-
1
-
-
77957710757
-
Queueing model improves IBM's semiconductor capacity and lead-time management
-
Brown SM, Hanschke T, Meents I, Wheeler BR, Zisgen H (2010) Queueing model improves IBM's semiconductor capacity and lead-time management. Interfaces 40(5):397-407.
-
(2010)
Interfaces
, vol.40
, Issue.5
, pp. 397-407
-
-
Brown, S.M.1
Hanschke, T.2
Meents, I.3
Wheeler, B.R.4
Zisgen, H.5
-
2
-
-
33749382720
-
IBM solves a mixed-integer program to optimize its semiconductor supply chain
-
DOI 10.1287/inte.1060.0238
-
Denton B, Forrest J, Milne RJ (2006) IBM solves a mixed-integer program to optimize its semiconductor supply chain. Interfaces 36(5):386-399. (Pubitemid 44506610)
-
(2006)
Interfaces
, vol.36
, Issue.5
, pp. 386-399
-
-
Denton, B.T.1
Forrest, J.2
John Milne, R.3
-
3
-
-
84876877958
-
-
US Patent 6,584,370 filed May 14 1990 issued March 23 1993
-
Denton BT, Hegde SR, Orzell RA (2003) Method of calculating low level codes for considering capacities. US Patent 6,584,370, filed May 14, 1990, issued March 23, 1993.
-
(2003)
Method of Calculating Low Level Codes for Considering Capacities
-
-
Denton, B.T.1
Hegde, S.R.2
Orzell, R.A.3
-
4
-
-
0035284263
-
Extended enterprise planning methodology for the discrete manufacturing industry
-
DOI 10.1016/S0377-2217(00)00229-0
-
Frederix F (2001) An extended enterprise planning methodology for the discrete manufacturing industry. Eur. J. Oper. Res. 129(2):317-325. (Pubitemid 32035355)
-
(2001)
European Journal of Operational Research
, vol.129
, Issue.2
, pp. 317-325
-
-
Frederix, F.1
-
5
-
-
0032960899
-
A hierarchical Lagrangean relaxation procedure for solving midterm planning problems
-
Gupta A, Maranas CD (1999) A hierarchical Lagrangean relaxation procedure for solving midterm planning problems. Indust. Engrg. Chemistry Res. 38(6):1937-1947. (Pubitemid 29236725)
-
(1999)
Industrial and Engineering Chemistry Research
, vol.38
, Issue.5
, pp. 1937-1947
-
-
Gupta, A.1
Maranas, C.D.2
-
6
-
-
42349086484
-
-
US Patent 6,701,201 filed August 22 2001 issued March 2 2004
-
Hegde SR, Milne RJ, Orzell RA, Pati MC, Patil SP (2004) Decomposition system and method for solving a large-scale semiconductor production planning problem. US Patent 6,701,201, filed August 22, 2001, issued March 2, 2004.
-
(2004)
Decomposition System and Method for Solving A Large-scale Semiconductor Production Planning Problem
-
-
Hegde, S.R.1
Milne, R.J.2
Orzell, R.A.3
Pati, M.C.4
Patil, S.P.5
-
7
-
-
0013367503
-
IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation - Semiconductor Sector
-
Leachman RC, Benson RF, Liu C, Raar DJ (1996) IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation - Semiconductor Sector. Interfaces 26(1):6-37.
-
(1996)
Interfaces
, vol.26
, Issue.1
, pp. 6-37
-
-
Leachman, R.C.1
Benson, R.F.2
Liu, C.3
Raar, D.J.4
-
8
-
-
33746925271
-
Supply chain model for the semiconductor industry in consideration of manufacturing characteristics
-
DOI 10.1080/09537280600804976, PII W4365TTT81715414
-
Lee YH, Chung S, Lee B, Kang KH (2006) Supply chain model for the semiconductor industry in consideration of manufacturing characteristics. Production Planning Control 17(5):518-533. (Pubitemid 44183390)
-
(2006)
Production Planning and Control
, vol.17
, Issue.5
, pp. 518-533
-
-
Lee, Y.H.1
Chung, S.2
Lee, B.3
Kang, K.H.4
-
9
-
-
0039424070
-
Extended-enterprise supply-chain management at IBM Personal Systems Group and other divisions
-
Lin G, Ettl M, Buckley S, Bagchi S, Yao DD, Naccarato BL, Allan R, Kim K, Koenig L (2000) Extended-enterprise supply-chain management at IBM Personal Systems Group and other divisions. Interfaces 30(1):7-25.
-
(2000)
Interfaces
, vol.30
, Issue.1
, pp. 7-25
-
-
Lin, G.1
Ettl, M.2
Buckley, S.3
Bagchi, S.4
Yao, D.D.5
Naccarato, B.L.6
Allan, R.7
Kim, K.8
Koenig, L.9
-
10
-
-
0039147550
-
Matching assets with demand in supply-chain management at IBM Microelectronics
-
Lyon P, Milne RJ, Orzell R, Rice R (2001) Matching assets with demand in supply-chain management at IBM Microelectronics. Interfaces 31(1):108-124.
-
(2001)
Interfaces
, vol.31
, Issue.1
, pp. 108-124
-
-
Lyon, P.1
Milne, R.J.2
Orzell, R.3
Rice, R.4
-
11
-
-
84855921402
-
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
-
Monch L, Fowler JW, Dauzère-Pérès S, Mason SJ, Rose O (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Scheduling 14(6):583-589.
-
(2011)
J. Scheduling
, vol.14
, Issue.6
, pp. 583-589
-
-
Monch, L.1
Fowler, J.W.2
Dauzère-Pérès, S.3
Mason, S.J.4
Rose, O.5
-
12
-
-
0002350057
-
IBM Burlington's logistics management system
-
Sullivan G, Fordyce K (1990) IBM Burlington's logistics management system. Interfaces 20(1):43-64.
-
(1990)
Interfaces
, vol.20
, Issue.1
, pp. 43-64
-
-
Sullivan, G.1
Fordyce, K.2
-
13
-
-
33744986037
-
Capacity planning with reconfigurable kits in semiconductor test manufacturing
-
DOI 10.1080/00207540500490954, PII M22064X2474453
-
Zhang Z, Zhang MT, Niu S, Zheng L (2006) Capacity planning with reconfigurable kits in semiconductor test manufacturing. Internat. J. Production Res. 44(13):2625-2644. (Pubitemid 43862199)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.13
, pp. 2625-2644
-
-
Zhang, Z.1
Zhang, M.T.2
Niu, S.3
Zheng, L.4
-
14
-
-
35348924466
-
Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing
-
DOI 10.1109/TASE.2007.905977
-
Zhang MT, Niu S, Deng S, Zhang Z, Li Q, Zheng L (2007) Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing. IEEE Trans. Automation Sci. Engrg. 4(4):543-552. (Pubitemid 47573849)
-
(2007)
IEEE Transactions on Automation Science and Engineering
, vol.4
, Issue.4
, pp. 543-552
-
-
Zhang, M.T.1
Niu, S.2
Deng, S.3
Zhang, Z.4
Li, Q.5
Zheng, L.6
|