-
1
-
-
84892940646
-
Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study
-
04013042
-
Albert, A., Hallowell, M., and, Kleiner, B. (2013). " Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000790, 04013042.
-
(2013)
J. Constr. Eng. Manage.
-
-
Albert, A.1
Hallowell, M.2
Kleiner, B.3
-
2
-
-
84874518693
-
Workplace hazard identification and management: The case of an underground mining operation
-
Bahn, S. (2013). " Workplace hazard identification and management: The case of an underground mining operation." Saf. Sci., 57, 129-137. 10.1016/j.ssci.2013.01.010
-
(2013)
Saf. Sci.
, vol.57
, pp. 129-137
-
-
Bahn, S.1
-
3
-
-
79960637989
-
A proactive system for real-time safety management in construction sites
-
Carbonari, A., Giretti, A., and, Naticchia, B. (2011). " A proactive system for real-time safety management in construction sites." Autom. Constr., 20 (6), 686-698. 10.1016/j.autcon.2011.04.019
-
(2011)
Autom. Constr.
, vol.20
, Issue.6
, pp. 686-698
-
-
Carbonari, A.1
Giretti, A.2
Naticchia, B.3
-
4
-
-
30844457958
-
Safety hazard identification on construction projects
-
Carter, G., and, Smith, S. (2006). " Safety hazard identification on construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:2(197), 197-205. JCEMD4 0733-9364
-
(2006)
J. Constr. Eng. Manage.
, pp. 197-205
-
-
Carter, G.1
Smith, S.2
-
5
-
-
84948394736
-
A framework for cloud-based energy evaluation and management for sustainable decision support in the built environments
-
Cho, Y. K., Li, H., Park, J., and, Zheng, K. (2015). " A framework for cloud-based energy evaluation and management for sustainable decision support in the built environments." Procedia Eng., 118, 442-448. 10.1016/j.proeng.2015.08.445
-
(2015)
Procedia Eng.
, vol.118
, pp. 442-448
-
-
Cho, Y.K.1
Li, H.2
Park, J.3
Zheng, K.4
-
6
-
-
70449708995
-
Error modeling for an untethered ultra-wideband system for construction indoor asset tracking
-
Cho, Y. K., Youn, J. H., and, Martinez, D. (2010). " Error modeling for an untethered ultra-wideband system for construction indoor asset tracking." Autom. Constr., 19 (1), 43-54. 10.1016/j.autcon.2009.08.001
-
(2010)
Autom. Constr.
, vol.19
, Issue.1
, pp. 43-54
-
-
Cho, Y.K.1
Youn, J.H.2
Martinez, D.3
-
7
-
-
84866235335
-
-
Construction Research Congress 2012, ASCE, Reston, VA
-
Escorcia, V., Dávila, M., Golparvar-Fard, M., and, Niebles, J. (2012). " Automated vision-based recognition of construction worker actions for building interior construction operations using RGBD cameras." Construction Research Congress 2012, ASCE, Reston, VA, 879-888.
-
(2012)
Automated Vision-based Recognition of Construction Worker Actions for Building Interior Construction Operations Using RGBD Cameras
, pp. 879-888
-
-
Escorcia, V.1
Dávila, M.2
Golparvar-Fard, M.3
Niebles, J.4
-
8
-
-
84975284896
-
Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications
-
Fang, Y., Cho, Y., Zhang, S., and, Perez, E. (2016). " Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001125, 05016003. JCEMD4 0733-9364
-
(2016)
J. Constr. Eng. Manage.
, pp. 05016003
-
-
Fang, Y.1
Cho, Y.2
Zhang, S.3
Perez, E.4
-
9
-
-
73349089019
-
Design and first development of an automated real-time safety management system for construction sites
-
Giretti, A., Carbonari, A., Naticchia, B., and, DeGrassi, M. (2009). " Design and first development of an automated real-time safety management system for construction sites." J. Civ. Eng. Manage., 15 (4), 325-336. 10.3846/1392-3730.2009.15.325-336
-
(2009)
J. Civ. Eng. Manage.
, vol.15
, Issue.4
, pp. 325-336
-
-
Giretti, A.1
Carbonari, A.2
Naticchia, B.3
DeGrassi, M.4
-
10
-
-
85010348672
-
-
Health and Safety Executive. (Mar. 6, 2016)
-
Health and Safety Executive. (2015). " Construction industry." (http://www.hse.gov.uk/statistics/industry/construction/index.htm) (Mar. 6, 2016).
-
(2015)
Construction Industry
-
-
-
11
-
-
63549085077
-
Evaluation of position tracking technologies for user localization in indoor construction environments
-
Khoury, H. M., and, Kamat, V. R. (2009). " Evaluation of position tracking technologies for user localization in indoor construction environments." Autom. Constr., 18 (4), 444-457. 10.1016/j.autcon.2008.10.011
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 444-457
-
-
Khoury, H.M.1
Kamat, V.R.2
-
12
-
-
84936865115
-
-
2015 Int. Workshop on Computing in Civil Engineering, ASCE, Reston, VA
-
Kim, K., and, Cho, Y. K. (2015). " BIM-based planning of temporary structures for construction safety." 2015 Int. Workshop on Computing in Civil Engineering, ASCE, Reston, VA, 436-444.
-
(2015)
BIM-based Planning of Temporary Structures for Construction Safety
, pp. 436-444
-
-
Kim, K.1
Cho, Y.K.2
-
13
-
-
84982847693
-
Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM
-
Kim, K., Cho, Y. K., and, Zhang, S. (2016). " Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM." Autom. Constr, 70, 128-142. 10.1016/j.autcon.2016.06.012
-
(2016)
Autom. Constr
, vol.70
, pp. 128-142
-
-
Kim, K.1
Cho, Y.K.2
Zhang, S.3
-
14
-
-
58949083695
-
Development of a mobile safety monitoring system for construction sites
-
Lee, U.-K., Kim, J.-H., Cho, H., and, Kang, K.-I. (2009). " Development of a mobile safety monitoring system for construction sites." Autom. Constr., 18 (3), 258-264. 10.1016/j.autcon.2008.08.002
-
(2009)
Autom. Constr.
, vol.18
, Issue.3
, pp. 258-264
-
-
Lee, U.-K.1
Kim, J.-H.2
Cho, H.3
Kang, K.-I.4
-
15
-
-
84964215307
-
-
OSHA (Occupational Safety and Health Administration). (Mar. 6, 2016)
-
OSHA (Occupational Safety and Health Administration). (2014). " Commonly used statistics." (https://www.osha.gov/oshstats/commonstats.html) (Mar. 6, 2016).
-
(2014)
Commonly Used Statistics
-
-
-
16
-
-
85010295216
-
-
OSHA (Occupational Safety and Health Administration). (Mar. 6, 2016)
-
OSHA (Occupational Safety and Health Administration). (2016). " Competent person." (https://www.osha.gov/SLTC/competentperson/) (Mar. 6, 2016).
-
(2016)
Competent Person
-
-
-
17
-
-
84976343009
-
A wireless tracking system integrated with BIM for indoor construction applications
-
ASCE, Reston, VA
-
Park, J., Cho, Y. K., Ahn, C., and, Ahan, C. R. (2016 a). " A wireless tracking system integrated with BIM for indoor construction applications." Construction Research Congress 2016, ASCE, Reston, VA, 2660-2668.
-
(2016)
Construction Research Congress 2016
, pp. 2660-2668
-
-
Park, J.1
Cho, Y.K.2
Ahn, C.3
Ahan, C.R.4
-
18
-
-
84994301787
-
Field construction management application through mobile BIM and location tracking technology
-
International Association for Automation and Robotics in Construction (IAARC), Auburn, AL
-
Park, J., Cho, Y. K., and, Kim, K. (2016 b). " Field construction management application through mobile BIM and location tracking technology." Proc., 33rd Int. Symp. on Automation and Robotics in Construction and Mining (ISARC 2016), International Association for Automation and Robotics in Construction (IAARC), Auburn, AL.
-
(2016)
Proc. 33rd Int. Symp. on Automation and Robotics in Construction and Mining (ISARC 2016)
-
-
Park, J.1
Cho, Y.K.2
Kim, K.3
-
19
-
-
84994337341
-
Direction aware bluetooth low energy based proximity detection system for construction work zone safety
-
International Association for Automation and Robotics in Construction (IAARC), Auburn, AL
-
Park, J., Cho, Y. K., and, Timalsina, S. (2016 c). " Direction aware bluetooth low energy based proximity detection system for construction work zone safety." Proc., 33rd Int. Symp. on Automation and Robotics in Construction and Mining (ISARC 2016), International Association for Automation and Robotics in Construction (IAARC), Auburn, AL.
-
(2016)
Proc. 33rd Int. Symp. on Automation and Robotics in Construction and Mining (ISARC 2016)
-
-
Park, J.1
Cho, Y.K.2
Timalsina, S.3
-
20
-
-
84950119153
-
Performance test of wireless technologies for personnel and equipment proximity sensing in work zones
-
04015049
-
Park, J., Marks, E., Cho, Y., and, Suryanto, W. (2015). " Performance test of wireless technologies for personnel and equipment proximity sensing in work zones." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001031, 04015049. JCEMD4 0733-9364
-
(2015)
J. Constr. Eng. Manage.
-
-
Park, J.1
Marks, E.2
Cho, Y.3
Suryanto, W.4
-
21
-
-
84901938850
-
CoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces
-
Riaz, Z., Arslan, M., Kiani, A. K., and, Azhar, S. (2014). " CoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces." Autom. Constr., 45, 96-106. 10.1016/j.autcon.2014.05.010
-
(2014)
Autom. Constr.
, vol.45
, pp. 96-106
-
-
Riaz, Z.1
Arslan, M.2
Kiani, A.K.3
Azhar, S.4
-
22
-
-
85010442304
-
-
SAE International, Warrendale, PA
-
Ruff, T. M., and, Frederick, L. D. (2007). " Development and testing of a tag-based backup warning system for construction equipment." SAE International, Warrendale, PA.
-
(2007)
Development and Testing of A Tag-based Backup Warning System for Construction Equipment
-
-
Ruff, T.M.1
Frederick, L.D.2
-
23
-
-
58149259941
-
Methodology for automating the identification and localization of construction components on industrial projects
-
Torrent, D., and, Caldas, C. (2009). " Methodology for automating the identification and localization of construction components on industrial projects." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2009)23:1(3), 3-13. JCCEE5 0887-3801
-
(2009)
J. Comput. Civ. Eng.
, pp. 3-13
-
-
Torrent, D.1
Caldas, C.2
|