메뉴 건너뛰기




Volumn 55, Issue 10, 2017, Pages 2806-2828

Assembly sequence planning for processes with heterogeneous reliabilities

Author keywords

assembly; optimisation; reliability; sequencing; uncertainty

Indexed keywords

ASSEMBLY; COSTS; MACHINERY; OPTIMIZATION;

EID: 84980347773     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2016.1213449     Document Type: Article
Times cited : (17)

References (49)
  • 1
    • 23844558161 scopus 로고    scopus 로고
    • Designing for Assembly Quality: Strategies, Guidelines and Techniques
    • Booker, J. D., K. G., Swift, and N. J., Brown. 2005. “Designing for Assembly Quality:Strategies, Guidelines and Techniques.” Journal of Engineering Design 16 (3):279–295.10.1080/09544820500126672
    • (2005) Journal of Engineering Design , vol.16 , Issue.3 , pp. 279-295
    • Booker, J.D.1    Swift, K.G.2    Brown, N.J.3
  • 2
    • 84979208075 scopus 로고
    • Design for Manual Handling and Assembly
    • Amherst: Department of Mechanical Engineering, University of Massachusetts
    • Boothroyd, G., 1979. “Design for Manual Handling and Assembly.” In Report No. 4. Amherst:Department of Mechanical Engineering, University of Massachusetts.
    • (1979) Report No. 4
    • Boothroyd, G.1
  • 5
    • 0042262321 scopus 로고
    • Design for Assembly: The Road to Higher Productivity
    • Boothroyd, Geoffrey. 1982. “Design for Assembly:The Road to Higher Productivity.” Assembly Engineering 25 (3):21–29.
    • (1982) Assembly Engineering , vol.25 , Issue.3 , pp. 21-29
    • Boothroyd, G.1
  • 7
    • 0004582105 scopus 로고
    • DFA at Ford Motor Company
    • Burke, G. J., and J. B., Carlson. 1989. “DFA at Ford Motor Company.” DFMA Insight 1 (4).
    • (1989) DFMA Insight , vol.1 , Issue.4
    • Burke, G.J.1    Carlson, J.B.2
  • 8
    • 79751537157 scopus 로고    scopus 로고
    • Multi-objective Optimization of a Stochastic Assembly Line Balancing: A Hybrid Simulated Annealing Algorithm
    • Cakir, Burcin, Fulya, Altiparmak, and Berna, Dengiz. 2011. “Multi-objective Optimization of a Stochastic Assembly Line Balancing:A Hybrid Simulated Annealing Algorithm.” Computers & Industrial Engineering 60 (3):376–384. doi:10.1016/j.cie.2010.08.013.
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.3 , pp. 376-384
    • Cakir, B.1    Altiparmak, F.2    Dengiz, B.3
  • 9
    • 36348942008 scopus 로고    scopus 로고
    • Concorde. 2011. “Concorde TSP Solver.” http://www.math.uwaterloo.ca/tsp/concorde.html.
    • (2011) Concorde TSP Solver
  • 11
    • 84911985273 scopus 로고    scopus 로고
    • Balancing and Sequencing of Stochastic Mixed-model Assembly U-lines to Minimise the Expectation of Work Overload Time
    • Dong, Jietao, Linxuan, Zhang, Tianyuan, Xiao, and Huachao, Mao. 2014. “Balancing and Sequencing of Stochastic Mixed-model Assembly U-lines to Minimise the Expectation of Work Overload Time.” International Journal of Production Research 52 (24):7529–7548.10.1080/00207543.2014.944280
    • (2014) International Journal of Production Research , vol.52 , Issue.24 , pp. 7529-7548
    • Dong, J.1    Zhang, L.2    Xiao, T.3    Mao, H.4
  • 12
    • 84922882972 scopus 로고    scopus 로고
    • On Optimal Modularity for System Construction
    • Efatmaneshnik, Mahmoud, and Michael J., Ryan. 2015. “On Optimal Modularity for System Construction.” Complexity 21 (5):176–189. doi:10.1002/cplx.21646.
    • (2015) Complexity , vol.21 , Issue.5 , pp. 176-189
    • Efatmaneshnik, M.1    Ryan, M.J.2
  • 13
  • 15
    • 0023537240 scopus 로고
    • Simplified Generation of All Mechanical Assembly Sequences
    • De Fazio, Thomas L., and Daniel E., Whitney. 1987. “Simplified Generation of All Mechanical Assembly Sequences.” IEEE Journal on Robotics and Automation 3 (6):640–658.10.1109/JRA.1987.1087132
    • (1987) IEEE Journal on Robotics and Automation , vol.3 , Issue.6 , pp. 640-658
    • De Fazio, T.L.1    Whitney, D.E.2
  • 18
    • 84870419286 scopus 로고    scopus 로고
    • Stability Measure for a Generalized Assembly Line Balancing Problem
    • Gurevsky, Evgeny, Olga, Battaïa, and Alexandre, Dolgui. 2013. “Stability Measure for a Generalized Assembly Line Balancing Problem.” Discrete Applied Mathematics 161 (3):377–394. doi:10.1016/j.dam.2012.08.037.
    • (2013) Discrete Applied Mathematics , vol.161 , Issue.3 , pp. 377-394
    • Gurevsky, E.1    Battaïa, O.2    Dolgui, A.3
  • 19
    • 84876104666 scopus 로고    scopus 로고
    • Assembly Line Balancing under Uncertainty: Robust Optimization Models and Exact Solution Method
    • Hazır, Öncü, and Alexandre, Dolgui. 2013. “Assembly Line Balancing under Uncertainty:Robust Optimization Models and Exact Solution Method.” Computers & Industrial Engineering 65 (2):261–267. doi:10.1016/j.cie.2013.03.004.
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.2 , pp. 261-267
    • Hazır, Ö.1    Dolgui, A.2
  • 20
    • 77953227821 scopus 로고
    • American Manufacturing Fights Back
    • Henchy, L. W., 1988. “American Manufacturing Fights Back.” Business Solutions, February 22, 10.
    • (1988) Business Solutions , pp. 10
    • Henchy, L.W.1
  • 22
    • 79952695482 scopus 로고    scopus 로고
    • Analytical Approximations to Predict Performance Measures of Markovian Type Manufacturing Systems with Job Failures and Parallel Processing
    • Hulett, Maria, and Purushothaman, Damodaran. 2011. “Analytical Approximations to Predict Performance Measures of Markovian Type Manufacturing Systems with Job Failures and Parallel Processing.” European Journal of Operational Research 212 (1):89–99.10.1016/j.ejor.2011.01.034
    • (2011) European Journal of Operational Research , vol.212 , Issue.1 , pp. 89-99
    • Hulett, M.1    Damodaran, P.2
  • 24
    • 56249109072 scopus 로고    scopus 로고
    • Binary Fuzzy Goal Programming Approach to Single Model Straight and U-shaped Assembly Line Balancing
    • Kara, Yakup, Turan, Paksoy, and Ching-Ter, Chang. 2009. “Binary Fuzzy Goal Programming Approach to Single Model Straight and U-shaped Assembly Line Balancing.” European Journal of Operational Research 195 (2):335–347. doi:10.1016/j.ejor.2008.01.003.
    • (2009) European Journal of Operational Research , vol.195 , Issue.2 , pp. 335-347
    • Kara, Y.1    Paksoy, T.2    Chang, C.-T.3
  • 25
    • 34247093754 scopus 로고    scopus 로고
    • Assembly Sequence Planning of Automobile Body Components Based on Liaison Graph
    • Karjalainen, Ilpo, Y., Xing, G., Chen, X., Lai, S., Jin, and J., Zhou. 2007. “Assembly Sequence Planning of Automobile Body Components Based on Liaison Graph.” Assembly Automation 27 (2):157–164.10.1108/01445150710733423
    • (2007) Assembly Automation , vol.27 , Issue.2 , pp. 157-164
    • Karjalainen, I.1    Xing, Y.2    Chen, G.3    Lai, X.4    Jin, S.5    Zhou, J.6
  • 26
    • 0003216869 scopus 로고    scopus 로고
    • The Particle Swarm: Social Adaptation in Information-Processing Systems
    • Corne D., Dorigo M., Glaover F., (eds), London, UK: McGraw-Hill
    • Kennedy, J., and Russell C., Eberhart. 1999. “The Particle Swarm:Social Adaptation in Information-Processing Systems.” In New Ideas in Optimization, editted by D., Corne, M., Dorigo, and F., Glaover, 379–387. London, UK:McGraw-Hill.
    • (1999) New Ideas in Optimization , pp. 379-387
    • Kennedy, J.1    Eberhart, R.C.2
  • 28
    • 70449574338 scopus 로고    scopus 로고
    • Optimisation of Assembly Sequences for Compliant Body Assemblies
    • Lai, Xin-Min, Yan-Feng, Xing, Jin, Sun, and Guan-Long, Chen. 2009. “Optimisation of Assembly Sequences for Compliant Body Assemblies.” International Journal of Production Research 47 (21):6129–6143.10.1080/00207540802172037
    • (2009) International Journal of Production Research , vol.47 , Issue.21 , pp. 6129-6143
    • Lai, X.-M.1    Xing, Y.-F.2    Sun, J.3    Chen, G.-L.4
  • 30
    • 77951584645 scopus 로고    scopus 로고
    • GAPP: A Generative Assembly Process Planner
    • Laperrière, Luc, and Hoda A., ElMaraghy. 1996. “GAPP:A Generative Assembly Process Planner.” Journal of Manufacturing Systems 15 (4):282–293.10.1016/0278-6125(96)84553-5
    • (1996) Journal of Manufacturing Systems , vol.15 , Issue.4 , pp. 282-293
    • Laperrière, L.1    ElMaraghy, H.A.2
  • 31
    • 0032046796 scopus 로고    scopus 로고
    • Automatic a Priori, a Posteriori or Appropriate Determination of Subassemblies
    • Mascle, C., 1998. “Automatic a Priori, a Posteriori or Appropriate Determination of Subassemblies.” International Journal of Production Research 36 (4):1001–1021. doi:10.1080/002075498193499
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 1001-1021
    • Mascle, C.1
  • 33
    • 0141681206 scopus 로고    scopus 로고
    • A Hierarchical Approach to Generating Precedence Graphs for Assembly Planning
    • Niu, Xinwen, Han, Ding, and Youlun, Xiong. 2003. “A Hierarchical Approach to Generating Precedence Graphs for Assembly Planning.” International Journal of Machine Tools and Manufacture 43 (14):1473–1486.10.1016/S0890-6955(03)00168-8
    • (2003) International Journal of Machine Tools and Manufacture , vol.43 , Issue.14 , pp. 1473-1486
    • Niu, X.1    Ding, H.2    Xiong, Y.3
  • 34
    • 12144260436 scopus 로고    scopus 로고
    • Extended Assemblability Evaluation Method (AEM). Extended Quantitative Assembly Producibility Evaluation for Assembled Parts and Products
    • Ohashi, Toshijiro, Minoru, Iwata, Shoji, Arimoto, and Seii, Miyakawa. 2002. “Extended Assemblability Evaluation Method (AEM). Extended Quantitative Assembly Producibility Evaluation for Assembled Parts and Products.” JSME International Journal Series C 45 (2):567–574.10.1299/jsmec.45.567
    • (2002) JSME International Journal Series C , vol.45 , Issue.2 , pp. 567-574
    • Ohashi, T.1    Iwata, M.2    Arimoto, S.3    Miyakawa, S.4
  • 35
    • 78650589919 scopus 로고    scopus 로고
    • A Genetic Algorithm for the Stochastic Mixed-model U-line Balancing and Sequencing Problem
    • Özcan, Uğur, Talip, Kellegöz, and Bilal, Toklu. 2011. “A Genetic Algorithm for the Stochastic Mixed-model U-line Balancing and Sequencing Problem.” International Journal of Production Research 49 (6):1605–1626.
    • (2011) International Journal of Production Research , vol.49 , Issue.6 , pp. 1605-1626
    • Özcan, U.1    Kellegöz, T.2    Toklu, B.3
  • 36
    • 33748705123 scopus 로고    scopus 로고
    • Case Study: The Impact of Assembly Reorientations on Assembly Time
    • Pan, Chunxia, and Shana, Smith. 2006. “Case Study:The Impact of Assembly Reorientations on Assembly Time.” International Journal of Production Research 44 (21):4569–4585.10.1080/00207540500534413
    • (2006) International Journal of Production Research , vol.44 , Issue.21 , pp. 4569-4585
    • Pan, C.1    Smith, S.2
  • 37
  • 38
    • 60649114468 scopus 로고    scopus 로고
    • Performance Characterization of Complex Manufacturing Systems with General Distributions and Job Failures
    • Pradhan, Salil, and Purushothaman, Damodaran. 2009. “Performance Characterization of Complex Manufacturing Systems with General Distributions and Job Failures.” European Journal of Operational Research 197 (2):588–598.10.1016/j.ejor.2008.07.013
    • (2009) European Journal of Operational Research , vol.197 , Issue.2 , pp. 588-598
    • Pradhan, S.1    Damodaran, P.2
  • 40
    • 84979205270 scopus 로고
    • 9, Department of Mechanical Engineering, University of Massachusetts
    • Seth, B., and G., Boothroyd. 1979. “Design for Manual Handling.” In Report No. 9. Department of Mechanical Engineering, University of Massachusetts.
    • (1979) Design for Manual Handling
    • Seth, B.1    Boothroyd, G.2
  • 41
    • 84907421515 scopus 로고    scopus 로고
    • Applying Case-based Reasoning in Assembly Sequence Planning
    • Su, Qiang. 2007a. “Applying Case-based Reasoning in Assembly Sequence Planning.” International Journal of Production Research 45 (1):29–47.10.1080/00207540600632182
    • (2007) International Journal of Production Research , vol.45 , Issue.1 , pp. 29-47
    • Su, Q.1
  • 42
    • 34250699017 scopus 로고    scopus 로고
    • Computer Aided Geometric Feasible Assembly Sequence Planning and Optimizing
    • Su, Qiang. 2007b. “Computer Aided Geometric Feasible Assembly Sequence Planning and Optimizing.” The International Journal of Advanced Manufacturing Technology 33 (1–2):48–57.10.1007/s00170-006-0447-0
    • (2007) The International Journal of Advanced Manufacturing Technology , vol.33 , Issue.1-2 , pp. 48-57
    • Su, Q.1
  • 43
    • 74549160325 scopus 로고    scopus 로고
    • 3D Geometric Constraint Analysis and Its Application on the Spatial Assembly Sequence Planning
    • Su, Qiang, and Sheng-Jie, Lai. 2010. “3D Geometric Constraint Analysis and Its Application on the Spatial Assembly Sequence Planning.” International Journal of Production Research 48 (5):1395–1414.10.1080/00207540802353413
    • (2010) International Journal of Production Research , vol.48 , Issue.5 , pp. 1395-1414
    • Su, Q.1    Lai, S.-J.2
  • 44
    • 0042343735 scopus 로고    scopus 로고
    • Assembly Reliability Evaluation Method (AREM)
    • Suzuki, Tatsuya, Toshijiro, Ohashi, Masaaki, Asano, and T., Arai. 2003. “Assembly Reliability Evaluation Method (AREM).” CIRP Annals-Manufacturing Technology 52 (1):9–12.10.1016/S0007-8506(07)60518-6
    • (2003) CIRP Annals-Manufacturing Technology , vol.52 , Issue.1 , pp. 9-12
    • Suzuki, T.1    Ohashi, T.2    Asano, M.3    Arai, T.4
  • 46
    • 0029290107 scopus 로고
    • Minimizing User Queries in Interactive Assembly Planning
    • Wilson, Randall H., 1995. “Minimizing User Queries in Interactive Assembly Planning.” IEEE Transactions on Robotics and Automation 11 (2):308–312.10.1109/70.370514
    • (1995) IEEE Transactions on Robotics and Automation , vol.11 , Issue.2 , pp. 308-312
    • Wilson, R.H.1
  • 47
    • 84868703507 scopus 로고    scopus 로고
    • Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm
    • Xing, Yanfeng, and Yansong, Wang. 2012. “Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm.” International Journal of Production Research 50 (24):7303–7312.10.1080/00207543.2011.648276
    • (2012) International Journal of Production Research , vol.50 , Issue.24 , pp. 7303-7312
    • Xing, Y.1    Wang, Y.2
  • 48
    • 84979208078 scopus 로고
    • 2, Department of Mechanical Engineering, University of Massachusetts
    • Yoosufani, Z., and G., Boothroyd. 1978. “Design of Parts for Ease of Handling.” In Report No. 2. Department of Mechanical Engineering, University of Massachusetts.
    • (1978) Design of Parts for Ease of Handling
    • Yoosufani, Z.1    Boothroyd, G.2
  • 49
    • 0020891857 scopus 로고
    • Effect of Part Symmetry on Manual Assembly Times
    • Yoosufani, Z., M., Ruddy, and G., Boothroyd. 1983. “Effect of Part Symmetry on Manual Assembly Times.” Journal of Manufacturing Systems 2 (2):189–195.10.1016/S0278-6125(83)80031-4
    • (1983) Journal of Manufacturing Systems , vol.2 , Issue.2 , pp. 189-195
    • Yoosufani, Z.1    Ruddy, M.2    Boothroyd, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.