
Smith, S.2
-
37
-
-
85026336550
-
Variability Modelling and Balancing of Stochastic Assembly Lines
-
Pınarbaşı, Mehmet, Mustafa, Yüzükırmızı, and Bilal, Toklu. 2016. “Variability Modelling and Balancing of Stochastic Assembly Lines.” International Journal of Production Research:1–22. doi:10.1080/00207543.2016.117723610.1080/00207543.2016.1177236
-
(2016)
International Journal of Production Research
, pp. 1-22
-
-
Pınarbaşı, M.1
Yüzükırmızı, M.2
Toklu, B.3
-
38
-
-
60649114468
-
Performance Characterization of Complex Manufacturing Systems with General Distributions and Job Failures
-
Pradhan, Salil, and Purushothaman, Damodaran. 2009. “Performance Characterization of Complex Manufacturing Systems with General Distributions and Job Failures.” European Journal of Operational Research 197 (2):588–598.10.1016/j.ejor.2008.07.013
-
(2009)
European Journal of Operational Research
, vol.197
, Issue.2
, pp. 588-598
-
-
Pradhan, S.1
Damodaran, P.2
-
39
-
-
84867574651
-
Particle Swarm Optimization Algorithm to Maximize Assembly Efficiency
-
Raj, M. Victor, S., Saravana Sankar, and S. G., Ponnambalam. 2012. “Particle Swarm Optimization Algorithm to Maximize Assembly Efficiency.” The International Journal of Advanced Manufacturing Technology 59 (5–8):719–736.10.1007/s00170-011-3512-2
-
(2012)
The International Journal of Advanced Manufacturing Technology
, vol.59
, Issue.5-8
, pp. 719-736
-
-
Raj, M.V.1
Saravana Sankar, S.2
Ponnambalam, S.G.3
-
40
-
-
84979205270
-
-
9, Department of Mechanical Engineering, University of Massachusetts
-
Seth, B., and G., Boothroyd. 1979. “Design for Manual Handling.” In Report No. 9. Department of Mechanical Engineering, University of Massachusetts.
-
(1979)
Design for Manual Handling
-
-
Seth, B.1
Boothroyd, G.2
-
41
-
-
84907421515
-
Applying Case-based Reasoning in Assembly Sequence Planning
-
Su, Qiang. 2007a. “Applying Case-based Reasoning in Assembly Sequence Planning.” International Journal of Production Research 45 (1):29–47.10.1080/00207540600632182
-
(2007)
International Journal of Production Research
, vol.45
, Issue.1
, pp. 29-47
-
-
Su, Q.1
-
42
-
-
34250699017
-
Computer Aided Geometric Feasible Assembly Sequence Planning and Optimizing
-
Su, Qiang. 2007b. “Computer Aided Geometric Feasible Assembly Sequence Planning and Optimizing.” The International Journal of Advanced Manufacturing Technology 33 (1–2):48–57.10.1007/s00170-006-0447-0
-
(2007)
The International Journal of Advanced Manufacturing Technology
, vol.33
, Issue.1-2
, pp. 48-57
-
-
Su, Q.1
-
43
-
-
74549160325
-
3D Geometric Constraint Analysis and Its Application on the Spatial Assembly Sequence Planning
-
Su, Qiang, and Sheng-Jie, Lai. 2010. “3D Geometric Constraint Analysis and Its Application on the Spatial Assembly Sequence Planning.” International Journal of Production Research 48 (5):1395–1414.10.1080/00207540802353413
-
(2010)
International Journal of Production Research
, vol.48
, Issue.5
, pp. 1395-1414
-
-
Su, Q.1
Lai, S.-J.2
-
44
-
-
0042343735
-
Assembly Reliability Evaluation Method (AREM)
-
Suzuki, Tatsuya, Toshijiro, Ohashi, Masaaki, Asano, and T., Arai. 2003. “Assembly Reliability Evaluation Method (AREM).” CIRP Annals-Manufacturing Technology 52 (1):9–12.10.1016/S0007-8506(07)60518-6
-
(2003)
CIRP Annals-Manufacturing Technology
, vol.52
, Issue.1
, pp. 9-12
-
-
Suzuki, T.1
Ohashi, T.2
Asano, M.3
Arai, T.4
-
46
-
-
0029290107
-
Minimizing User Queries in Interactive Assembly Planning
-
Wilson, Randall H., 1995. “Minimizing User Queries in Interactive Assembly Planning.” IEEE Transactions on Robotics and Automation 11 (2):308–312.10.1109/70.370514
-
(1995)
IEEE Transactions on Robotics and Automation
, vol.11
, Issue.2
, pp. 308-312
-
-
Wilson, R.H.1
-
47
-
-
84868703507
-
Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm
-
Xing, Yanfeng, and Yansong, Wang. 2012. “Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm.” International Journal of Production Research 50 (24):7303–7312.10.1080/00207543.2011.648276
-
(2012)
International Journal of Production Research
, vol.50
, Issue.24
, pp. 7303-7312
-
-
Xing, Y.1
Wang, Y.2
-
49
-
-
0020891857
-
Effect of Part Symmetry on Manual Assembly Times
-
Yoosufani, Z., M., Ruddy, and G., Boothroyd. 1983. “Effect of Part Symmetry on Manual Assembly Times.” Journal of Manufacturing Systems 2 (2):189–195.10.1016/S0278-6125(83)80031-4
-
(1983)
Journal of Manufacturing Systems
, vol.2
, Issue.2
, pp. 189-195
-
-
Yoosufani, Z.1
Ruddy, M.2
Boothroyd, G.3
|