메뉴 건너뛰기




Volumn 99, Issue , 2017, Pages 325-339

Erratum to “Optimization of multipurpose process plant operations: A multi-time-scale maintenance and production scheduling approach” [Comput. Chem. Eng., 99 (2017) (325–339)](S009813541730008X)(10.1016/j.compchemeng.2017.01.007);Optimization of multipurpose process plant operations: A multi-time-scale maintenance and production scheduling approach

Author keywords

Maintenance; Optimization; Performance degradation; Plant operations; Scheduling

Indexed keywords

INDUSTRIAL PLANTS; INTEGER PROGRAMMING; MAINTENANCE; OPTIMIZATION; PRODUCTION CONTROL; SOFTWARE TESTING; TIME MEASUREMENT;

EID: 85011971427     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2017.05.019     Document Type: Erratum
Times cited : (42)

References (24)
  • 1
    • 0242658501 scopus 로고    scopus 로고
    • Minimizing the makespan for the flow shop scheduling problem with availability constraints
    • Aggoune, R., Minimizing the makespan for the flow shop scheduling problem with availability constraints. Eur. J. Oper. Res. 153 (2004), 534–543.
    • (2004) Eur. J. Oper. Res. , vol.153 , pp. 534-543
    • Aggoune, R.1
  • 2
    • 4644231547 scopus 로고    scopus 로고
    • The economic lot scheduling problem under performance decay
    • Alle, A., Pinto, J.M., Papageorgiou, L.G., The economic lot scheduling problem under performance decay. Ind. Eng. Chem. Res. 43:20 (2004), 6463–6475.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , Issue.20 , pp. 6463-6475
    • Alle, A.1    Pinto, J.M.2    Papageorgiou, L.G.3
  • 3
    • 84940537140 scopus 로고    scopus 로고
    • Tighter integration of maintenance and production in short-term scheduling of multipurpose process plants
    • Biondi, M., Sand, G., Harjunkoski, I., Tighter integration of maintenance and production in short-term scheduling of multipurpose process plants. Comput. Aided Chem. Eng. 37 (2015), 1937–1942.
    • (2015) Comput. Aided Chem. Eng. , vol.37 , pp. 1937-1942
    • Biondi, M.1    Sand, G.2    Harjunkoski, I.3
  • 4
    • 84870523287 scopus 로고    scopus 로고
    • Scheduling flexible maintenance activities subject to job-dependent machine deterioration
    • Bock, S., Briskorn, D., Horbach, A., Scheduling flexible maintenance activities subject to job-dependent machine deterioration. J. Scheduling 15:5 (2012), 565–578.
    • (2012) J. Scheduling , vol.15 , Issue.5 , pp. 565-578
    • Bock, S.1    Briskorn, D.2    Horbach, A.3
  • 5
    • 84899901071 scopus 로고    scopus 로고
    • Optimal maintenance scheduling of a gas engine power plant using generalized disjunctive programming
    • Castro, P.M., Grossmann, I.E., Veldhuizen, P., Esplin, D., Optimal maintenance scheduling of a gas engine power plant using generalized disjunctive programming. AIChE J. 60 (2014), 2083–2097.
    • (2014) AIChE J. , vol.60 , pp. 2083-2097
    • Castro, P.M.1    Grossmann, I.E.2    Veldhuizen, P.3    Esplin, D.4
  • 8
    • 0029231167 scopus 로고
    • Optimal short-term scheduling of maintenance and production for multipurpose plants
    • Dedopoulos, I.T., Shah, N., Optimal short-term scheduling of maintenance and production for multipurpose plants. Ind. Eng. Chem. Res. 34:1 (1995), 192–201.
    • (1995) Ind. Eng. Chem. Res. , vol.34 , Issue.1 , pp. 192-201
    • Dedopoulos, I.T.1    Shah, N.2
  • 9
    • 0033429615 scopus 로고    scopus 로고
    • Numerical and environmental considerations on a complex industrial mixed integer non-linear programming (MINLP) problem
    • Harjunkoski, I., Westerlund, T., Pörn, R., Numerical and environmental considerations on a complex industrial mixed integer non-linear programming (MINLP) problem. Comput. Chem. Eng. 23 (1999), 1545–1561.
    • (1999) Comput. Chem. Eng. , vol.23 , pp. 1545-1561
    • Harjunkoski, I.1    Westerlund, T.2    Pörn, R.3
  • 10
    • 84864818814 scopus 로고    scopus 로고
    • Flexible maintenance within a continuous-time state-task network framework
    • Hazaras, M.J., Swartz, C.L.E., Marlin, T.E., Flexible maintenance within a continuous-time state-task network framework. Comput. Chem. Eng. 46 (2012), 167–177.
    • (2012) Comput. Chem. Eng. , vol.46 , pp. 167-177
    • Hazaras, M.J.1    Swartz, C.L.E.2    Marlin, T.E.3
  • 11
    • 0032115410 scopus 로고    scopus 로고
    • Cyclic scheduling of continuous parallel process units with decaying performance
    • Jain, V., Grossmann, I.E., Cyclic scheduling of continuous parallel process units with decaying performance. AIChE J. 44:7 (1998), 1623–1636.
    • (1998) AIChE J. , vol.44 , Issue.7 , pp. 1623-1636
    • Jain, V.1    Grossmann, I.E.2
  • 12
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak, S.L., Lin, X., Floudas, C.A., Enhanced continuous time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Ind. Eng. Chem. Res. 43 (2004), 2516–2533.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 13
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-I: MILP formulation
    • Kondili, E., Pantelides, C.C., Sargent, W.H., A general algorithm for short-term scheduling of batch operations-I: MILP formulation. Comput. Chem. Eng. 2 (1993), 211–227.
    • (1993) Comput. Chem. Eng. , vol.2 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, W.H.3
  • 14
    • 84910050885 scopus 로고    scopus 로고
    • Optimal production and maintenance planning of biopharmaceutical manufacturing under performance decay
    • 17075–17071
    • Liu, S., Yahia, A., Papageorgiou, L.G., Optimal production and maintenance planning of biopharmaceutical manufacturing under performance decay. Ind. Eng. Chem. Res., 53(44), 2014 17075–17071.
    • (2014) Ind. Eng. Chem. Res. , vol.53 , Issue.44
    • Liu, S.1    Yahia, A.2    Papageorgiou, L.G.3
  • 15
    • 33748102266 scopus 로고    scopus 로고
    • State-of-the-art review of optimization methods for short-term scheduling of batch processes
    • Méndez, C.A., Cerdá, J., Grossmann, I.E., Harjunkoski, I., Fahl, M., State-of-the-art review of optimization methods for short-term scheduling of batch processes. Comput. Chem. Eng. 30 (2006), 913–946.
    • (2006) Comput. Chem. Eng. , vol.30 , pp. 913-946
    • Méndez, C.A.1    Cerdá, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 16
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias, C.T., Grossmann, I.E., New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Ind. Eng. Chem. Res. 42 (2003), 3056–3074.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 17
    • 4143136582 scopus 로고    scopus 로고
    • A hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants
    • Maravelias, C.T., Grossmann, I.E., A hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants. Comput. Chem. Eng. 28 (2004), 1921–1949.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 1921-1949
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 18
    • 85043883175 scopus 로고    scopus 로고
    • NAMUR (2009). NAMUR-Recommendation NE129: Plant asset management. User association of automation technology in process industries (NAMUR).
    • NAMUR (2009). NAMUR-Recommendation NE129: Plant asset management. User association of automation technology in process industries (NAMUR).
  • 19
    • 78751615953 scopus 로고    scopus 로고
    • Incorporating periodic preventive maintenance into flexible flowshop scheduling problems
    • Naderi, B., Zandieh, M., Aminnayeri, M., Incorporating periodic preventive maintenance into flexible flowshop scheduling problems. Appl. Soft Comput. 11:2 (2011), 2094–2101.
    • (2011) Appl. Soft Comput. , vol.11 , Issue.2 , pp. 2094-2101
    • Naderi, B.1    Zandieh, M.2    Aminnayeri, M.3
  • 20
    • 84910071771 scopus 로고    scopus 로고
    • Extended discrete-time resource task network formulation for the reactive scheduling of a mixed Batch/Continuous process
    • Nie, Y., Biegler, L.T., Wassick, J.M., Villa, C.M., Extended discrete-time resource task network formulation for the reactive scheduling of a mixed Batch/Continuous process. Ind. Eng. Chem. Res. 53:44 (2014), 17112–17123.
    • (2014) Ind. Eng. Chem. Res. , vol.53 , Issue.44 , pp. 17112-17123
    • Nie, Y.1    Biegler, L.T.2    Wassick, J.M.3    Villa, C.M.4
  • 21
    • 0030085944 scopus 로고    scopus 로고
    • Optimal campaign planning scheduling of multipurpose batch semicontinuous plants. 1. Mathematical Formulation
    • Papageorgiou, L.G., Pantelides, C.C., Optimal campaign planning scheduling of multipurpose batch semicontinuous plants. 1. Mathematical Formulation. Ind. Eng. Chem. Res. 35:2 (1996), 488–509.
    • (1996) Ind. Eng. Chem. Res. , vol.35 , Issue.2 , pp. 488-509
    • Papageorgiou, L.G.1    Pantelides, C.C.2
  • 22
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-II. Computational issues
    • Shah, N., Pantelides, C.C., Sargent, W.H., A general algorithm for short-term scheduling of batch operations-II. Computational issues. Comput. Chem. Eng. 2 (1993), 229–244.
    • (1993) Comput. Chem. Eng. , vol.2 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, W.H.3
  • 24
    • 84930335068 scopus 로고    scopus 로고
    • On the solution of large-scale mixed integer programming scheduling models
    • Velez, S., Merchan, A.F., Maravelias, C.T., On the solution of large-scale mixed integer programming scheduling models. Chem. Eng. Sci. 136 (2015), 139–157.
    • (2015) Chem. Eng. Sci. , vol.136 , pp. 139-157
    • Velez, S.1    Merchan, A.F.2    Maravelias, C.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.