메뉴 건너뛰기




Volumn 165, Issue , 2015, Pages 282-292

An optimization method for shopfloor material handling based on real-time and multi-source manufacturing data

Author keywords

Dynamical optimization; Intelligent trolley; Material handling; Real time and multi source data

Indexed keywords

AUTOMOTIVE INDUSTRY; MANUFACTURE; OPTIMIZATION;

EID: 84929502166     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2014.12.029     Document Type: Article
Times cited : (80)

References (32)
  • 1
    • 33747090241 scopus 로고    scopus 로고
    • Material delivery problems in construction projects: a possible solution
    • T. Ala-Risku, and M. Kärkkäinen Material delivery problems in construction projects: a possible solution Int. J. Prod. Econ. 104 1 2006 19 29
    • (2006) Int. J. Prod. Econ. , vol.104 , Issue.1 , pp. 19-29
    • Ala-Risku, T.1    Kärkkäinen, M.2
  • 2
    • 0032026875 scopus 로고    scopus 로고
    • Integrated scheduling of material handling and manufacturing activitiesfor just-in-time production of complex assemblies
    • M.F. Anwar, and R. Nagi Integrated scheduling of material handling and manufacturing activitiesfor just-in-time production of complex assemblies Int. J. Prod. Res. 36 3 1998 653 681
    • (1998) Int. J. Prod. Res. , vol.36 , Issue.3 , pp. 653-681
    • Anwar, M.F.1    Nagi, R.2
  • 3
    • 33749560720 scopus 로고    scopus 로고
    • Exact and heuristic procedures for the material handling circular flow path design problem
    • A. Asef-Vaziri, G. Laporte, and R. Ortiz Exact and heuristic procedures for the material handling circular flow path design problem Eur. J. Oper. Res. 176 2 2007 707 726
    • (2007) Eur. J. Oper. Res. , vol.176 , Issue.2 , pp. 707-726
    • Asef-Vaziri, A.1    Laporte, G.2    Ortiz, R.3
  • 4
    • 0030146122 scopus 로고    scopus 로고
    • A formalism for modelling intelligent control of material handling equipment in a distribution centre
    • S. Basu, V.M. Huynh, and S.P. Dutta A formalism for modelling intelligent control of material handling equipment in a distribution centre Int. J. Prod. Res. 34 5 1996 1381 1398
    • (1996) Int. J. Prod. Res. , vol.34 , Issue.5 , pp. 1381-1398
    • Basu, S.1    Huynh, V.M.2    Dutta, S.P.3
  • 5
    • 84872120258 scopus 로고    scopus 로고
    • Optimal fleet size, delivery routes, and workforce assignments for the vehiclerouting problem with manual materials handling
    • P. Boonprasurt, and S. Nanthavanij Optimal fleet size, delivery routes, and workforce assignments for the vehiclerouting problem with manual materials handling Int. J. Ind. Eng. 19 6 2012 252 263
    • (2012) Int. J. Ind. Eng. , vol.19 , Issue.6 , pp. 252-263
    • Boonprasurt, P.1    Nanthavanij, S.2
  • 6
    • 70349414335 scopus 로고    scopus 로고
    • Improving distribution operations: implementation of material handling systems
    • S.S. Chakravorty Improving distribution operations: implementation of material handling systems Int. J. Prod. Econ. 122 1 2009 89 106
    • (2009) Int. J. Prod. Econ. , vol.122 , Issue.1 , pp. 89-106
    • Chakravorty, S.S.1
  • 7
    • 33144466718 scopus 로고    scopus 로고
    • Design of a RFID case-based resource management system for warehouse operations
    • H.K.H. Chow, K.L. Choy, W.B. Lee, and K.C. Lau Design of a RFID case-based resource management system for warehouse operations Expert Syst. Appl. 30 4 2006 561 576
    • (2006) Expert Syst. Appl. , vol.30 , Issue.4 , pp. 561-576
    • Chow, H.K.H.1    Choy, K.L.2    Lee, W.B.3    Lau, K.C.4
  • 8
    • 33846270881 scopus 로고    scopus 로고
    • RFID for better supply-chain management through enhanced information visibility
    • D. Delen, B.C. Hardgrave, and R. Sharda RFID for better supply-chain management through enhanced information visibility Prod. Oper. Manag. 16 5 2007 613 624
    • (2007) Prod. Oper. Manag. , vol.16 , Issue.5 , pp. 613-624
    • Delen, D.1    Hardgrave, B.C.2    Sharda, R.3
  • 9
    • 80051549702 scopus 로고    scopus 로고
    • An RFID application in large job shop remanufacturing operations
    • G. Ferrer, S.K. Heath, and N. Dew An RFID application in large job shop remanufacturing operations Int. J. Prod. Econ. 113 2 2011 612 621
    • (2011) Int. J. Prod. Econ. , vol.113 , Issue.2 , pp. 612-621
    • Ferrer, G.1    Heath, S.K.2    Dew, N.3
  • 10
    • 0000909974 scopus 로고
    • Design of material flow networks in manufacturing facilities
    • J.W. Herrmann, G. Ioannou, and I. Minis Design of material flow networks in manufacturing facilities J. Manuf. Syst. 14 4 1995 277 289
    • (1995) J. Manuf. Syst. , vol.14 , Issue.4 , pp. 277-289
    • Herrmann, J.W.1    Ioannou, G.2    Minis, I.3
  • 11
    • 84975790661 scopus 로고    scopus 로고
    • Wireless manufacturing: a literature review, recent developments, and case studies
    • G.Q. Huang, P.K. Wright, and S.T. Newman Wireless manufacturing: a literature review, recent developments, and case studies Int. J. Comput. Integr. Manuf. 22 7 2009 579 594
    • (2009) Int. J. Comput. Integr. Manuf. , vol.22 , Issue.7 , pp. 579-594
    • Huang, G.Q.1    Wright, P.K.2    Newman, S.T.3
  • 12
    • 33947606713 scopus 로고    scopus 로고
    • RFID-based wireless manufacturing for walking-worker assembly islands with fixed-position layouts
    • G.Q. Huang, Y.F. Zhang, and P.Y. Jiang RFID-based wireless manufacturing for walking-worker assembly islands with fixed-position layouts Robot. Comput.-Integr. Manuf. 23 2007 469 477
    • (2007) Robot. Comput.-Integr. Manuf. , vol.23 , pp. 469-477
    • Huang, G.Q.1    Zhang, Y.F.2    Jiang, P.Y.3
  • 13
    • 51849166450 scopus 로고    scopus 로고
    • RFID-based wireless manufacturing for real-time management of job shop WIP inventories
    • G.Q. Huang, Y.F. Zhang, and P.Y. Jiang RFID-based wireless manufacturing for real-time management of job shop WIP inventories Int. J. Adv. Manuf. Technol. 36 7-8 2008 752 764
    • (2008) Int. J. Adv. Manuf. Technol. , vol.36 , Issue.7-8 , pp. 752-764
    • Huang, G.Q.1    Zhang, Y.F.2    Jiang, P.Y.3
  • 14
    • 84864156107 scopus 로고    scopus 로고
    • RFID-enabled real-time wireless manufacturing for adaptive assembly planning and control
    • G.Q. Huang, Y.F. Zhang, and S. Newman RFID-enabled real-time wireless manufacturing for adaptive assembly planning and control J. Intell. Manuf. 19 6 2008 701 713
    • (2008) J. Intell. Manuf. , vol.19 , Issue.6 , pp. 701-713
    • Huang, G.Q.1    Zhang, Y.F.2    Newman, S.3
  • 15
    • 70449635407 scopus 로고    scopus 로고
    • Effective vehicle dispatching method minimising the blocking and delivery times in automatic material handling systems of 300 mm semiconductor fabrication
    • K. Im, K. Kim, T. Park, and S. Lee Effective vehicle dispatching method minimising the blocking and delivery times in automatic material handling systems of 300 mm semiconductor fabrication Int. J. Prod. Res. 47 14 2009 3997 4011
    • (2009) Int. J. Prod. Res. , vol.47 , Issue.14 , pp. 3997-4011
    • Im, K.1    Kim, K.2    Park, T.3    Lee, S.4
  • 16
    • 33748920331 scopus 로고    scopus 로고
    • Integrated production and material handling scheduling using mathematical programming and constraint programming
    • G.E. Khayat, A. Langevin, and D. Riopel Integrated production and material handling scheduling using mathematical programming and constraint programming Eur. J. Oper. Res. 175 3 2006 1818 1832
    • (2006) Eur. J. Oper. Res. , vol.175 , Issue.3 , pp. 1818-1832
    • Khayat, G.E.1    Langevin, A.2    Riopel, D.3
  • 17
    • 77957783895 scopus 로고    scopus 로고
    • A market-based approach for dynamic vehicle deployment planning using radio frequency identification (RFID) information
    • J. Kim, C. Ok, S. Kumara, and S. Yee A market-based approach for dynamic vehicle deployment planning using radio frequency identification (RFID) information Int. J. Prod. Econ. 128 1 2010 235 247
    • (2010) Int. J. Prod. Econ. , vol.128 , Issue.1 , pp. 235-247
    • Kim, J.1    Ok, C.2    Kumara, S.3    Yee, S.4
  • 18
    • 38749145862 scopus 로고    scopus 로고
    • Value analysis of location-enabled radio-frequency identification information on delivery chain performance
    • J. Kim, K. Tang, S. Kumara, S. Yee, and J. Tew Value analysis of location-enabled radio-frequency identification information on delivery chain performance Int. J. Prod. Econ. 112 1 2008 403 415
    • (2008) Int. J. Prod. Econ. , vol.112 , Issue.1 , pp. 403-415
    • Kim, J.1    Tang, K.2    Kumara, S.3    Yee, S.4    Tew, J.5
  • 19
    • 34249734716 scopus 로고    scopus 로고
    • Unlocking the value of RFID
    • H. Lee, and Ö. Özer Unlocking the value of RFID Prod. Oper. Manag. 16 1 2007 40 64
    • (2007) Prod. Oper. Manag. , vol.16 , Issue.1 , pp. 40-64
    • Lee, H.1    Özer, Ö.2
  • 20
    • 84892717180 scopus 로고    scopus 로고
    • Recent advances and trends in predictive manufacturing systems in big data environment
    • J. Lee, E. Lapira, B. Bagheri, and H.A. Kao Recent advances and trends in predictive manufacturing systems in big data environment Manufacturing Letters 1 1 2013 38 41
    • (2013) Manufacturing Letters , vol.1 , Issue.1 , pp. 38-41
    • Lee, J.1    Lapira, E.2    Bagheri, B.3    Kao, H.A.4
  • 21
    • 0032783936 scopus 로고    scopus 로고
    • Dispatching rail-guided vehicles and scheduling jobs in a flexible manufacturing system
    • J. Lee, and R. Maneesavet Dispatching rail-guided vehicles and scheduling jobs in a flexible manufacturing system Int. J. Prod. Res. 37 1 1999 111 123
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.1 , pp. 111-123
    • Lee, J.1    Maneesavet, R.2
  • 22
    • 24944496012 scopus 로고    scopus 로고
    • Multi objective vehicle routing and scheduling problem with time window constraints in hazardous material transportation
    • Q. Meng, D. Lee, and R.L. Cheu Multi objective vehicle routing and scheduling problem with time window constraints in hazardous material transportation J. Transp. Eng.-ASCE 131 9 2005 699 707
    • (2005) J. Transp. Eng.-ASCE , vol.131 , Issue.9 , pp. 699-707
    • Meng, Q.1    Lee, D.2    Cheu, R.L.3
  • 23
    • 84870947362 scopus 로고    scopus 로고
    • A case of implementing RFID-based real-time shop-floor material management for household electrical appliance manufactures
    • T. Qu, H.D. Yang, G.Q. Huang, Y.F. Zhang, H. Luo, and W. Qin A case of implementing RFID-based real-time shop-floor material management for household electrical appliance manufactures J. Intell. Manuf. 23 6 2012 2343 2356
    • (2012) J. Intell. Manuf. , vol.23 , Issue.6 , pp. 2343-2356
    • Qu, T.1    Yang, H.D.2    Huang, G.Q.3    Zhang, Y.F.4    Luo, H.5    Qin, W.6
  • 24
    • 0023313252 scopus 로고
    • Algorithms for the vehicle routing and scheduling problems with time window constraints
    • M.M. Solomon Algorithms for the vehicle routing and scheduling problems with time window constraints Oper. Res. 35 2 1987 254 265
    • (1987) Oper. Res. , vol.35 , Issue.2 , pp. 254-265
    • Solomon, M.M.1
  • 25
    • 25144483067 scopus 로고    scopus 로고
    • Analytic hierarchy process: an overview of applications
    • O.S. Vaidya, and S. Kumar Analytic hierarchy process: an overview of applications Eur. J. Oper. Res. 169 1 2006 1 29
    • (2006) Eur. J. Oper. Res. , vol.169 , Issue.1 , pp. 1-29
    • Vaidya, O.S.1    Kumar, S.2
  • 26
    • 0037103554 scopus 로고    scopus 로고
    • Design and analysis of optimal material distribution policies in flexible manufacturing systems using a single AGV
    • B. Veeravalli, G. Rajesh, and N. Viswanadham Design and analysis of optimal material distribution policies in flexible manufacturing systems using a single AGV Int. J. Prod. Res. 40 12 2002 2937 2954
    • (2002) Int. J. Prod. Res. , vol.40 , Issue.12 , pp. 2937-2954
    • Veeravalli, B.1    Rajesh, G.2    Viswanadham, N.3
  • 27
    • 79957517773 scopus 로고    scopus 로고
    • RFID-assisted assembly guidance system in an augmented reality environment
    • J. Zhang, S.K. Ong, and A.Y.C. Nee RFID-assisted assembly guidance system in an augmented reality environment Int. J. Prod. Res. 49 13 2011 3919 3938
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.13 , pp. 3919-3938
    • Zhang, J.1    Ong, S.K.2    Nee, A.Y.C.3
  • 28
    • 76249104439 scopus 로고    scopus 로고
    • Agent-based workflow management for RFID-enabled real-time reconfigurable manufacturing
    • Y.F. Zhang, G.Q. Huang, T. Qu, and K. Ho Agent-based workflow management for RFID-enabled real-time reconfigurable manufacturing Int. J. Comput. Integr. Manuf. 23 2 2010 101 112
    • (2010) Int. J. Comput. Integr. Manuf. , vol.23 , Issue.2 , pp. 101-112
    • Zhang, Y.F.1    Huang, G.Q.2    Qu, T.3    Ho, K.4
  • 29
    • 78650611354 scopus 로고    scopus 로고
    • Agent-based Smart Gateway for RFID-enabled real-time wireless manufacturing
    • Y.F. Zhang, T. Qu, O.K. Ho, and G.Q. Huang Agent-based Smart Gateway for RFID-enabled real-time wireless manufacturing Int. J. Prod. Res. 49 5 2011 1337 1352
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.5 , pp. 1337-1352
    • Zhang, Y.F.1    Qu, T.2    Ho, O.K.3    Huang, G.Q.4
  • 30
    • 84906538080 scopus 로고    scopus 로고
    • Multi-agent based real-time production scheduling method for radio frequency identification enabled ubiquitous shopfloor environment
    • Y.F. Zhang, G.Q. Huang, S.D. Sun, and T. Yang Multi-agent based real-time production scheduling method for radio frequency identification enabled ubiquitous shopfloor environment Int. J. of Comput. Ind. Eng. 76 2014 89 97
    • (2014) Int. J. of Comput. Ind. Eng. , vol.76 , pp. 89-97
    • Zhang, Y.F.1    Huang, G.Q.2    Sun, S.D.3    Yang, T.4
  • 32
    • 0141866718 scopus 로고    scopus 로고
    • A heuristic algorithm for solving hazardous materials distribution problems
    • K.G. Zografos, and K.N. Androutsopoulos A heuristic algorithm for solving hazardous materials distribution problems Eur. J. Oper. Res. 152 2 2004 507 519
    • (2004) Eur. J. Oper. Res. , vol.152 , Issue.2 , pp. 507-519
    • Zografos, K.G.1    Androutsopoulos, K.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.