-
2
-
-
41149166270
-
Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
-
DOI 10.1016/j.ejor.2007.06.029, PII S0377221707005644
-
Chen, J.-S. (2008). Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. European Journal of Operational Research, 190, 90-102. (Pubitemid 351434637)
-
(2008)
European Journal of Operational Research
, vol.190
, Issue.1
, pp. 90-102
-
-
Chen, J.-S.1
-
3
-
-
0141859880
-
A concise survey of scheduling with time-dependent processing times
-
Cheng, T., Ding, Q., & Lin, B. (2004). A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152, 1-13.
-
(2004)
European Journal of Operational Research
, vol.152
, pp. 1-13
-
-
Cheng, T.1
Ding, Q.2
Lin, B.3
-
4
-
-
74849101820
-
Optimisation and approximation in deterministic sequencing and scheduling: A survey
-
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimisation and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5, 236-287.
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 236-287
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
7
-
-
0000062028
-
An n job, one machine sequencing algorithm for minimizing the number of late jobs
-
Moore, J. M. (1968). An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Science, 15(1), 102-109.
-
(1968)
Management Science
, vol.15
, Issue.1
, pp. 102-109
-
-
Moore, J.M.1
-
8
-
-
60349083569
-
Scheduling a maintenance activity and due-window assignment on a single machine
-
Mosheiov, G., & Sarig, A. (2009). Scheduling a maintenance activity and due-window assignment on a single machine. Computers & Operations Research, 36, 2541-2545.
-
(2009)
Computers & Operations Research
, vol.36
, pp. 2541-2545
-
-
Mosheiov, G.1
Sarig, A.2
-
10
-
-
74449083455
-
Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines
-
Sun, K., & Li, H. (2010). Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines. International Journal of Production Economics, 124, 151-158.
-
(2010)
International Journal of Production Economics
, vol.124
, pp. 151-158
-
-
Sun, K.1
Li, H.2
-
11
-
-
77956266095
-
Scheduling jobs under increasing linear machine maintenance time
-
Xu, D., Yin, Y., & Li, H. (2010). Scheduling jobs under increasing linear machine maintenance time. Journal of Scheduling, 13, 443-449.
-
(2010)
Journal of Scheduling
, vol.13
, pp. 443-449
-
-
Xu, D.1
Yin, Y.2
Li, H.3
-
12
-
-
77952551347
-
Minimizing the makespan on singlemachine scheduling with aging effect and variable maintenance activities
-
Yang, S.-J.,& Yang, D.-L. (2010).Minimizing the makespan on singlemachine scheduling with aging effect and variable maintenance activities. Omega, 38, 528-533.
-
(2010)
Omega
, vol.38
, pp. 528-533
-
-
Yang, S.-J.1
Yang, D.-L.2
-
13
-
-
70350367239
-
Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan
-
Zhao, C.-L., & Tang, H.-Y. (2010). Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan. Applied Mathematical Modelling, 34, 837-841.
-
(2010)
Applied Mathematical Modelling
, vol.34
, pp. 837-841
-
-
Zhao, C.-L.1
Tang, H.-Y.2
|