메뉴 건너뛰기




Volumn 23, Issue 12, 2010, Pages 1118-1132

A game-theoretic approach to generating optimal process plans of multiple jobs in networked manufacturing

Author keywords

game theory; hybrid adaptive genetic algorithm; job scheduling; networked manufacturing; process plan

Indexed keywords

GENETIC ALGORITHMS; MANUFACTURE; SCHEDULING; SCHEDULING ALGORITHMS;

EID: 78649506002     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/0951192X.2010.524248     Document Type: Article
Times cited : (25)

References (16)
  • 1
    • 0000955243 scopus 로고
    • A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
    • Brandimarte, P. and Calderini, M., 1995. A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling. International Journal of Production Research, 33, 161-181.
    • (1995) International Journal of Production Research , vol.33 , pp. 161-181
    • Brandimarte, P.1    Calderini, M.2
  • 2
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • Huang, S. H., Zhang, H. C., and Smith, M. L., 1995. A progressive approach for the integration of process planning and scheduling. IIE Transactions, 27, 465-464.
    • (1995) IIE Transactions , vol.27 , pp. 465-464
    • Huang, S.H.1    Zhang, H.C.2    Smith, M.L.3
  • 4
    • 0037505510 scopus 로고    scopus 로고
    • A new game-theoretic framework for maintenance strategy analysis
    • Kim, B. H., 2003. A new game-theoretic framework for maintenance strategy analysis. IEEE Transactions on Power Systems, 18, 698-706.
    • (2003) IEEE Transactions on Power Systems , vol.18 , pp. 698-706
    • Kim, B.H.1
  • 5
    • 0032690982 scopus 로고    scopus 로고
    • Scheduling in a production environment with multiple process plans per job
    • Kim, K. H. and Egbelu, P. J., 1999. Scheduling in a production environment with multiple process plans per job. International Journal of Production Research, 37, 2725-2753.
    • (1999) International Journal of Production Research , vol.37 , pp. 2725-2753
    • Kim, K.H.1    Egbelu, P.J.2
  • 6
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • Kim, Y. K., Park, K., and Ko, J., 2003. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research, 30, 1151-1171.
    • (2003) Computers and Operations Research , vol.30 , pp. 1151-1171
    • Kim, Y.K.1    Park, K.2    Ko, J.3
  • 7
    • 33751504128 scopus 로고    scopus 로고
    • A simulated annealingbased optimization approach for integrated process planning and scheduling
    • Li, W. D. and McMahon, C. A., 2007. A simulated annealingbased optimization approach for integrated process planning and scheduling. International Journal of Computer Integrated Manufacturing, 20, 80-95.
    • (2007) International Journal of Computer Integrated Manufacturing , vol.20 , pp. 80-95
    • Li, W.D.1    McMahon, C.A.2
  • 8
    • 71749109550 scopus 로고    scopus 로고
    • An agent-based approach for integrated process planning and scheduling
    • Li, X. Y., et al., 2010. An agent-based approach for integrated process planning and scheduling. Expert Systems with Applications, 37, 1256-1264.
    • (2010) Expert Systems with Applications , vol.37 , pp. 1256-1264
    • Li, X.Y.1
  • 9
    • 0036642688 scopus 로고    scopus 로고
    • Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
    • Moon, C., Kim, J., and Hur, S., 2002. Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain. Computers and Industrial Engineering, 43, 331-349.
    • (2002) Computers and Industrial Engineering , vol.43 , pp. 331-349
    • Moon, C.1    Kim, J.2    Hur, S.3
  • 10
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing systems
    • Saygin, C. and Kilic, S. E., 1999. Integrating flexible process plans with scheduling in flexible manufacturing systems. International Journal of Advanced Manufacturing Technology, 15, 268-280.
    • (1999) International Journal of Advanced Manufacturing Technology , vol.15 , pp. 268-280
    • Saygin, C.1    Kilic, S.E.2
  • 11
    • 0003338433 scopus 로고    scopus 로고
    • Competitive coevolutionary multiagent systems: The application to mapping and scheduling problems
    • Seredynski, F., 1997. Competitive coevolutionary multiagent systems: the application to mapping and scheduling problems. Journal of Parallel and Distributed Computing, 47, 39-57.
    • (1997) Journal of Parallel and Distributed Computing , vol.47 , pp. 39-57
    • Seredynski, F.1
  • 12
    • 0032095166 scopus 로고    scopus 로고
    • Distributed scheduling using simple learning machines
    • Seredynski, F., 1998. Distributed scheduling using simple learning machines. European Journal of Operational Research, 107, 401-413.
    • (1998) European Journal of Operational Research , vol.107 , pp. 401-413
    • Seredynski, F.1
  • 13
    • 0342903339 scopus 로고    scopus 로고
    • Distributed multiprocessor scheduling with decomposed optimization criterion
    • Seredynski, F., Koronacki, J., and Janikow, C. Z., 2001. Distributed multiprocessor scheduling with decomposed optimization criterion. Future Generation Computer Systems, 17, 387-396.
    • (2001) Future Generation Computer Systems , vol.17 , pp. 387-396
    • Seredynski, F.1    Koronacki, J.2    Janikow, C.Z.3
  • 14
    • 0034627943 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data. Part 3: A framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule
    • Shafaei, R. and Brunn, P., 2000. Workshop scheduling using practical (inaccurate) data. Part 3: a framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule. International Journal of Production Research, 38, 85-99.
    • (2000) International Journal of Production Research , vol.38 , pp. 85-99
    • Shafaei, R.1    Brunn, P.2
  • 15
    • 56549112491 scopus 로고    scopus 로고
    • Integration of process planning and scheduling - A modified genetic algorithm-based approach
    • Shao, X. Y., et al., 2009. Integration of process planning and scheduling - A modified genetic algorithm-based approach. Computers and Operations Research, 36, 2082-2096.
    • (2009) Computers and Operations Research , vol.36 , pp. 2082-2096
    • Shao, X.Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.