메뉴 건너뛰기




Volumn 143, Issue 2, 2017, Pages

Framework of Automated Construction-Safety Monitoring Using Cloud-Enabled BIM and BLE Mobile Tracking Sensors

Author keywords

Bluetooth low energy (BLE); Building information model (BIM); Cloud computing; Construction safety; Information technologies; Location tracking; Mobile sensing; Safety monitoring

Indexed keywords

ARCHITECTURAL DESIGN; BLUETOOTH; CLOUD COMPUTING; HAZARDS; INFORMATION TECHNOLOGY; INFORMATION THEORY; LOCATION; OCCUPATIONAL RISKS; TRACKING (POSITION);

EID: 85010424196     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0001223     Document Type: Article
Times cited : (217)

References (23)
  • 1
    • 84892940646 scopus 로고    scopus 로고
    • Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study
    • 04013042
    • Albert, A., Hallowell, M., and, Kleiner, B. (2013). " Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000790, 04013042.
    • (2013) J. Constr. Eng. Manage.
    • Albert, A.1    Hallowell, M.2    Kleiner, B.3
  • 2
    • 84874518693 scopus 로고    scopus 로고
    • Workplace hazard identification and management: The case of an underground mining operation
    • Bahn, S. (2013). " Workplace hazard identification and management: The case of an underground mining operation." Saf. Sci., 57, 129-137. 10.1016/j.ssci.2013.01.010
    • (2013) Saf. Sci. , vol.57 , pp. 129-137
    • Bahn, S.1
  • 3
    • 79960637989 scopus 로고    scopus 로고
    • A proactive system for real-time safety management in construction sites
    • Carbonari, A., Giretti, A., and, Naticchia, B. (2011). " A proactive system for real-time safety management in construction sites." Autom. Constr., 20 (6), 686-698. 10.1016/j.autcon.2011.04.019
    • (2011) Autom. Constr. , vol.20 , Issue.6 , pp. 686-698
    • Carbonari, A.1    Giretti, A.2    Naticchia, B.3
  • 4
    • 30844457958 scopus 로고    scopus 로고
    • Safety hazard identification on construction projects
    • Carter, G., and, Smith, S. (2006). " Safety hazard identification on construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:2(197), 197-205. JCEMD4 0733-9364
    • (2006) J. Constr. Eng. Manage. , pp. 197-205
    • Carter, G.1    Smith, S.2
  • 5
    • 84948394736 scopus 로고    scopus 로고
    • A framework for cloud-based energy evaluation and management for sustainable decision support in the built environments
    • Cho, Y. K., Li, H., Park, J., and, Zheng, K. (2015). " A framework for cloud-based energy evaluation and management for sustainable decision support in the built environments." Procedia Eng., 118, 442-448. 10.1016/j.proeng.2015.08.445
    • (2015) Procedia Eng. , vol.118 , pp. 442-448
    • Cho, Y.K.1    Li, H.2    Park, J.3    Zheng, K.4
  • 6
    • 70449708995 scopus 로고    scopus 로고
    • Error modeling for an untethered ultra-wideband system for construction indoor asset tracking
    • Cho, Y. K., Youn, J. H., and, Martinez, D. (2010). " Error modeling for an untethered ultra-wideband system for construction indoor asset tracking." Autom. Constr., 19 (1), 43-54. 10.1016/j.autcon.2009.08.001
    • (2010) Autom. Constr. , vol.19 , Issue.1 , pp. 43-54
    • Cho, Y.K.1    Youn, J.H.2    Martinez, D.3
  • 8
    • 84975284896 scopus 로고    scopus 로고
    • Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications
    • Fang, Y., Cho, Y., Zhang, S., and, Perez, E. (2016). " Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001125, 05016003. JCEMD4 0733-9364
    • (2016) J. Constr. Eng. Manage. , pp. 05016003
    • Fang, Y.1    Cho, Y.2    Zhang, S.3    Perez, E.4
  • 9
    • 73349089019 scopus 로고    scopus 로고
    • Design and first development of an automated real-time safety management system for construction sites
    • Giretti, A., Carbonari, A., Naticchia, B., and, DeGrassi, M. (2009). " Design and first development of an automated real-time safety management system for construction sites." J. Civ. Eng. Manage., 15 (4), 325-336. 10.3846/1392-3730.2009.15.325-336
    • (2009) J. Civ. Eng. Manage. , vol.15 , Issue.4 , pp. 325-336
    • Giretti, A.1    Carbonari, A.2    Naticchia, B.3    DeGrassi, M.4
  • 10
    • 85010348672 scopus 로고    scopus 로고
    • Health and Safety Executive. (Mar. 6, 2016)
    • Health and Safety Executive. (2015). " Construction industry." (http://www.hse.gov.uk/statistics/industry/construction/index.htm) (Mar. 6, 2016).
    • (2015) Construction Industry
  • 11
    • 63549085077 scopus 로고    scopus 로고
    • Evaluation of position tracking technologies for user localization in indoor construction environments
    • Khoury, H. M., and, Kamat, V. R. (2009). " Evaluation of position tracking technologies for user localization in indoor construction environments." Autom. Constr., 18 (4), 444-457. 10.1016/j.autcon.2008.10.011
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 444-457
    • Khoury, H.M.1    Kamat, V.R.2
  • 13
    • 84982847693 scopus 로고    scopus 로고
    • Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM
    • Kim, K., Cho, Y. K., and, Zhang, S. (2016). " Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM." Autom. Constr, 70, 128-142. 10.1016/j.autcon.2016.06.012
    • (2016) Autom. Constr , vol.70 , pp. 128-142
    • Kim, K.1    Cho, Y.K.2    Zhang, S.3
  • 14
    • 58949083695 scopus 로고    scopus 로고
    • Development of a mobile safety monitoring system for construction sites
    • Lee, U.-K., Kim, J.-H., Cho, H., and, Kang, K.-I. (2009). " Development of a mobile safety monitoring system for construction sites." Autom. Constr., 18 (3), 258-264. 10.1016/j.autcon.2008.08.002
    • (2009) Autom. Constr. , vol.18 , Issue.3 , pp. 258-264
    • Lee, U.-K.1    Kim, J.-H.2    Cho, H.3    Kang, K.-I.4
  • 15
    • 84964215307 scopus 로고    scopus 로고
    • OSHA (Occupational Safety and Health Administration). (Mar. 6, 2016)
    • OSHA (Occupational Safety and Health Administration). (2014). " Commonly used statistics." (https://www.osha.gov/oshstats/commonstats.html) (Mar. 6, 2016).
    • (2014) Commonly Used Statistics
  • 16
    • 85010295216 scopus 로고    scopus 로고
    • OSHA (Occupational Safety and Health Administration). (Mar. 6, 2016)
    • OSHA (Occupational Safety and Health Administration). (2016). " Competent person." (https://www.osha.gov/SLTC/competentperson/) (Mar. 6, 2016).
    • (2016) Competent Person
  • 17
    • 84976343009 scopus 로고    scopus 로고
    • A wireless tracking system integrated with BIM for indoor construction applications
    • ASCE, Reston, VA
    • Park, J., Cho, Y. K., Ahn, C., and, Ahan, C. R. (2016 a). " A wireless tracking system integrated with BIM for indoor construction applications." Construction Research Congress 2016, ASCE, Reston, VA, 2660-2668.
    • (2016) Construction Research Congress 2016 , pp. 2660-2668
    • Park, J.1    Cho, Y.K.2    Ahn, C.3    Ahan, C.R.4
  • 18
    • 84994301787 scopus 로고    scopus 로고
    • Field construction management application through mobile BIM and location tracking technology
    • International Association for Automation and Robotics in Construction (IAARC), Auburn, AL
    • Park, J., Cho, Y. K., and, Kim, K. (2016 b). " Field construction management application through mobile BIM and location tracking technology." Proc., 33rd Int. Symp. on Automation and Robotics in Construction and Mining (ISARC 2016), International Association for Automation and Robotics in Construction (IAARC), Auburn, AL.
    • (2016) Proc. 33rd Int. Symp. on Automation and Robotics in Construction and Mining (ISARC 2016)
    • Park, J.1    Cho, Y.K.2    Kim, K.3
  • 19
    • 84994337341 scopus 로고    scopus 로고
    • Direction aware bluetooth low energy based proximity detection system for construction work zone safety
    • International Association for Automation and Robotics in Construction (IAARC), Auburn, AL
    • Park, J., Cho, Y. K., and, Timalsina, S. (2016 c). " Direction aware bluetooth low energy based proximity detection system for construction work zone safety." Proc., 33rd Int. Symp. on Automation and Robotics in Construction and Mining (ISARC 2016), International Association for Automation and Robotics in Construction (IAARC), Auburn, AL.
    • (2016) Proc. 33rd Int. Symp. on Automation and Robotics in Construction and Mining (ISARC 2016)
    • Park, J.1    Cho, Y.K.2    Timalsina, S.3
  • 20
    • 84950119153 scopus 로고    scopus 로고
    • Performance test of wireless technologies for personnel and equipment proximity sensing in work zones
    • 04015049
    • Park, J., Marks, E., Cho, Y., and, Suryanto, W. (2015). " Performance test of wireless technologies for personnel and equipment proximity sensing in work zones." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001031, 04015049. JCEMD4 0733-9364
    • (2015) J. Constr. Eng. Manage.
    • Park, J.1    Marks, E.2    Cho, Y.3    Suryanto, W.4
  • 21
    • 84901938850 scopus 로고    scopus 로고
    • CoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces
    • Riaz, Z., Arslan, M., Kiani, A. K., and, Azhar, S. (2014). " CoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces." Autom. Constr., 45, 96-106. 10.1016/j.autcon.2014.05.010
    • (2014) Autom. Constr. , vol.45 , pp. 96-106
    • Riaz, Z.1    Arslan, M.2    Kiani, A.K.3    Azhar, S.4
  • 23
    • 58149259941 scopus 로고    scopus 로고
    • Methodology for automating the identification and localization of construction components on industrial projects
    • Torrent, D., and, Caldas, C. (2009). " Methodology for automating the identification and localization of construction components on industrial projects." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2009)23:1(3), 3-13. JCCEE5 0887-3801
    • (2009) J. Comput. Civ. Eng. , pp. 3-13
    • Torrent, D.1    Caldas, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.