메뉴 건너뛰기




Volumn 2015-January, Issue January, 2015, Pages 436-444

BIM-based planning of temporary structures for construction safety

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION INDUSTRY; ROOFS; SAFETY ENGINEERING; SCAFFOLDS; STAIRS; TOWERS;

EID: 84936865115     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/9780784479247.054     Document Type: Conference Paper
Times cited : (23)

References (10)
  • 1
    • 41749088228 scopus 로고    scopus 로고
    • Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models
    • Jongeling, R., Kim, J., Fischer, M., Mourgues, C., Olofsson, T., (2008) "Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models." J. Aut. in Constr., 17 (6), 780-791.
    • (2008) J. Aut. in Constr. , vol.17 , Issue.6 , pp. 780-791
    • Jongeling, R.1    Kim, J.2    Fischer, M.3    Mourgues, C.4    Olofsson, T.5
  • 2
    • 84936884954 scopus 로고    scopus 로고
    • Semiautomated scaffolding planning: Development of the feature lexicon for computer application
    • Kim, J., Fischer, M., Kunz, J., Levitt, R. (2014). "Semiautomated Scaffolding Planning: Development of the Feature Lexicon for Computer Application." J. Computing in Civil Engr.
    • (2014) J. Computing in Civil Engr
    • Kim, J.1    Fischer, M.2    Kunz, J.3    Levitt, R.4
  • 4
    • 84893800019 scopus 로고    scopus 로고
    • Automated design and planning of scaffolding systems using building information modeling
    • Kim, K., Teizer, J. (2014). "Automated design and planning of scaffolding systems using building information modeling." J. Adv. Engr. Informatics, 28, 66-80.
    • (2014) J. Adv. Engr. Informatics , vol.28 , pp. 66-80
    • Kim, K.1    Teizer, J.2
  • 5
    • 84893731238 scopus 로고    scopus 로고
    • The development of automatic module for formwork layout using the BIM
    • Lee, C., Ham, S., Lee, G. (2009). "The development of automatic module for formwork layout using the BIM." Proc., ICCEM/ICCPM, Vol. 3, 1266-1271.
    • (2009) Proc., ICCEM/ICCPM , vol.3 , pp. 1266-1271
    • Lee, C.1    Ham, S.2    Lee, G.3
  • 8
    • 84936852473 scopus 로고    scopus 로고
    • Smart Scaffolder, (Dec. 20, 2014)
    • Smart Scaffolder (2014). "BIM Toolbox", (Dec. 20, 2014
    • (2014) BIM Toolbox
  • 10
    • 84869092675 scopus 로고    scopus 로고
    • Building information modeling (BIM) and safety: Automatic safety checking of construction models and schedules
    • Zhang, S., Teizer, J., Lee, J. K., Eastman, C. M., & Venugopal, M. (2013). "Building information modeling (BIM) and safety: Automatic safety checking of construction models and schedules." J. Aut. in Constr., 29, 183-195.
    • (2013) J. Aut. in Constr. , vol.29 , pp. 183-195
    • Zhang, S.1    Teizer, J.2    Lee, J.K.3    Eastman, C.M.4    Venugopal, M.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.