-
1
-
-
36849082395
-
A Survey of Scheduling Problems with Setup Times or Costs
-
Allahverdi, A., C. T., Ng, T. C. E., Cheng, and M. Y., Kovalyov. 2008. “A Survey of Scheduling Problems with Setup Times or Costs.” European Journal of Operational Research 187:985–1032.
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
2
-
-
84992315790
-
The Migrating Birds Optimization Metaheuristic for the Permutation Flow Shop with Sequence-dependent Setup Times
-
Troyes, France:
-
Benkalai, I., D., Rebaine, C., Gagné, and P., Baptiste. 2016. “The Migrating Birds Optimization Metaheuristic for the Permutation Flow Shop with Sequence-dependent Setup Times.” In 8th IFAC Conference on Manufacturing Modelling, Management and Control, Troyes, France.
-
(2016)
8th IFAC Conference on Manufacturing Modelling, Management and Control
-
-
Benkalai, I.1
Rebaine, D.2
Gagné, C.3
Baptiste, P.4
-
3
-
-
70449371161
-
Study on Heuristics for the Permutation Flowshop with Sequence Dependent Setup Times
-
Las Vegas, USA:
-
Dong, X., H., Huang, and P., Chen. 2009. “Study on Heuristics for the Permutation Flowshop with Sequence Dependent Setup Times.” In IEEE International Conference on Information Reuse & Integration, Las Vegas, USA.
-
(2009)
IEEE International Conference on Information Reuse & Integration
-
-
Dong, X.1
Huang, H.2
Chen, P.3
-
4
-
-
84865588127
-
Migrating Birds Optimization : A New Metaheuristic Approach and its Performance on Quadratic Assignment Problem
-
Duman, E., M., Uysal, and A., Fuat Alkaya. 2012. “Migrating Birds Optimization:A New Metaheuristic Approach and its Performance on Quadratic Assignment Problem.” Information Sciences 217:65–77.
-
(2012)
Information Sciences
, vol.217
, pp. 65-77
-
-
Duman, E.1
Uysal, M.2
Fuat Alkaya, A.3
-
5
-
-
77956815759
-
Wilcoxon-Mann-Whitney or t-test? On Assumptions for Hypothesis Tests and Multiple Interpretations of Decision Rules
-
Fay, M. P., and M. A., Proschan. 2010. “Wilcoxon-Mann-Whitney or t-test? On Assumptions for Hypothesis Tests and Multiple Interpretations of Decision Rules.” Statistic Surveys 4:1–39.
-
(2010)
Statistic Surveys
, vol.4
, pp. 1-39
-
-
Fay, M.P.1
Proschan, M.A.2
-
6
-
-
14644435008
-
Evolutionary Algorithms for Scheduling a Flow Shop Manufacturing Cell with Sequence Dependent Family Setups
-
França, P. M., J. N. D., Gupta, A. S., Mendes, P., Moscato, and K., Veltink. 2005. “Evolutionary Algorithms for Scheduling a Flow Shop Manufacturing Cell with Sequence Dependent Family Setups.” Computers and Industrial Engineering 48 (3):491–506.
-
(2005)
Computers and Industrial Engineering
, vol.48
, Issue.3
, pp. 491-506
-
-
França, P.M.1
Gupta, J.N.D.2
Mendes, A.S.3
Moscato, P.4
Veltink, K.5
-
7
-
-
0001596897
-
Empirical Analysis of Heuristics
-
Lawler E., Lenstra J.K., Rinnooy Kan A.H.G., Shmoys D.B., (eds), Chichester: Wiley
-
Golden, B. L., and W. R., Stewart. 1985. “Empirical Analysis of Heuristics.” In The Traveling Salesman Problem:A Guided Tour of Combinatorial Optimization, edited by E., Lawler, J. K., Lenstra, A. H. G., Rinnooy Kan and D. B., Shmoys, 207–249. Chichester:Wiley.
-
(1985)
The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization
, pp. 207-249
-
-
Golden, B.L.1
Stewart, W.R.2
-
9
-
-
0022677934
-
The Two-machine Sequence Dependent Flowshop Scheduling Problem
-
Gupta, J., and W., Darrow. 1986. “The Two-machine Sequence Dependent Flowshop Scheduling Problem.” European Journal of Operational Research 24:439–446.
-
(1986)
European Journal of Operational Research
, vol.24
, pp. 439-446
-
-
Gupta, J.1
Darrow, W.2
-
11
-
-
37349074079
-
Metaheuristics for Scheduling a Flowline Manufacturing Cell with Sequence Dependent Family Setup Times
-
Hendizadeh, S. H., H., Faramarzi, S. A., Mansouri, J. N. D., Gupta, and T. Y., ElMekkawy. 2008. “Metaheuristics for Scheduling a Flowline Manufacturing Cell with Sequence Dependent Family Setup Times.” International Journal of Production Economics 111 (2):593–605.
-
(2008)
International Journal of Production Economics
, vol.111
, Issue.2
, pp. 593-605
-
-
Hendizadeh, S.H.1
Faramarzi, H.2
Mansouri, S.A.3
Gupta, J.N.D.4
ElMekkawy, T.Y.5
-
12
-
-
84961373298
-
Genetic Algorithm Optimization of Flow Shop Scheduling Problem with Sequence Dependent Setup Time and Lot Splitting
-
Kumar, G., and S., Singhal. 2013. “Genetic Algorithm Optimization of Flow Shop Scheduling Problem with Sequence Dependent Setup Time and Lot Splitting.” International Journal of Engineering, Business and Enterprise Applications 4 (1):62–71.
-
(2013)
International Journal of Engineering, Business and Enterprise Applications
, vol.4
, Issue.1
, pp. 62-71
-
-
Kumar, G.1
Singhal, S.2
-
13
-
-
79951720782
-
Applying Multi-start Simulated Annealing to Schedule a Flowline Manufacturing Cell with Sequence Dependent Family Setup Times
-
Lin, S.-W., K.-C., Ying, C.-C., Lu, and J. N. D., Gupta. 2011. “Applying Multi-start Simulated Annealing to Schedule a Flowline Manufacturing Cell with Sequence Dependent Family Setup Times.” International Journal of Production Economics 130:246–254.
-
(2011)
International Journal of Production Economics
, vol.130
, pp. 246-254
-
-
Lin, S.-W.1
Ying, K.-C.2
Lu, C.-C.3
Gupta, J.N.D.4
-
14
-
-
0020699921
-
A Heuristic Algorithm for the m-machine n-job Flow-shop Sequencing Problem
-
Nawaz, M., E., Enscore Jr., and I., Ham. 1983. “A Heuristic Algorithm for the m-machine n-job Flow-shop Sequencing Problem.” Omega -- The International Journal of Management Science 11:91–95.
-
(1983)
Omega -- The International Journal of Management Science
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.2
Ham, I.3
-
15
-
-
0004012817
-
-
Department of Industrial Engineering and Management Sciences, Northwestern University, Evanston, IL:
-
Or, I., 1976. “Traveling Salesman-type Combinatorial Problems and their Relation to the Logistics of Regional Blood Banking.” PhD diss., Department of Industrial Engineering and Management Sciences, Northwestern University, Evanston, IL.
-
(1976)
Traveling Salesman-type Combinatorial Problems and their Relation to the Logistics of Regional Blood Banking
-
-
Or, I.1
-
17
-
-
84992382555
-
Nature-inspired Metaheuristic Optimization Technique-migrating Birds Optimization in Industrial Scheduling Problem
-
Ramanathan, L., and K., Ulaganathan. 2014. “Nature-inspired Metaheuristic Optimization Technique-migrating Birds Optimization in Industrial Scheduling Problem.” SSRG International Journal of Industrial Engineering (SSRG-IJIE) 1 (3):1–6.
-
(2014)
SSRG International Journal of Industrial Engineering (SSRG-IJIE)
, vol.1
, Issue.3
, pp. 1-6
-
-
Ramanathan, L.1
Ulaganathan, K.2
-
19
-
-
12344285964
-
Solving the Flowshop Scheduling Problem with Sequence Dependent Setup Times using Advanced Metaheuristics
-
Ruiz, R., M., Concepción, and J., Alcaraz. 2004. “Solving the Flowshop Scheduling Problem with Sequence Dependent Setup Times using Advanced Metaheuristics.” European Journal of Operational Research 217:34–54.
-
(2004)
European Journal of Operational Research
, vol.217
, pp. 34-54
-
-
Ruiz, R.1
Concepción, M.2
Alcaraz, J.3
-
20
-
-
84881584265
-
An Iterated Greedy Algorithm for the Flowshop Problem with Sequence Dependent Setup Times
-
, Vienna, Austria:
-
Ruiz, R., and T., Stutzle. 2005. “An Iterated Greedy Algorithm for the Flowshop Problem with Sequence Dependent Setup Times.” In MIC2005. The 6th Metaheuristics International Conference, Vienna, Austria.
-
(2005)
MIC2005. The 6th Metaheuristics International Conference
-
-
Ruiz, R.1
Stutzle, T.2
-
21
-
-
84974553570
-
Migrating Birds Optimization for Flow Shop Sequencing Problem
-
Tongur, V., and E., Ulker. 2014. “Migrating Birds Optimization for Flow Shop Sequencing Problem.” Journal of Computer and Communications 2:142–147.
-
(2014)
Journal of Computer and Communications
, vol.2
, pp. 142-147
-
-
Tongur, V.1
Ulker, E.2
-
22
-
-
12344287600
-
-
Universidad Politecnica de Valencia, Valencia, Espana, Grupo de Investigation Operativa GIO
-
Vallada, E., R., Ruiz, and C., Maroto. 2003. Synthetic and Real Benchmarks for Complex Flow-shop Problems. Technical report. Universidad Politecnica de Valencia, Valencia, Espana, Grupo de Investigation Operativa GIO.
-
(2003)
Synthetic and Real Benchmarks for Complex Flow-shop Problems
-
-
Vallada, E.1
Ruiz, R.2
Maroto, C.3
|