-
1
-
-
84887337502
-
BIM Handbook: A Guide to Building Information Modeling for Owners
-
Eastman, C., Teicholz, P., Sacks, R., and Liston, K. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. Building (Vol. 2). doi:10.1002/9780470261309, 2011.
-
(2011)
Managers, Designers, Engineers and Contractors. Building
, vol.2
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
2
-
-
38649110133
-
Enhancing construction quality inspection and management using RFID technology
-
Wang, L. C. Enhancing construction quality inspection and management using RFID technology. Automation in Construction, 17(4), 467-479. doi:10.1016/j.autcon.2007.08.005, 2008.
-
(2008)
Automation in Construction
, vol.17
, Issue.4
, pp. 467-479
-
-
Wang, L.C.1
-
3
-
-
14544274600
-
The application of PDA as mobile computing system on construction management
-
Kimoto, K., Endo, K., Iwashita, S., and Fujiwara, M. The application of PDA as mobile computing system on construction management. Automation in Construction, 14(4), 500-511. doi:10.1016/j.autcon.2004.09.003, 2005.
-
(2005)
Automation in Construction
, vol.14
, Issue.4
, pp. 500-511
-
-
Kimoto, K.1
Endo, K.2
Iwashita, S.3
Fujiwara, M.4
-
4
-
-
34548830169
-
A PDA and wireless web-integrated system for quality inspection and defect management of apartment housing projects
-
Kim, Y. S., Oh, S. W., Cho, Y. K., and Seo, J. W. A PDA and wireless web-integrated system for quality inspection and defect management of apartment housing projects. Automation in Construction, 17(2), 163-179. doi:10.1016/j.autcon.2007.03.006, 2008.
-
(2008)
Automation in Construction
, vol.17
, Issue.2
, pp. 163-179
-
-
Kim, Y.S.1
Oh, S.W.2
Cho, Y.K.3
Seo, J.W.4
-
6
-
-
84888386805
-
An Augmented 3D iPad Mobile Application for Communication, Collaboration, and Learning (CCL) of Building MEP Systems
-
Shen, Z. Z., and Jiang, L. An Augmented 3D iPad Mobile Application for Communication, Collaboration, and Learning (CCL) of Building MEP Systems. In Computing in Civil Engineering (pp. 204-212)., 2012.
-
(2012)
In Computing in Civil Engineering
, pp. 204-212
-
-
Shen, Z.Z.1
Jiang, L.2
-
9
-
-
84925706478
-
Real-time visualization of building information models (BIM)
-
Johansson, M., Roupé, M., and Bosch-Sijtsema, P. Real-time visualization of building information models (BIM). Automation in Construction, 54, 69-82. doi:10.1016/j.autcon.2015.03.018, 2015.
-
(2015)
Automation in Construction
, vol.54
, pp. 69-82
-
-
Johansson, M.1
Roupé, M.2
Bosch-Sijtsema, P.3
-
10
-
-
84958592722
-
Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm
-
Kim, K., Walewski, J., and Cho, Y. K. Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm. Journal of Management in Engineering, 04015038. doi:10.1061/(ASCE)ME.1943-5479.0000374, 2015.
-
(2015)
Journal of Management in Engineering
-
-
Kim, K.1
Walewski, J.2
Cho, Y.K.3
-
11
-
-
84863748096
-
Automated building information modeling system for building interior to improve productivity of bim-based quantity take-off
-
Kim, S. A., Chin, S., Yoon, S. W., Shin, T. H., Kim, Y. S., and Choi, C. Automated building information modeling system for building interior to improve productivity of bim-based quantity take-off. 2009 26th International Symposium on Automation and Robotics in Construction, ISARC 2009, 492-496., 2009.
-
(2009)
2009 26th International Symposium on Automation and Robotics in Construction, ISARC 2009
, pp. 492-496
-
-
Kim, S.A.1
Chin, S.2
Yoon, S.W.3
Shin, T.H.4
Kim, Y.S.5
Choi, C.6
-
12
-
-
84863739621
-
Scan to BIM: Factors affecting operational and computational errors and productivity loss
-
Hajian, H., and Becerik-Gerber, B. Scan to BIM: factors affecting operational and computational errors and productivity loss. 27th International Symposium on Automation and Robotics in Construction, (Isarc), 265-272., 2010.
-
(2010)
27th International Symposium on Automation and Robotics in Construction, (Isarc)
, pp. 265-272
-
-
Hajian, H.1
Becerik-Gerber, B.2
-
14
-
-
84928163215
-
Automatic BIM Component Extraction from Point Clouds of Existing Buildings for Sustainability Applications
-
Wang, C., Cho, Y., and Kim, C. Automatic BIM Component Extraction from Point Clouds of Existing Buildings for Sustainability Applications. Automation in Construction, 56, 1-13. doi:10.1016/j.autcon.2015.04.001, 2015.
-
(2015)
Automation in Construction
, vol.56
, pp. 1-13
-
-
Wang, C.1
Cho, Y.2
Kim, C.3
-
15
-
-
63549085077
-
Evaluation of position tracking technologies for user localization in indoor construction environments
-
Khoury, H. M., and Kamat, V. R. Evaluation of position tracking technologies for user localization in indoor construction environments. Automation in Construction, 18(4), 444-457. doi:10.1016/j.autcon.2008.10.011, 2009.
-
(2009)
Automation in Construction
, vol.18
, Issue.4
, pp. 444-457
-
-
Khoury, H.M.1
Kamat, V.R.2
-
16
-
-
58149259941
-
Methodology for Automating the Identification and Localization of Construction Components on Industrial Projects
-
Torrent, D. G., and Caldas, C. H. Methodology for Automating the Identification and Localization of Construction Components on Industrial Projects. Journal of Computing in Civil Engineering, 23(1), 3-13. doi:10.1061/(ASCE)0887-3801(2009)23:1(3), 2009.
-
(2009)
Journal of Computing in Civil Engineering
, vol.23
, Issue.1
, pp. 3-13
-
-
Torrent, D.G.1
Caldas, C.H.2
-
17
-
-
68049115666
-
Assessing the impact of materials tracking technologies on construction craft productivity
-
Grau, D., Caldas, C. H., Haas, C. T., Goodrum, P. M., and Gong, J. Assessing the impact of materials tracking technologies on construction craft productivity. Automation in Construction, 18(7), 903-911. doi:10.1016/j.autcon.2009.04.001, 2009.
-
(2009)
Automation in Construction
, vol.18
, Issue.7
, pp. 903-911
-
-
Grau, D.1
Caldas, C.H.2
Haas, C.T.3
Goodrum, P.M.4
Gong, J.5
-
18
-
-
70449708995
-
Error modeling for an untethered ultra-wideband system for construction indoor asset tracking
-
Cho, Y. K., Youn, J. H., and Martinez, D. Error modeling for an untethered ultra-wideband system for construction indoor asset tracking. Automation in Construction, 19(1), 43-54. doi:10.1016/j.autcon.2009.08.001, 2010.
-
(2010)
Automation in Construction
, vol.19
, Issue.1
, pp. 43-54
-
-
Cho, Y.K.1
Youn, J.H.2
Martinez, D.3
-
19
-
-
84936875181
-
Mobile Proximity Sensing Technologies for Personnel and Equipment Safety in Work Zones
-
Park, J., Marks, E., Cho, Y., and Suryanto, W. Mobile Proximity Sensing Technologies for Personnel and Equipment Safety in Work Zones. In Computing in Civil Engineering (pp. pp. 41-48), 2015.
-
(2015)
Computing in Civil Engineering
, pp. 41-48
-
-
Park, J.1
Marks, E.2
Cho, Y.3
Suryanto, W.4
-
21
-
-
84975284896
-
Case Study of BIM and Cloud-Enabled Real-Time RFID Indoor Localization for Construction Management Applications
-
Fang, Y., Cho, Y. K., Zhang, S., and Perez, E. Case Study of BIM and Cloud-Enabled Real-Time RFID Indoor Localization for Construction Management Applications. Journal of Construction Engineering and Management., 2016.
-
(2016)
Journal of Construction Engineering and Management
-
-
Fang, Y.1
Cho, Y.K.2
Zhang, S.3
Perez, E.4
-
22
-
-
84904663864
-
Passive RFID and BIM for Real-Time Visualization and Location Tracking
-
Proceedings of the Construction Research Congress
-
Costin, A., Pradhananga, N., and Teizer, J. Passive RFID and BIM for Real-Time Visualization and Location Tracking. In Construction Research Congress (pp. 169-178). Proceedings of the Construction Research Congress., 2014.
-
(2014)
In Construction Research Congress
, pp. 169-178
-
-
Costin, A.1
Pradhananga, N.2
Teizer, J.3
-
23
-
-
84976343009
-
Wireless Tracking System Integrated with BIM for Indoor Construction Applications
-
San Juan, Puerto Rico
-
Park, J., Cho, Y. K., and Ahn, C. Wireless Tracking System Integrated with BIM for Indoor Construction Applications. In Proceedings of The 2016 Construction Research Congress (CRC). San Juan, Puerto Rico., 2016.
-
(2016)
In Proceedings of the 2016 Construction Research Congress (CRC)
-
-
Park, J.1
Cho, Y.K.2
Ahn, C.3
|