-
2
-
-
84887298155
-
Development of both the AIS and PSO for solving the flexible job shop scheduling problem
-
Sadrzadeh A. Development of both the AIS and PSO for solving the flexible job shop scheduling problem. Arab J Sci Eng 2013;38(12):3593–3604.
-
(2013)
Arab J Sci Eng
, vol.38
, Issue.12
, pp. 3593-3604
-
-
Sadrzadeh, A.1
-
3
-
-
0036306106
-
A multi-agent-based agile shop floor control system
-
Chan FTS, Zhang J. A multi-agent-based agile shop floor control system. Int J Adv Manuf Technol 2002;19(10):764–774.
-
(2002)
Int J Adv Manuf Technol
, vol.19
, Issue.10
, pp. 764-774
-
-
Chan, F.T.S.1
Zhang, J.2
-
4
-
-
77956877124
-
The Internet of things: a survey
-
Atzori L, Iera A, Morabito, G. The Internet of things: a survey. Comput Netw 2010;54(15):2787–2805.
-
(2010)
Comput Netw
, vol.54
, Issue.15
, pp. 2787-2805
-
-
Atzori, L.1
Iera, A.2
Morabito, G.3
-
5
-
-
84975790661
-
Wireless manufacturing: a literature review, recent developments, and case studies
-
Huang G, Wright PK, Newman ST. Wireless manufacturing: a literature review, recent developments, and case studies. Int J Comput Integr Manuf 2009;22(7):579–594.
-
(2009)
Int J Comput Integr Manuf
, vol.22
, Issue.7
, pp. 579-594
-
-
Huang, G.1
Wright, P.K.2
Newman, S.T.3
-
6
-
-
84929606599
-
Real-time information capturing and integration framework of the Internet of manufacturing things
-
Zhang Y, Zhang G, Wang J, Sun S, Si S, Yang T. Real-time information capturing and integration framework of the Internet of manufacturing things. Int J Comput Integr Manuf 2015;28(8):811–822.
-
(2015)
Int J Comput Integr Manuf
, vol.28
, Issue.8
, pp. 811-822
-
-
Zhang, Y.1
Zhang, G.2
Wang, J.3
Sun, S.4
Si, S.5
Yang, T.6
-
7
-
-
84870947362
-
A case of implementing rfid-based real-time shop-floor material management for household electrical appliance manufacturers
-
Qu T, Yang H, Huang GQ, Zhang Y, Luo H, Qin W. A case of implementing rfid-based real-time shop-floor material management for household electrical appliance manufacturers. J Intell Manuf 2012;23:2343–2356.
-
(2012)
J Intell Manuf
, vol.23
, pp. 2343-2356
-
-
Qu, T.1
Yang, H.2
Huang, G.Q.3
Zhang, Y.4
Luo, H.5
Qin, W.6
-
8
-
-
84929470231
-
Real-time information driven intelligent navigation method of assembly station in unpaced line
-
Zhang Y, Xu J, Sun S, Yang T. Real-time information driven intelligent navigation method of assembly station in unpaced line. Comput Ind Eng 2015;84:91–100.
-
(2015)
Comput Ind Eng
, vol.84
, pp. 91-100
-
-
Zhang, Y.1
Xu, J.2
Sun, S.3
Yang, T.4
-
9
-
-
84929502166
-
An optimization method for shopfloor material handling based on real-time and multi-source manufacturing data
-
Zhang Y, Zhang G, Du W, Wang J, Ali E, Sun S. An optimization method for shopfloor material handling based on real-time and multi-source manufacturing data. Int J Prod Econ 2015;165: 282–292.
-
(2015)
Int J Prod Econ
, vol.165
, pp. 282-292
-
-
Zhang, Y.1
Zhang, G.2
Du, W.3
Wang, J.4
Ali, E.5
Sun, S.6
-
10
-
-
84949818116
-
IoT-enabled real-time production performance analysis and exception diagnosis model
-
Zhang Y, Wang W, Wu N, Qian C. IoT-enabled real-time production performance analysis and exception diagnosis model. IEEE Trans Autom Sci Eng 2016;13(3):1318–1332.
-
(2016)
IEEE Trans Autom Sci Eng
, vol.13
, Issue.3
, pp. 1318-1332
-
-
Zhang, Y.1
Wang, W.2
Wu, N.3
Qian, C.4
-
11
-
-
84929502678
-
A big data approach for logistics trajectory discovery from RFID-enabled production data
-
Zhong R, Huang G, Lan S, Dai Q, Chen X, Zhang T. A big data approach for logistics trajectory discovery from RFID-enabled production data. Int J Prod Econ 2015;165: 260–272.
-
(2015)
Int J Prod Econ
, vol.165
, pp. 260-272
-
-
Zhong, R.1
Huang, G.2
Lan, S.3
Dai, Q.4
Chen, X.5
Zhang, T.6
-
12
-
-
84894037214
-
Strengthening the competitiveness and sustainability of a semiconductor manufacturer with cloud manufacturing
-
Chen T. Strengthening the competitiveness and sustainability of a semiconductor manufacturer with cloud manufacturing. Sustainability 2014;6(1):251–266.
-
(2014)
Sustainability
, vol.6
, Issue.1
, pp. 251-266
-
-
Chen, T.1
-
13
-
-
84954212012
-
Smart box enabled product-service system for cloud logistics
-
Zhang Y, Liu S, Liu Y, Li R. Smart box enabled product-service system for cloud logistics. Int J Prod Res. doi: 10.1080/00207543.2015.1134840.
-
Int J Prod Res
-
-
Zhang, Y.1
Liu, S.2
Liu, Y.3
Li, R.4
-
14
-
-
84896931467
-
CCIoT-CMfg: cloud computing and Internet of things-based cloud manufacturing service system
-
Tao F, Cheng Y, Xu D, Zhang L, Li B. CCIoT-CMfg: cloud computing and Internet of things-based cloud manufacturing service system. IEEE Trans Ind Inform 2014;10:1435–1442.
-
(2014)
IEEE Trans Ind Inform
, vol.10
, pp. 1435-1442
-
-
Tao, F.1
Cheng, Y.2
Xu, D.3
Zhang, L.4
Li, B.5
-
15
-
-
84929120986
-
IoT-based real-time production logistics synchronization system under intelligent cloud manufacturing
-
Qu T, Lei S, Wang Z, Nie D, Chen X, Huang G. IoT-based real-time production logistics synchronization system under intelligent cloud manufacturing. Int J Adv Manuf Technol 2016;84(1):147–164.
-
(2016)
Int J Adv Manuf Technol
, vol.84
, Issue.1
, pp. 147-164
-
-
Qu, T.1
Lei, S.2
Wang, Z.3
Nie, D.4
Chen, X.5
Huang, G.6
-
16
-
-
84924688885
-
Research on services encapsulation and virtualization access model of machine for cloud manufacturing
-
Zhang Y, Zhang G, Liu Y, Hu D. Research on services encapsulation and virtualization access model of machine for cloud manufacturing. J Intell Manuf. doi: 10.1007/s10845-015-1064-2.
-
J Intell Manuf
-
-
Zhang, Y.1
Zhang, G.2
Liu, Y.3
Hu, D.4
-
17
-
-
84896964757
-
IoT-based intelligent perception and access of manufacturing resource toward cloud manufacturing
-
Tao F, Zuo Y, Xu L, Zhang L. IoT-based intelligent perception and access of manufacturing resource toward cloud manufacturing. IEEE Trans Ind Inform 2014;10(2):1547–1557.
-
(2014)
IEEE Trans Ind Inform
, vol.10
, Issue.2
, pp. 1547-1557
-
-
Tao, F.1
Zuo, Y.2
Xu, L.3
Zhang, L.4
-
18
-
-
85010273255
-
A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search
-
Moslehi G, Mahnam M. A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search. Control Theory A 2011;29(6), 715–722.
-
(2011)
Control Theory A
, vol.29
, Issue.6
, pp. 715-722
-
-
Moslehi, G.1
Mahnam, M.2
-
19
-
-
85010272975
-
-
In IEEE Int Conf on Computing Communication & Networking Technologies 2012, Shenzhen, China; December 7–9,, pp
-
Shivasankaran N, Senthil Kumar P, Venkatesh Raja K. Hybrid sorting immune simulated annealing algorithm for flexible job shop scheduling. In: IEEE Int Conf on Computing Communication & Networking Technologies 2012, Shenzhen, China; December 7–9, 2012. pp 1–5.
-
(2012)
Hybrid sorting immune simulated annealing algorithm for flexible job shop scheduling
, pp. 1-5
-
-
Shivasankaran, N.1
Senthil Kumar, P.2
Venkatesh Raja, K.3
-
20
-
-
84947021837
-
A mathematical model and genetic algorithm to cyclic flexible job shop scheduling problem
-
Jalilvand-Nejad A, Fattahi P. A mathematical model and genetic algorithm to cyclic flexible job shop scheduling problem. J Intell Manuf 2015;26(6):1085–1098.
-
(2015)
J Intell Manuf
, vol.26
, Issue.6
, pp. 1085-1098
-
-
Jalilvand-Nejad, A.1
Fattahi, P.2
-
22
-
-
33645275497
-
Agents that acquire negotiation strategies using a game theoretic learning theory
-
Nawa NE. Agents that acquire negotiation strategies using a game theoretic learning theory. Int J Intell Syst 2006;21(1):5–39.
-
(2006)
Int J Intell Syst
, vol.21
, Issue.1
, pp. 5-39
-
-
Nawa, N.E.1
-
23
-
-
84855179617
-
Beliefs correspondences and equilibria in ambiguous games
-
De MG, Maria R. Beliefs correspondences and equilibria in ambiguous games. Int J Intell Syst 2012;27(2), 86–107.
-
(2012)
Int J Intell Syst
, vol.27
, Issue.2
, pp. 86-107
-
-
De, M.G.1
Maria, R.2
-
24
-
-
1342287338
-
Solving the n-job 3-stage flexible flowshop scheduling problem using an agent-based approach
-
Babayan A, He D. Solving the n-job 3-stage flexible flowshop scheduling problem using an agent-based approach. Int J Prod Res 2004;42(4):777–799.
-
(2004)
Int J Prod Res
, vol.42
, Issue.4
, pp. 777-799
-
-
Babayan, A.1
He, D.2
-
25
-
-
28044472443
-
Job scheduling, cooperation, and control
-
Calleja P, EstéVez-FernáNdez A, Borm P, Hamers H. Job scheduling, cooperation, and control. Oper Res Lett 2006;34(1):22–28.
-
(2006)
Oper Res Lett
, vol.34
, Issue.1
, pp. 22-28
-
-
Calleja, P.1
EstéVez-FernáNdez, A.2
Borm, P.3
Hamers, H.4
-
26
-
-
84908603230
-
Evaluating strategic issues in supply chain scheduling using game theory
-
Mazdeh MM, Karamouzian A. Evaluating strategic issues in supply chain scheduling using game theory. Int J Prod Res 2014;52(23):7100–7113.
-
(2014)
Int J Prod Res
, vol.52
, Issue.23
, pp. 7100-7113
-
-
Mazdeh, M.M.1
Karamouzian, A.2
-
27
-
-
84896709266
-
Considering the game-theoretic approach and ultra combinative costs on scheduling
-
Arasteh A, Naini SGJ, Aliahmadi A. Considering the game-theoretic approach and ultra combinative costs on scheduling. Int J Adv Manuf Technol 2014;70:1473–1485.
-
(2014)
Int J Adv Manuf Technol
, vol.70
, pp. 1473-1485
-
-
Arasteh, A.1
Naini, S.G.J.2
Aliahmadi, A.3
-
28
-
-
84866275155
-
A game-theoretic analysis of grid job scheduling
-
Buscemi MG, Montanari U, Taneja S. A game-theoretic analysis of grid job scheduling. J Grid Comput 2012;10:501–519
-
(2012)
J Grid Comput
, vol.10
, pp. 501-519
-
-
Buscemi, M.G.1
Montanari, U.2
Taneja, S.3
-
29
-
-
34948816717
-
Games and mechanism design in machine scheduling-an introduction
-
Heydenreich B, Müller R, Uetz M. Games and mechanism design in machine scheduling-an introduction. Prod Oper Manag 2007;16(4):437–454.
-
(2007)
Prod Oper Manag
, vol.16
, Issue.4
, pp. 437-454
-
-
Heydenreich, B.1
Müller, R.2
Uetz, M.3
-
30
-
-
67649644837
-
-
In IEEE Int Conf on Knowledge Acquisition and Modeling Workshop 2008,Wuhan, China; December 21–22,, pp
-
Zhou Y, Gu X. Research on flow shop scheduling problem with multi-customer and fuzzy due date based on non-cooperative games. In: IEEE Int Conf on Knowledge Acquisition and Modeling Workshop 2008,Wuhan, China; December 21–22, 2008. pp 757–760.
-
(2008)
Research on flow shop scheduling problem with multi-customer and fuzzy due date based on non-cooperative games
, pp. 757-760
-
-
Zhou, Y.1
Gu, X.2
-
32
-
-
78649506002
-
A game-theoretic approach to generating optimal process plans of multiple jobs in networked manufacturing
-
Zhou G, Xiao Z, Jiang P, Huang G. A game-theoretic approach to generating optimal process plans of multiple jobs in networked manufacturing. Int J Comput Integr Manuf 2010;23(12):1118–1132.
-
(2010)
Int J Comput Integr Manuf
, vol.23
, Issue.12
, pp. 1118-1132
-
-
Zhou, G.1
Xiao, Z.2
Jiang, P.3
Huang, G.4
-
33
-
-
84867049964
-
Optimal process plan selection in networked based manufacturing using game-theoretic approach
-
Manupati VK, Deo S, Cheikhrouhou N, Tiwari MK. Optimal process plan selection in networked based manufacturing using game-theoretic approach. Int J Prod Res 2012;50(18):5239–5258.
-
(2012)
Int J Prod Res
, vol.50
, Issue.18
, pp. 5239-5258
-
-
Manupati, V.K.1
Deo, S.2
Cheikhrouhou, N.3
Tiwari, M.K.4
-
34
-
-
81855178211
-
Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling
-
Li X, Gao L, Li W. Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling. Expert Syst Appl 2012;39(1):288–297.
-
(2012)
Expert Syst Appl
, vol.39
, Issue.1
, pp. 288-297
-
-
Li, X.1
Gao, L.2
Li, W.3
-
35
-
-
84867049964
-
Optimal process plan selection in networked based manufacturing using game-theoretic approach
-
Manupati VK, Deo S, Cheikhrouhou N, Tiwari MK. Optimal process plan selection in networked based manufacturing using game-theoretic approach. Int J Prod Res 2012;50(18):5239–5258.
-
(2012)
Int J Prod Res
, vol.50
, Issue.18
, pp. 5239-5258
-
-
Manupati, V.K.1
Deo, S.2
Cheikhrouhou, N.3
Tiwari, M.K.4
-
36
-
-
84902793346
-
Scheduling flexible job shop problem subject to machine breakdown with game theory
-
Sun D, He W, Zheng L, Liao X. Scheduling flexible job shop problem subject to machine breakdown with game theory. Int J Prod Res 2014;52(13), 3858–3876.
-
(2014)
Int J Prod Res
, vol.52
, Issue.13
, pp. 3858-3876
-
-
Sun, D.1
He, W.2
Zheng, L.3
Liao, X.4
-
37
-
-
85010264307
-
An existence distinguishing method for pure strategy Nash equilibrium existence in n-person static games
-
Li ZL. An existence distinguishing method for pure strategy Nash equilibrium existence in n-person static games. Oper Res Manag 2004;13(1):33–37.
-
(2004)
Oper Res Manag
, vol.13
, Issue.1
, pp. 33-37
-
-
Li, Z.L.1
-
38
-
-
0030676526
-
A rolling horizon job shop rescheduling strategy in the dynamic environment
-
Fang J, Xi Y. A rolling horizon job shop rescheduling strategy in the dynamic environment. Int J Adv Manuf Technol 1997;13(3), 227–232.
-
(1997)
Int J Adv Manuf Technol
, vol.13
, Issue.3
, pp. 227-232
-
-
Fang, J.1
Xi, Y.2
-
39
-
-
67749116482
-
Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop
-
Gholami M, Zandieh M. Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop. J Intell Manuf 2009;20(4):481–498.
-
(2009)
J Intell Manuf
, vol.20
, Issue.4
, pp. 481-498
-
-
Gholami, M.1
Zandieh, M.2
-
40
-
-
85014892131
-
Agent and cyber-physical system based self-organizing and self-adaptive intelligent shopfloor
-
Zhang Y, Qian C, Lv J, Liu Y. Agent and cyber-physical system based self-organizing and self-adaptive intelligent shopfloor. IEEE Trans Ind Inform 2016. DOI: 10.1109/TII.2016.2618892.
-
IEEE Trans Ind Inform 2016
-
-
Zhang, Y.1
Qian, C.2
Lv, J.3
Liu, Y.4
|