Volumn 60, Issue 6, 2014, Pages 2083-2097

Optimal maintenance scheduling of a gas engine power plant using generalized disjunctive programming

Author keywords

Logic; Mathematical modeling; Mixed integer linear programming; Optimization; Planning

Indexed keywords

COMPENSATION (PERSONNEL); ECONOMICS; INTEGER PROGRAMMING; LINEAR PROGRAMMING; MAINTENANCE; MATHEMATICAL MODELS; OPTIMIZATION; PLANNING; POWER PLANTS; SCHEDULING;

EID: 84899901071     PISSN: 00011541     EISSN: 15475905     Source Type: Journal    
DOI: 10.1002/aic.14412     Document Type: Article
Times cited : (55)

References (31)
  • 1
    • 33745853789 scopus 로고    scopus 로고
    • Power control of a polymer electrolyte membrane fuel cell
    • Lauzze KC, Chmielewski DJ. Power control of a polymer electrolyte membrane fuel cell. Ind Eng Chem Res. 2006;45:4661-4670.
    • (2006) Ind Eng Chem Res. , vol.45 , pp. 4661-4670
    • Lauzze, K.C.1    Chmielewski, D.J.2
  • 2
    • 43749110025 scopus 로고    scopus 로고
    • Designing man-portable power generation systems for varying power demand
    • Yunt M, Chachuat B, Mitsos A, Barton PI. Designing man-portable power generation systems for varying power demand. AIChE J. 2008;54:1254-1269.
    • (2008) AIChE J. , vol.54 , pp. 1254-1269
    • Yunt, M.1    Chachuat, B.2    Mitsos, A.3    Barton, P.I.4
  • 3
    • 78249286204 scopus 로고    scopus 로고
    • Optimal start-up of microfabricated power generation processes employing fuel cells
    • Chachuat B, Mitsos A, Barton PI. Optimal start-up of microfabricated power generation processes employing fuel cells. Opt Control Appl Methods. 2010;31(5):471-495.
    • (2010) Opt Control Appl Methods. , vol.31 , Issue.5 , pp. 471-495
    • Chachuat, B.1    Mitsos, A.2    Barton, P.I.3
  • 4
    • 67849109965 scopus 로고    scopus 로고
    • New continuous-time scheduling formulation for continuous plants under variable electricity cost
    • Castro PM, Harjunkoski I, Grossmann IE. New continuous-time scheduling formulation for continuous plants under variable electricity cost. Ind Eng Chem Res. 2009;48:6701-6714.
    • (2009) Ind Eng Chem Res. , vol.48 , pp. 6701-6714
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3
  • 5
    • 84857444866 scopus 로고    scopus 로고
    • Optimal production planning under time-sensitive electricity prices for continuous power intensive processes
    • Mitra S, Grossmann IE, Pinto JM, Arora N. Optimal production planning under time-sensitive electricity prices for continuous power intensive processes. Comput Chem Eng. 2012;38:171-184.
    • (2012) Comput Chem Eng. , vol.38 , pp. 171-184
    • Mitra, S.1    Grossmann, I.E.2    Pinto, J.M.3    Arora, N.4
  • 6
    • 77956872862 scopus 로고    scopus 로고
    • Electric load tracking scheduling of a steel plant
    • Nolde K, Morari M. Electric load tracking scheduling of a steel plant. Comput Chem Eng. 2010;34:1899-1903.
    • (2010) Comput Chem Eng. , vol.34 , pp. 1899-1903
    • Nolde, K.1    Morari, M.2
  • 7
    • 80053911225 scopus 로고    scopus 로고
    • On electric load tracking scheduling for a steel plant
    • Haït A, Artigues C. On electric load tracking scheduling for a steel plant. Comput Chem Eng. 2011;35:3044-3047.
    • (2011) Comput Chem Eng. , vol.35 , pp. 3044-3047
    • Haït, A.1    Artigues, C.2
  • 8
    • 84879024245 scopus 로고    scopus 로고
    • Continuous-time batch scheduling approach for optimizing electricity consumption cost
    • Kraslawski A, Turunen I, editors., Vol. Elsevier, Amsterdam, The Netherlands
    • Hadera H, Harjunkoski I. Continuous-time batch scheduling approach for optimizing electricity consumption cost. In: Kraslawski A, Turunen I, editors. Computer-Aided Chemical Engineering, Vol. 32. Elsevier, Amsterdam, The Netherlands, 2013:403-408.
    • (2013) Computer-Aided Chemical Engineering , vol.32 , pp. 403-408
    • Hadera, H.1    Harjunkoski, I.2
  • 9
    • 84884177657 scopus 로고    scopus 로고
    • Resource-task network formulations for industrial demand side management of a steel plant
    • Castro PM, Sun L, Harjunkoski I. Resource-task network formulations for industrial demand side management of a steel plant. Ind Eng Chem Res. 2013;52:13046-13058.
    • (2013) Ind Eng Chem Res. , vol.52 , pp. 13046-13058
    • Castro, P.M.1    Sun, L.2    Harjunkoski, I.3
  • 10
    • 84876983753 scopus 로고    scopus 로고
    • Optimal scheduling of industrial combined heat and power plants under time-sensitive electricity prices
    • Mitra S, Sun L, Grossmann IE. Optimal scheduling of industrial combined heat and power plants under time-sensitive electricity prices. Energy. 2013;54:194-211.
    • (2013) Energy. , vol.54 , pp. 194-211
    • Mitra, S.1    Sun, L.2    Grossmann, I.E.3
  • 12
    • 84875857467 scopus 로고    scopus 로고
    • A novel method for maintenance scheduling of generating units considering the demand side
    • Elyas SH, Foroud AA, Chitsaz H. A novel method for maintenance scheduling of generating units considering the demand side. Electr Power Energy Syst. 2013;51:201-212.
    • (2013) Electr Power Energy Syst. , vol.51 , pp. 201-212
    • Elyas, S.H.1    Foroud, A.A.2    Chitsaz, H.3
  • 13
    • 33947162394 scopus 로고    scopus 로고
    • Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
    • Dahal KP, Chakpitak N. Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches. Electr Power Syst Res. 2007;77:771-779.
    • (2007) Electr Power Syst Res. , vol.77 , pp. 771-779
    • Dahal, K.P.1    Chakpitak, N.2
  • 14
    • 0033893452 scopus 로고    scopus 로고
    • A tabu search algorithm for maintenance scheduling of generating units
    • El-Amin I, Duffuaa S, Abbas M. A tabu search algorithm for maintenance scheduling of generating units. Electr Power Syst Res. 2000;54:91-99.
    • (2000) Electr Power Syst Res. , vol.54 , pp. 91-99
    • El-Amin, I.1    Duffuaa, S.2    Abbas, M.3
  • 16
    • 84885429545 scopus 로고    scopus 로고
    • An EPEC approach to the yearly maintenance scheduling of generating units
    • Pandzic H, Conejo AJ, Kuzle, I. An EPEC approach to the yearly maintenance scheduling of generating units. IEEE Trans Power Syst. 2013;28(2):922-930.
    • (2013) IEEE Trans Power Syst. , vol.28 , Issue.2 , pp. 922-930
    • Pandzic, H.1    Conejo, A.J.2    Kuzle, I.3
  • 17
    • 84856275377 scopus 로고    scopus 로고
    • Yearly maintenance scheduling of transmission lines within a market environment
    • Pandzic H, Conejo AJ, Kuzle I, Caro E. Yearly maintenance scheduling of transmission lines within a market environment. IEEE Trans Power Syst. 2012;27(1):407-415.
    • (2012) IEEE Trans Power Syst. , vol.27 , Issue.1 , pp. 407-415
    • Pandzic, H.1    Conejo, A.J.2    Kuzle, I.3    Caro, E.4
  • 18
    • 0033907831 scopus 로고    scopus 로고
    • A new genetic algorithm for preventive unit maintenance scheduling of power systems
    • Wang Y, Handschin E. A new genetic algorithm for preventive unit maintenance scheduling of power systems. Electr Power Energy Syst. 2000;22:343-348.
    • (2000) Electr Power Energy Syst. , vol.22 , pp. 343-348
    • Wang, Y.1    Handschin, E.2
  • 19
    • 77957040455 scopus 로고
    • Disjunctive programming
    • Balas E. Disjunctive programming. Ann Discrete Math. 1979;5:3-51.
    • (1979) Ann Discrete Math. , vol.5 , pp. 3-51
    • Balas, E.1
  • 20
    • 0028461924 scopus 로고
    • Modeling and computational techniques for logic based integer programming
    • Raman R, Grossmann IE. Modeling and computational techniques for logic based integer programming. Comput Chem Eng. 1994;18:563-578.
    • (1994) Comput Chem Eng. , vol.18 , pp. 563-578
    • Raman, R.1    Grossmann, I.E.2
  • 21
    • 84860375846 scopus 로고    scopus 로고
    • Generalized disjunctive programming as a systematic modeling framework to derive scheduling formulations
    • Castro PM, Grossmann IE. Generalized disjunctive programming as a systematic modeling framework to derive scheduling formulations. Ind Eng Chem Res. 2012;51:5781-5792.
    • (2012) Ind Eng Chem Res. , vol.51 , pp. 5781-5792
    • Castro, P.M.1    Grossmann, I.E.2
  • 23
    • 33646183471 scopus 로고    scopus 로고
    • An efficient MILP model for the short-term scheduling of single stage batch plants
    • Castro PM, Grossmann IE. An efficient MILP model for the short-term scheduling of single stage batch plants. Comput Chem Eng. 2006;30:1003-1018.
    • (2006) Comput Chem Eng. , vol.30 , pp. 1003-1018
    • Castro, P.M.1    Grossmann, I.E.2
  • 24
    • 33748102518 scopus 로고    scopus 로고
    • An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources
    • Grievink J, van Schijndel J, editors., Vol. Elsevier, Amsterdam, The Netherlands
    • Méndez CA, Cerdá, J. An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources. In: Grievink J, van Schijndel J, editors. Computer-Aided Chemical Engineering, Vol. 10. Elsevier, Amsterdam, The Netherlands, 2002:721.
    • (2002) Computer-Aided Chemical Engineering , vol.10 , pp. 721
    • Méndez, C.A.1    Cerdá, J.2
  • 25
    • 80052845471 scopus 로고    scopus 로고
    • A novel optimization method to automated wet-etch station scheduling in semiconductor manufacturing systems
    • Aguirre AM, Méndez CA, Castro PM. A novel optimization method to automated wet-etch station scheduling in semiconductor manufacturing systems. Comput Chem Eng. 2011;35:2960-2972.
    • (2011) Comput Chem Eng. , vol.35 , pp. 2960-2972
    • Aguirre, A.M.1    Méndez, C.A.2    Castro, P.M.3
  • 26
    • 80052858838 scopus 로고    scopus 로고
    • Hybrid time slots sequencing model for a class of scheduling problems
    • Castro PM, Zeballos LJ, Méndez CA. Hybrid time slots sequencing model for a class of scheduling problems. AIChE J. 2012;58:789-800.
    • (2012) AIChE J. , vol.58 , pp. 789-800
    • Castro, P.M.1    Zeballos, L.J.2    Méndez, C.A.3
  • 27
    • 0042848882 scopus 로고    scopus 로고
    • An MILP approach to automated wet-etch station scheduling
    • Bhushan S, Karimi IA. An MILP approach to automated wet-etch station scheduling. Ind Eng Chem Res. 2003;42:1391-1399.
    • (2003) Ind Eng Chem Res. , vol.42 , pp. 1391-1399
    • Bhushan, S.1    Karimi, I.A.2
  • 28
    • 0000324065 scopus 로고
    • Disjunctive programming and a hierarchy of relaxations for discrete optimization problems
    • Balas E. Disjunctive programming and a hierarchy of relaxations for discrete optimization problems. SIAM J Algebr Discrete Methods. 1985;6(3):466-486.
    • (1985) SIAM J Algebr Discrete Methods. , vol.6 , Issue.3 , pp. 466-486
    • Balas, E.1
  • 29
    • 84881662658 scopus 로고    scopus 로고
    • Systematic modeling of discrete-continuous optimization models through generalized disjunctive programming
    • Grossmann IE, Trespalacios F. Systematic modeling of discrete-continuous optimization models through generalized disjunctive programming. AIChE J. 2013;59:3276-3295.
    • (2013) AIChE J. , vol.59 , pp. 3276-3295
    • Grossmann, I.E.1    Trespalacios, F.2
  • 30
    • 0035339828 scopus 로고    scopus 로고
    • An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • Méndez CA, Henning GP, Cerdá J. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Comput Chem Eng. 2001;25:701-711.
    • (2001) Comput Chem Eng. , vol.25 , pp. 701-711
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 31
    • 0037111002 scopus 로고    scopus 로고
    • Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods
    • Harjunkoski I, Grossmann IE. Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods. Comput Chem Eng. 2002;26:1533-1552.
    • (2002) Comput Chem Eng. , vol.26 , pp. 1533-1552
    • Harjunkoski, I.1    Grossmann, I.E.2