-
1
-
-
33745853789
-
Power control of a polymer electrolyte membrane fuel cell
-
Lauzze KC, Chmielewski DJ. Power control of a polymer electrolyte membrane fuel cell. Ind Eng Chem Res. 2006;45:4661-4670.
-
(2006)
Ind Eng Chem Res.
, vol.45
, pp. 4661-4670
-
-
Lauzze, K.C.1
Chmielewski, D.J.2
-
2
-
-
43749110025
-
Designing man-portable power generation systems for varying power demand
-
Yunt M, Chachuat B, Mitsos A, Barton PI. Designing man-portable power generation systems for varying power demand. AIChE J. 2008;54:1254-1269.
-
(2008)
AIChE J.
, vol.54
, pp. 1254-1269
-
-
Yunt, M.1
Chachuat, B.2
Mitsos, A.3
Barton, P.I.4
-
3
-
-
78249286204
-
Optimal start-up of microfabricated power generation processes employing fuel cells
-
Chachuat B, Mitsos A, Barton PI. Optimal start-up of microfabricated power generation processes employing fuel cells. Opt Control Appl Methods. 2010;31(5):471-495.
-
(2010)
Opt Control Appl Methods.
, vol.31
, Issue.5
, pp. 471-495
-
-
Chachuat, B.1
Mitsos, A.2
Barton, P.I.3
-
4
-
-
67849109965
-
New continuous-time scheduling formulation for continuous plants under variable electricity cost
-
Castro PM, Harjunkoski I, Grossmann IE. New continuous-time scheduling formulation for continuous plants under variable electricity cost. Ind Eng Chem Res. 2009;48:6701-6714.
-
(2009)
Ind Eng Chem Res.
, vol.48
, pp. 6701-6714
-
-
Castro, P.M.1
Harjunkoski, I.2
Grossmann, I.E.3
-
5
-
-
84857444866
-
Optimal production planning under time-sensitive electricity prices for continuous power intensive processes
-
Mitra S, Grossmann IE, Pinto JM, Arora N. Optimal production planning under time-sensitive electricity prices for continuous power intensive processes. Comput Chem Eng. 2012;38:171-184.
-
(2012)
Comput Chem Eng.
, vol.38
, pp. 171-184
-
-
Mitra, S.1
Grossmann, I.E.2
Pinto, J.M.3
Arora, N.4
-
6
-
-
77956872862
-
Electric load tracking scheduling of a steel plant
-
Nolde K, Morari M. Electric load tracking scheduling of a steel plant. Comput Chem Eng. 2010;34:1899-1903.
-
(2010)
Comput Chem Eng.
, vol.34
, pp. 1899-1903
-
-
Nolde, K.1
Morari, M.2
-
7
-
-
80053911225
-
On electric load tracking scheduling for a steel plant
-
Haït A, Artigues C. On electric load tracking scheduling for a steel plant. Comput Chem Eng. 2011;35:3044-3047.
-
(2011)
Comput Chem Eng.
, vol.35
, pp. 3044-3047
-
-
Haït, A.1
Artigues, C.2
-
8
-
-
84879024245
-
Continuous-time batch scheduling approach for optimizing electricity consumption cost
-
Kraslawski A, Turunen I, editors., Vol. Elsevier, Amsterdam, The Netherlands
-
Hadera H, Harjunkoski I. Continuous-time batch scheduling approach for optimizing electricity consumption cost. In: Kraslawski A, Turunen I, editors. Computer-Aided Chemical Engineering, Vol. 32. Elsevier, Amsterdam, The Netherlands, 2013:403-408.
-
(2013)
Computer-Aided Chemical Engineering
, vol.32
, pp. 403-408
-
-
Hadera, H.1
Harjunkoski, I.2
-
9
-
-
84884177657
-
Resource-task network formulations for industrial demand side management of a steel plant
-
Castro PM, Sun L, Harjunkoski I. Resource-task network formulations for industrial demand side management of a steel plant. Ind Eng Chem Res. 2013;52:13046-13058.
-
(2013)
Ind Eng Chem Res.
, vol.52
, pp. 13046-13058
-
-
Castro, P.M.1
Sun, L.2
Harjunkoski, I.3
-
10
-
-
84876983753
-
Optimal scheduling of industrial combined heat and power plants under time-sensitive electricity prices
-
Mitra S, Sun L, Grossmann IE. Optimal scheduling of industrial combined heat and power plants under time-sensitive electricity prices. Energy. 2013;54:194-211.
-
(2013)
Energy.
, vol.54
, pp. 194-211
-
-
Mitra, S.1
Sun, L.2
Grossmann, I.E.3
-
11
-
-
0348167632
-
Short-term site-wide maintenance scheduling
-
Cheung K-Y, Hui C-W, Sakamoto H, Hirata K, O'Young L. Short-term site-wide maintenance scheduling. Comput Chem Eng. 2004;28:91-102.
-
(2004)
Comput Chem Eng.
, vol.28
, pp. 91-102
-
-
Cheung, K.-Y.1
Hui, C.-W.2
Sakamoto, H.3
Hirata, K.4
O'Young, L.5
-
12
-
-
84875857467
-
A novel method for maintenance scheduling of generating units considering the demand side
-
Elyas SH, Foroud AA, Chitsaz H. A novel method for maintenance scheduling of generating units considering the demand side. Electr Power Energy Syst. 2013;51:201-212.
-
(2013)
Electr Power Energy Syst.
, vol.51
, pp. 201-212
-
-
Elyas, S.H.1
Foroud, A.A.2
Chitsaz, H.3
-
13
-
-
33947162394
-
Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
-
Dahal KP, Chakpitak N. Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches. Electr Power Syst Res. 2007;77:771-779.
-
(2007)
Electr Power Syst Res.
, vol.77
, pp. 771-779
-
-
Dahal, K.P.1
Chakpitak, N.2
-
14
-
-
0033893452
-
A tabu search algorithm for maintenance scheduling of generating units
-
El-Amin I, Duffuaa S, Abbas M. A tabu search algorithm for maintenance scheduling of generating units. Electr Power Syst Res. 2000;54:91-99.
-
(2000)
Electr Power Syst Res.
, vol.54
, pp. 91-99
-
-
El-Amin, I.1
Duffuaa, S.2
Abbas, M.3
-
16
-
-
84885429545
-
An EPEC approach to the yearly maintenance scheduling of generating units
-
Pandzic H, Conejo AJ, Kuzle, I. An EPEC approach to the yearly maintenance scheduling of generating units. IEEE Trans Power Syst. 2013;28(2):922-930.
-
(2013)
IEEE Trans Power Syst.
, vol.28
, Issue.2
, pp. 922-930
-
-
Pandzic, H.1
Conejo, A.J.2
Kuzle, I.3
-
17
-
-
84856275377
-
Yearly maintenance scheduling of transmission lines within a market environment
-
Pandzic H, Conejo AJ, Kuzle I, Caro E. Yearly maintenance scheduling of transmission lines within a market environment. IEEE Trans Power Syst. 2012;27(1):407-415.
-
(2012)
IEEE Trans Power Syst.
, vol.27
, Issue.1
, pp. 407-415
-
-
Pandzic, H.1
Conejo, A.J.2
Kuzle, I.3
Caro, E.4
-
18
-
-
0033907831
-
A new genetic algorithm for preventive unit maintenance scheduling of power systems
-
Wang Y, Handschin E. A new genetic algorithm for preventive unit maintenance scheduling of power systems. Electr Power Energy Syst. 2000;22:343-348.
-
(2000)
Electr Power Energy Syst.
, vol.22
, pp. 343-348
-
-
Wang, Y.1
Handschin, E.2
-
19
-
-
77957040455
-
Disjunctive programming
-
Balas E. Disjunctive programming. Ann Discrete Math. 1979;5:3-51.
-
(1979)
Ann Discrete Math.
, vol.5
, pp. 3-51
-
-
Balas, E.1
-
20
-
-
0028461924
-
Modeling and computational techniques for logic based integer programming
-
Raman R, Grossmann IE. Modeling and computational techniques for logic based integer programming. Comput Chem Eng. 1994;18:563-578.
-
(1994)
Comput Chem Eng.
, vol.18
, pp. 563-578
-
-
Raman, R.1
Grossmann, I.E.2
-
21
-
-
84860375846
-
Generalized disjunctive programming as a systematic modeling framework to derive scheduling formulations
-
Castro PM, Grossmann IE. Generalized disjunctive programming as a systematic modeling framework to derive scheduling formulations. Ind Eng Chem Res. 2012;51:5781-5792.
-
(2012)
Ind Eng Chem Res.
, vol.51
, pp. 5781-5792
-
-
Castro, P.M.1
Grossmann, I.E.2
-
22
-
-
84894902084
-
Scope for industrial applications of productions scheduling models and solution methods
-
Harjunkoski I, Maravelias C, Bongers P, Castro P, Engell S, Grossmann I, Hooker J, Méndez C, Sand G, Wassick J. Scope for industrial applications of productions scheduling models and solution methods. Comput Chem Eng. 2014;62:161-193.
-
(2014)
Comput Chem Eng.
, vol.62
, pp. 161-193
-
-
Harjunkoski, I.1
Maravelias, C.2
Bongers, P.3
Castro, P.4
Engell, S.5
Grossmann, I.6
Hooker, J.7
Méndez, C.8
Sand, G.9
Wassick, J.10
-
23
-
-
33646183471
-
An efficient MILP model for the short-term scheduling of single stage batch plants
-
Castro PM, Grossmann IE. An efficient MILP model for the short-term scheduling of single stage batch plants. Comput Chem Eng. 2006;30:1003-1018.
-
(2006)
Comput Chem Eng.
, vol.30
, pp. 1003-1018
-
-
Castro, P.M.1
Grossmann, I.E.2
-
24
-
-
33748102518
-
An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources
-
Grievink J, van Schijndel J, editors., Vol. Elsevier, Amsterdam, The Netherlands
-
Méndez CA, Cerdá, J. An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources. In: Grievink J, van Schijndel J, editors. Computer-Aided Chemical Engineering, Vol. 10. Elsevier, Amsterdam, The Netherlands, 2002:721.
-
(2002)
Computer-Aided Chemical Engineering
, vol.10
, pp. 721
-
-
Méndez, C.A.1
Cerdá, J.2
-
25
-
-
80052845471
-
A novel optimization method to automated wet-etch station scheduling in semiconductor manufacturing systems
-
Aguirre AM, Méndez CA, Castro PM. A novel optimization method to automated wet-etch station scheduling in semiconductor manufacturing systems. Comput Chem Eng. 2011;35:2960-2972.
-
(2011)
Comput Chem Eng.
, vol.35
, pp. 2960-2972
-
-
Aguirre, A.M.1
Méndez, C.A.2
Castro, P.M.3
-
26
-
-
80052858838
-
Hybrid time slots sequencing model for a class of scheduling problems
-
Castro PM, Zeballos LJ, Méndez CA. Hybrid time slots sequencing model for a class of scheduling problems. AIChE J. 2012;58:789-800.
-
(2012)
AIChE J.
, vol.58
, pp. 789-800
-
-
Castro, P.M.1
Zeballos, L.J.2
Méndez, C.A.3
-
27
-
-
0042848882
-
An MILP approach to automated wet-etch station scheduling
-
Bhushan S, Karimi IA. An MILP approach to automated wet-etch station scheduling. Ind Eng Chem Res. 2003;42:1391-1399.
-
(2003)
Ind Eng Chem Res.
, vol.42
, pp. 1391-1399
-
-
Bhushan, S.1
Karimi, I.A.2
-
28
-
-
0000324065
-
Disjunctive programming and a hierarchy of relaxations for discrete optimization problems
-
Balas E. Disjunctive programming and a hierarchy of relaxations for discrete optimization problems. SIAM J Algebr Discrete Methods. 1985;6(3):466-486.
-
(1985)
SIAM J Algebr Discrete Methods.
, vol.6
, Issue.3
, pp. 466-486
-
-
Balas, E.1
-
29
-
-
84881662658
-
Systematic modeling of discrete-continuous optimization models through generalized disjunctive programming
-
Grossmann IE, Trespalacios F. Systematic modeling of discrete-continuous optimization models through generalized disjunctive programming. AIChE J. 2013;59:3276-3295.
-
(2013)
AIChE J.
, vol.59
, pp. 3276-3295
-
-
Grossmann, I.E.1
Trespalacios, F.2
-
30
-
-
0035339828
-
An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
-
Méndez CA, Henning GP, Cerdá J. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Comput Chem Eng. 2001;25:701-711.
-
(2001)
Comput Chem Eng.
, vol.25
, pp. 701-711
-
-
Méndez, C.A.1
Henning, G.P.2
Cerdá, J.3
-
31
-
-
0037111002
-
Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods
-
Harjunkoski I, Grossmann IE. Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods. Comput Chem Eng. 2002;26:1533-1552.
-
(2002)
Comput Chem Eng.
, vol.26
, pp. 1533-1552
-
-
Harjunkoski, I.1
Grossmann, I.E.2
|