메뉴 건너뛰기




Volumn 43, Issue 2, 2013, Pages 130-141

IBM blends heuristics and optimization to plan its semiconductor supply chain

Author keywords

Industries: computer, electronic; Information systems: management, decision support systems; Production, scheduling: planning; Programming: linear, integer

Indexed keywords


EID: 84876857684     PISSN: 00922102     EISSN: 1526551X     Source Type: Journal    
DOI: 10.1287/inte.1120.0642     Document Type: Article
Times cited : (25)

References (14)
  • 1
    • 77957710757 scopus 로고    scopus 로고
    • Queueing model improves IBM's semiconductor capacity and lead-time management
    • Brown SM, Hanschke T, Meents I, Wheeler BR, Zisgen H (2010) Queueing model improves IBM's semiconductor capacity and lead-time management. Interfaces 40(5):397-407.
    • (2010) Interfaces , vol.40 , Issue.5 , pp. 397-407
    • Brown, S.M.1    Hanschke, T.2    Meents, I.3    Wheeler, B.R.4    Zisgen, H.5
  • 2
    • 33749382720 scopus 로고    scopus 로고
    • IBM solves a mixed-integer program to optimize its semiconductor supply chain
    • DOI 10.1287/inte.1060.0238
    • Denton B, Forrest J, Milne RJ (2006) IBM solves a mixed-integer program to optimize its semiconductor supply chain. Interfaces 36(5):386-399. (Pubitemid 44506610)
    • (2006) Interfaces , vol.36 , Issue.5 , pp. 386-399
    • Denton, B.T.1    Forrest, J.2    John Milne, R.3
  • 4
    • 0035284263 scopus 로고    scopus 로고
    • Extended enterprise planning methodology for the discrete manufacturing industry
    • DOI 10.1016/S0377-2217(00)00229-0
    • Frederix F (2001) An extended enterprise planning methodology for the discrete manufacturing industry. Eur. J. Oper. Res. 129(2):317-325. (Pubitemid 32035355)
    • (2001) European Journal of Operational Research , vol.129 , Issue.2 , pp. 317-325
    • Frederix, F.1
  • 5
    • 0032960899 scopus 로고    scopus 로고
    • A hierarchical Lagrangean relaxation procedure for solving midterm planning problems
    • Gupta A, Maranas CD (1999) A hierarchical Lagrangean relaxation procedure for solving midterm planning problems. Indust. Engrg. Chemistry Res. 38(6):1937-1947. (Pubitemid 29236725)
    • (1999) Industrial and Engineering Chemistry Research , vol.38 , Issue.5 , pp. 1937-1947
    • Gupta, A.1    Maranas, C.D.2
  • 7
    • 0013367503 scopus 로고    scopus 로고
    • IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation - Semiconductor Sector
    • Leachman RC, Benson RF, Liu C, Raar DJ (1996) IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation - Semiconductor Sector. Interfaces 26(1):6-37.
    • (1996) Interfaces , vol.26 , Issue.1 , pp. 6-37
    • Leachman, R.C.1    Benson, R.F.2    Liu, C.3    Raar, D.J.4
  • 8
    • 33746925271 scopus 로고    scopus 로고
    • Supply chain model for the semiconductor industry in consideration of manufacturing characteristics
    • DOI 10.1080/09537280600804976, PII W4365TTT81715414
    • Lee YH, Chung S, Lee B, Kang KH (2006) Supply chain model for the semiconductor industry in consideration of manufacturing characteristics. Production Planning Control 17(5):518-533. (Pubitemid 44183390)
    • (2006) Production Planning and Control , vol.17 , Issue.5 , pp. 518-533
    • Lee, Y.H.1    Chung, S.2    Lee, B.3    Kang, K.H.4
  • 10
    • 0039147550 scopus 로고    scopus 로고
    • Matching assets with demand in supply-chain management at IBM Microelectronics
    • Lyon P, Milne RJ, Orzell R, Rice R (2001) Matching assets with demand in supply-chain management at IBM Microelectronics. Interfaces 31(1):108-124.
    • (2001) Interfaces , vol.31 , Issue.1 , pp. 108-124
    • Lyon, P.1    Milne, R.J.2    Orzell, R.3    Rice, R.4
  • 11
    • 84855921402 scopus 로고    scopus 로고
    • A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
    • Monch L, Fowler JW, Dauzère-Pérès S, Mason SJ, Rose O (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Scheduling 14(6):583-589.
    • (2011) J. Scheduling , vol.14 , Issue.6 , pp. 583-589
    • Monch, L.1    Fowler, J.W.2    Dauzère-Pérès, S.3    Mason, S.J.4    Rose, O.5
  • 12
    • 0002350057 scopus 로고
    • IBM Burlington's logistics management system
    • Sullivan G, Fordyce K (1990) IBM Burlington's logistics management system. Interfaces 20(1):43-64.
    • (1990) Interfaces , vol.20 , Issue.1 , pp. 43-64
    • Sullivan, G.1    Fordyce, K.2
  • 13
    • 33744986037 scopus 로고    scopus 로고
    • Capacity planning with reconfigurable kits in semiconductor test manufacturing
    • DOI 10.1080/00207540500490954, PII M22064X2474453
    • Zhang Z, Zhang MT, Niu S, Zheng L (2006) Capacity planning with reconfigurable kits in semiconductor test manufacturing. Internat. J. Production Res. 44(13):2625-2644. (Pubitemid 43862199)
    • (2006) International Journal of Production Research , vol.44 , Issue.13 , pp. 2625-2644
    • Zhang, Z.1    Zhang, M.T.2    Niu, S.3    Zheng, L.4
  • 14
    • 35348924466 scopus 로고    scopus 로고
    • Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing
    • DOI 10.1109/TASE.2007.905977
    • Zhang MT, Niu S, Deng S, Zhang Z, Li Q, Zheng L (2007) Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing. IEEE Trans. Automation Sci. Engrg. 4(4):543-552. (Pubitemid 47573849)
    • (2007) IEEE Transactions on Automation Science and Engineering , vol.4 , Issue.4 , pp. 543-552
    • Zhang, M.T.1    Niu, S.2    Deng, S.3    Zhang, Z.4    Li, Q.5    Zheng, L.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.