-
1
-
-
84867833902
-
Ford motor company implements integrated planning and scheduling in a complex automotive manufacturing environment
-
Barlatt AY, Cohn A, Gusikhin O, Fradkin Y, Davidson R, Batey J (2012) Ford motor company implements integrated planning and scheduling in a complex automotive manufacturing environment. Interfaces 42(5):478-491
-
(2012)
Interfaces
, vol.42
, Issue.5
, pp. 478-491
-
-
Barlatt, A.Y.1
Cohn, A.2
Gusikhin, O.3
Fradkin, Y.4
Davidson, R.5
Batey, J.6
-
2
-
-
34249770043
-
SIMULEX - A multiattribute DSS to solve rescheduling problems
-
Belz R, Mertens P (1994) SIMULEX - a multiattribute DSS to solve rescheduling problems. Annals of Operations Research 52(3):107-129
-
(1994)
Annals of Operations Research
, vol.52
, Issue.3
, pp. 107-129
-
-
Belz, R.1
Mertens, P.2
-
3
-
-
84872587594
-
Variable neighborhood search-based subproblem solution procedures for a parallel shifting bottleneck heuristic for complex job shops
-
Seoul
-
Bilyk A, Mönch L (2012) Variable neighborhood search-based subproblem solution procedures for a parallel shifting bottleneck heuristic for complex job shops. In: Proc of IEEE conference on automation science and engineering, Seoul, pp 415-420
-
(2012)
Proc of IEEE Conference on Automation Science and Engineering
, pp. 415-420
-
-
Bilyk, A.1
Mönch, L.2
-
5
-
-
84867405503
-
A revolution in the warehouse: A retrospective on Kiva systems and the grand challenges ahead
-
D'Andrea R (2012) A revolution in the warehouse: a retrospective on Kiva systems and the grand challenges ahead. IEEE Transaction on Automation Science and Engineering 9(4):638-639
-
(2012)
IEEE Transaction on Automation Science and Engineering
, vol.9
, Issue.4
, pp. 638-639
-
-
D'Andrea, R.1
-
6
-
-
84876857684
-
IBM blends heuristics and optimization to plan its semiconductor supply chain
-
Degbotse A, Denton BT, Fordyce K, Milne RJ, Orzell R, Wang C-T (2013) IBM blends heuristics and optimization to plan its semiconductor supply chain. Interfaces 43(2):130-142
-
(2013)
Interfaces
, vol.43
, Issue.2
, pp. 130-142
-
-
Degbotse, A.1
Denton, B.T.2
Fordyce, K.3
Milne, R.J.4
Orzell, R.5
Wang, C.-T.6
-
8
-
-
84867379040
-
An integrated scheduling and material handling approach for complex job shops: A computational study
-
Driessel R, Mönch L (2012) An integrated scheduling and material handling approach for complex job shops: a computational study. International Journal of Production Research 50(20):5966-5985
-
(2012)
International Journal of Production Research
, vol.50
, Issue.20
, pp. 5966-5985
-
-
Driessel, R.1
Mönch, L.2
-
9
-
-
80054789931
-
Increasing stability of crew and aircraft schedules
-
Dück V, Ionescu L, Kliewer N, Suhl L (2012) Increasing stability of crew and aircraft schedules. Transportation Research Part C: Emerging Technologies 20(1):47-61
-
(2012)
Transportation Research Part C: Emerging Technologies
, vol.20
, Issue.1
, pp. 47-61
-
-
Dück, V.1
Ionescu, L.2
Kliewer, N.3
Suhl, L.4
-
10
-
-
84858033974
-
Towards a supply chain simulation reference model for the semiconductor industry
-
Phoenix, USA
-
Ehm H, Wenke H, Mönch L, Ponsignon T, Forstner L (2011) Towards a supply chain simulation reference model for the semiconductor industry. In: Proc of the 2011 winter simulation conference, Phoenix, USA, pp 2124-2135
-
(2011)
Proc of the 2011 Winter Simulation Conference
, pp. 2124-2135
-
-
Ehm, H.1
Wenke, H.2
Mönch, L.3
Ponsignon, T.4
Forstner, L.5
-
12
-
-
11144294952
-
Anwendung von Metaheuristiken zur Lösung betrieblicher Planungsprobleme - Potenziale und Grenzen einer softwaretechnischen Unterstützung
-
Fink A, Voß S (2003) Anwendung von Metaheuristiken zur Lösung betrieblicher Planungsprobleme - Potenziale und Grenzen einer softwaretechnischen Unterstützung. WIRTSCHAFTSINFORMATIK 45(4):395-407
-
(2003)
Wirtschaftsinformatik
, vol.45
, Issue.4
, pp. 395-407
-
-
Fink, A.1
Voß, S.2
-
13
-
-
84872686616
-
An ant-based coordination mechanism for resourceconstrained project scheduling with multiple agents and cash flow objectives
-
Fink A, Homberger J (2013) An ant-based coordination mechanism for resourceconstrained project scheduling with multiple agents and cash flow objectives. Flexible Services and Manufacturing Journal 25(1/2):94-121
-
(2013)
Flexible Services and Manufacturing Journal
, vol.25
, Issue.1-2
, pp. 94-121
-
-
Fink, A.1
Homberger, J.2
-
14
-
-
80054028347
-
Why it is so hard to build and validate discrete event simulation models of manufacturing facilities
-
Kempf K, Keskinocak P, Uzsoy R eds, Springer, Heidelberg
-
Fischbein SA, Yellig E (2011) Why it is so hard to build and validate discrete event simulation models of manufacturing facilities. In: Kempf K, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook, vol 2. Springer, Heidelberg, pp271-288
-
(2011)
Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook
, vol.2
, pp. 271-288
-
-
Fischbein, S.A.1
Yellig, E.2
-
15
-
-
80052039346
-
Uncertainty and production planning
-
Kempf K, Keskinocak P, Uzsoy R eds, Springer, Heidelberg
-
Graves SC (2010) Uncertainty and production planning. In: Kempf K, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook, vol 1. Springer, Heidelberg, pp 83-102
-
(2010)
Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook
, vol.1
, pp. 83-102
-
-
Graves, S.C.1
-
16
-
-
27844546861
-
The ANALYZE rulebase for supporting LP analysis
-
Greenberg HJ (1996) The ANALYZE rulebase for supporting LP analysis. Annals of Operations Research 65(1):91-126
-
(1996)
Annals of Operations Research
, vol.65
, Issue.1
, pp. 91-126
-
-
Greenberg, H.J.1
-
17
-
-
55349126329
-
Coca-Cola enterprises optimizes vehicle routes for efficient product delivery
-
Kant G, Jacks M, Aantjes C (2008) Coca-Cola enterprises optimizes vehicle routes for efficient product delivery. Interfaces 38(1):40-50
-
(2008)
Interfaces
, vol.38
, Issue.1
, pp. 40-50
-
-
Kant, G.1
Jacks, M.2
Aantjes, C.3
-
18
-
-
84886464496
-
Elicitating, modeling, and processing uncertain human preferences for software agents in electronic negotiations: An empirical study
-
Association for Information Systems
-
Lang F, Fink A, Schryen G (2012) Elicitating, modeling, and processing uncertain human preferences for software agents in electronic negotiations: an empirical study. In: Proc of the international conference on information systems (ICIS) 2012, Association for Information Systems
-
(2012)
Proc of the International Conference on Information Systems (ICIS) 2012
-
-
Lang, F.1
Fink, A.2
Schryen, G.3
-
19
-
-
79955776658
-
Matheuristics: Hybridizing metaheuristics and mathematical programming
-
Springer, Heidelberg
-
Maniezzo V, Stützle T, Voß S (eds) (2009) Matheuristics: hybridizing metaheuristics and mathematical programming. Annals of information systems, vol 10. Springer, Heidelberg
-
(2009)
Annals of Information Systems
, vol.10
-
-
Maniezzo, V.1
Stützle, T.2
Voß, S.3
-
20
-
-
33646703289
-
Autonome und kooperative Steuerung komplexer Produktionsprozesse mit Multi-Agenten-Systemen
-
Mönch L (2006) Autonome und kooperative Steuerung komplexer Produktionsprozesse mit Multi-Agenten-Systemen. WIRT-SCHAFTSINFORMATIK 48(2):107-119
-
(2006)
Wirt-schaftsinformatik
, vol.48
, Issue.2
, pp. 107-119
-
-
Mönch, L.1
-
22
-
-
34547339167
-
Supply chain optimization and protocol environment (SCOPE) for rapid prototyping and analysis of complex supply chains
-
Orcun S, Asmundsson JM, Uzsoy R, Clement JP, Pekny JF, Rardin RL (2007) Supply chain optimization and protocol environment (SCOPE) for rapid prototyping and analysis of complex supply chains. Production Planning & Control 18(5):388-406
-
(2007)
Production Planning & Control
, vol.18
, Issue.5
, pp. 388-406
-
-
Orcun, S.1
Asmundsson, J.M.2
Uzsoy, R.3
Clement, J.P.4
Pekny, J.F.5
Rardin, R.L.6
-
25
-
-
49749083070
-
Improved simple simulation models for semiconductor wafer fabrication facilities
-
Rose O (2007) Improved simple simulation models for semiconductor wafer fabrication facilities. In: Proc of the 2007 winter simulation conference, pp 1708-1712
-
(2007)
Proc of the 2007 Winter Simulation Conference
, pp. 1708-1712
-
-
Rose, O.1
-
29
-
-
85028118745
-
In-Memory-Technologien: Überlegungen zur Begründbarkeit und zum Einsatz beim Betrieb von großen Systemen, WI-Meinung/Dialog
-
Schütte R (2012) In-Memory-Technologien: Überlegungen zur Begründbarkeit und zum Einsatz beim Betrieb von großen Systemen, WI-Meinung/Dialog. WIRT-SCHAFTSINFORMATIK 54(4):211-213
-
(2012)
Wirt-schaftsinformatik
, vol.54
, Issue.4
, pp. 211-213
-
-
Schütte, R.1
-
30
-
-
77955598671
-
A time-space network approach for the integrated vehicle and crew scheduling problem with multiple depots
-
Steinzen I, Gintner V, Suhl L, Kliewer N (2010) A time-space network approach for the integrated vehicle and crew scheduling problem with multiple depots. Transportation Science 44(3):367-382
-
(2010)
Transportation Science
, vol.44
, Issue.3
, pp. 367-382
-
-
Steinzen, I.1
Gintner, V.2
Suhl, L.3
Kliewer, N.4
|