메뉴 건너뛰기




Volumn 62, Issue 9, 2016, Pages 3020-3040

Data-driven mathematical modeling and global optimization framework for entire petrochemical planning operations

Author keywords

Big Data; global optimization; petrochemical; planning; refinery

Indexed keywords

BIG DATA; BLENDING; COMPUTATION THEORY; DISTILLATION; GLOBAL OPTIMIZATION; INTEGER PROGRAMMING; PLANNING; REFINING; USER INTERFACES;

EID: 84990248246     PISSN: 00011541     EISSN: 15475905     Source Type: Journal    
DOI: 10.1002/aic.15220     Document Type: Article
Times cited : (56)

References (49)
  • 1
    • 0037453788 scopus 로고    scopus 로고
    • Mixed-integer linear programming model for gasoline blending and distribution scheduling
    • Jia Z, Ierapetritou M. Mixed-integer linear programming model for gasoline blending and distribution scheduling. Ind Eng Chem Res. 2003;42(4):825–835.
    • (2003) Ind Eng Chem Res. , vol.42 , Issue.4 , pp. 825-835
    • Jia, Z.1    Ierapetritou, M.2
  • 2
    • 79960871270 scopus 로고    scopus 로고
    • Scheduling gasoline blending operations from recipe determination to shipping using unit slots
    • Li J, Karimi IA. Scheduling gasoline blending operations from recipe determination to shipping using unit slots. Ind Eng Chem Res. 2011;50(15):9156–9174.
    • (2011) Ind Eng Chem Res. , vol.50 , Issue.15 , pp. 9156-9174
    • Li, J.1    Karimi, I.A.2
  • 3
    • 74349131396 scopus 로고    scopus 로고
    • Recipe determination and scheduling of gasoline blending operations
    • Li J, Karimi IA, Srinivasan R. Recipe determination and scheduling of gasoline blending operations. AIChE J. 2010;56(2):441–465.
    • (2010) AIChE J. , vol.56 , Issue.2 , pp. 441-465
    • Li, J.1    Karimi, I.A.2    Srinivasan, R.3
  • 4
    • 35248883941 scopus 로고    scopus 로고
    • Improving the robustness and efficiency of crude scheduling algorithms
    • Li J, Li W, Karimi IA, Srinivasan R. Improving the robustness and efficiency of crude scheduling algorithms. AIChE J. 2007;53(10):2659–2680.
    • (2007) AIChE J. , vol.53 , Issue.10 , pp. 2659-2680
    • Li, J.1    Li, W.2    Karimi, I.A.3    Srinivasan, R.4
  • 5
    • 0034287620 scopus 로고    scopus 로고
    • Planning and scheduling models for refinery operations
    • Pinto JM, Joly M, Moro LFL. Planning and scheduling models for refinery operations. Comp Chem Eng. 2000;24(9–10):2259–2276.
    • (2000) Comp Chem Eng. , vol.24 , Issue.9-10 , pp. 2259-2276
    • Pinto, J.M.1    Joly, M.2    Moro, L.F.L.3
  • 6
    • 79952786364 scopus 로고    scopus 로고
    • Petroleum refining operations: key issues, advances, and opportunities
    • Shah NK, Li Z, Ierapetritou MG. Petroleum refining operations: key issues, advances, and opportunities. Ind Eng Chem Res. 2011;50(3):1161–1170.
    • (2011) Ind Eng Chem Res. , vol.50 , Issue.3 , pp. 1161-1170
    • Shah, N.K.1    Li, Z.2    Ierapetritou, M.G.3
  • 7
    • 84876983339 scopus 로고    scopus 로고
    • Refinery planning and scheduling: an overview
    • In, Bjørndal E, Bjørndal M, Pardalos PM, Rönnqvist M, editors., Berlin, Springer
    • Bengtsson J, Nonås S-L. Refinery planning and scheduling: an overview. In: Bjørndal E, Bjørndal M, Pardalos PM, Rönnqvist M, editors. Energy, Natural Resources and Environmental Economics. Berlin: Springer, 2010:115–130.
    • (2010) Energy, Natural Resources and Environmental Economics , pp. 115-130
    • Bengtsson, J.1    Nonås, S.-L.2
  • 10
    • 0030191906 scopus 로고    scopus 로고
    • Refinery operation and control: a future vision
    • Pelham R, Pharris C. Refinery operation and control: a future vision. Hydrocarb Proces. 1996;75(7):89–94.
    • (1996) Hydrocarb Proces. , vol.75 , Issue.7 , pp. 89-94
    • Pelham, R.1    Pharris, C.2
  • 13
    • 84990247424 scopus 로고    scopus 로고
    • Haverly Systems
    • Haverly Systems. GRTMPS [computer program]. Haverly Systems; 2015.
    • (2015) GRTMPS [computer program]
  • 14
    • 0000393388 scopus 로고    scopus 로고
    • A planning model for refinery diesel production
    • Moro LFL, Zanin AC, Pinto JM. A planning model for refinery diesel production. Comp Chem Eng. 1998;22:S1039–S1042.
    • (1998) Comp Chem Eng. , vol.22 , pp. S1039-S1042
    • Moro, L.F.L.1    Zanin, A.C.2    Pinto, J.M.3
  • 15
    • 0009671415 scopus 로고    scopus 로고
    • A planning model for petroleum refineries
    • Pinto JM, Moro LFL. A planning model for petroleum refineries. Brazil J Chem Eng. 2000;17:575–586.
    • (2000) Brazil J Chem Eng. , vol.17 , pp. 575-586
    • Pinto, J.M.1    Moro, L.F.L.2
  • 16
    • 0742285776 scopus 로고    scopus 로고
    • Formulating production planning models
    • Kelly JD. Formulating production planning models. Chem Eng Prog. 2004;100:43–50.
    • (2004) Chem Eng Prog. , vol.100 , pp. 43-50
    • Kelly, J.D.1
  • 17
    • 23944440500 scopus 로고    scopus 로고
    • Integrating CDU, FCC and product blending models into refinery planning
    • Li W, Hui C-W, Li A. Integrating CDU, FCC and product blending models into refinery planning. Comp Chem Eng. 2005;29(9):2010–2028.
    • (2005) Comp Chem Eng. , vol.29 , Issue.9 , pp. 2010-2028
    • Li, W.1    Hui, C.-W.2    Li, A.3
  • 18
    • 79952419388 scopus 로고    scopus 로고
    • A nonlinear programming model for refinery planning and optimisation with rigorous process models and product quality specifications
    • Alhajri I, Elkamel A, Albahri T, Douglas PL. A nonlinear programming model for refinery planning and optimisation with rigorous process models and product quality specifications. Int J Oil Gas Coal Technol. 2008;1(3):283–307.
    • (2008) Int J Oil Gas Coal Technol. , vol.1 , Issue.3 , pp. 283-307
    • Alhajri, I.1    Elkamel, A.2    Albahri, T.3    Douglas, P.L.4
  • 19
    • 37849188054 scopus 로고    scopus 로고
    • Effective MILP model for oil refinery-wide production planning and better energy utilization
    • Zhang BJ, Hua B. Effective MILP model for oil refinery-wide production planning and better energy utilization. J Clean Prod. 2007;15(5):439–448.
    • (2007) J Clean Prod. , vol.15 , Issue.5 , pp. 439-448
    • Zhang, B.J.1    Hua, B.2
  • 20
    • 61649115681 scopus 로고    scopus 로고
    • Integrated model for refinery planning, oil procuring, and product distribution
    • Guyonnet P, Grant FH, Bagajewicz MJ. Integrated model for refinery planning, oil procuring, and product distribution. Ind Eng Chem Res. 2009;48(1):463–482.
    • (2009) Ind Eng Chem Res. , vol.48 , Issue.1 , pp. 463-482
    • Guyonnet, P.1    Grant, F.H.2    Bagajewicz, M.J.3
  • 21
    • 79960027548 scopus 로고    scopus 로고
    • Integration of nonlinear crude distillation unit models in refinery planning optimization
    • Alattas AM, Grossmann IE, Palou-Rivera I. Integration of nonlinear crude distillation unit models in refinery planning optimization. Ind Eng Chem Res. 2011;50(11):6860–6870.
    • (2011) Ind Eng Chem Res. , vol.50 , Issue.11 , pp. 6860-6870
    • Alattas, A.M.1    Grossmann, I.E.2    Palou-Rivera, I.3
  • 22
    • 84862282229 scopus 로고    scopus 로고
    • Inferential monitoring and optimization of crude separation units via hybrid models
    • Mahalec V, Sanchez Y. Inferential monitoring and optimization of crude separation units via hybrid models. Comp Chem Eng. 2012;45:15–26.
    • (2012) Comp Chem Eng. , vol.45 , pp. 15-26
    • Mahalec, V.1    Sanchez, Y.2
  • 23
    • 84896518583 scopus 로고    scopus 로고
    • Nonlinear production planning of oil-refinery units for the future fuel market in Brazil: process design scenario-based model
    • Menezes BC, Moro LFL, Lin WO, Medronho RA, Pessoa FLP. Nonlinear production planning of oil-refinery units for the future fuel market in Brazil: process design scenario-based model. Ind Eng Chem Res. 2014;53(11):4352–4365.
    • (2014) Ind Eng Chem Res. , vol.53 , Issue.11 , pp. 4352-4365
    • Menezes, B.C.1    Moro, L.F.L.2    Lin, W.O.3    Medronho, R.A.4    Pessoa, F.L.P.5
  • 24
    • 84921927323 scopus 로고    scopus 로고
    • A multi-period mathematical model for simultaneous optimization of materials and energy on the refining site scale
    • Zhang BJ, Liu K, Luo XL, Chen QL, Li WK. A multi-period mathematical model for simultaneous optimization of materials and energy on the refining site scale. Appl Energ. 2015;143:238–250.
    • (2015) Appl Energ. , vol.143 , pp. 238-250
    • Zhang, B.J.1    Liu, K.2    Luo, X.L.3    Chen, Q.L.4    Li, W.K.5
  • 25
    • 80053896781 scopus 로고    scopus 로고
    • A new Lagrangian decomposition approach applied to the integration of refinery planning and crude-oil scheduling
    • Mouret S, Grossmann IE, Pestiaux P. A new Lagrangian decomposition approach applied to the integration of refinery planning and crude-oil scheduling. Comp Chem Eng. 2011;35(12):2750–2766.
    • (2011) Comp Chem Eng. , vol.35 , Issue.12 , pp. 2750-2766
    • Mouret, S.1    Grossmann, I.E.2    Pestiaux, P.3
  • 26
    • 84891453494 scopus 로고    scopus 로고
    • Improved swing-cut modeling for planning and scheduling of oil-refinery distillation units
    • Menezes BC, Kelly JD, Grossmann IE. Improved swing-cut modeling for planning and scheduling of oil-refinery distillation units. Ind Eng Chem Res. 2013;52(51):18324–18333.
    • (2013) Ind Eng Chem Res. , vol.52 , Issue.51 , pp. 18324-18333
    • Menezes, B.C.1    Kelly, J.D.2    Grossmann, I.E.3
  • 27
    • 47849120499 scopus 로고    scopus 로고
    • Multisite facility network integration design and coordination: an application to the refining industry
    • Al-Qahtani K, Elkamel A. Multisite facility network integration design and coordination: an application to the refining industry. Comp Chem Eng. 2008;32(10):2189–2202.
    • (2008) Comp Chem Eng. , vol.32 , Issue.10 , pp. 2189-2202
    • Al-Qahtani, K.1    Elkamel, A.2
  • 28
    • 61649093294 scopus 로고    scopus 로고
    • Multisite refinery and petrochemical network design: optimal integration and coordination
    • Al-Qahtani K, Elkamel A. Multisite refinery and petrochemical network design: optimal integration and coordination. Ind Eng Chem Res. 2009;48(2):814–826.
    • (2009) Ind Eng Chem Res. , vol.48 , Issue.2 , pp. 814-826
    • Al-Qahtani, K.1    Elkamel, A.2
  • 29
    • 84921871793 scopus 로고    scopus 로고
    • Rolling detailed short-term planning of oil refineries and petrochemical complexes and optimization model updating
    • Baulin ES, Boronin AB, Khokhlov AS. Rolling detailed short-term planning of oil refineries and petrochemical complexes and optimization model updating. Autom Remote Control. 2015;76(1):139–148.
    • (2015) Autom Remote Control. , vol.76 , Issue.1 , pp. 139-148
    • Baulin, E.S.1    Boronin, A.B.2    Khokhlov, A.S.3
  • 31
    • 22244482226 scopus 로고    scopus 로고
    • Analytical optimisation of industrial systems and applications to refineries, petrochemicals
    • Sadhukhan J, Zhang N, Zhu XX. Analytical optimisation of industrial systems and applications to refineries, petrochemicals. Chem Eng Sci. 2004;59(20):4169–4192.
    • (2004) Chem Eng Sci. , vol.59 , Issue.20 , pp. 4169-4192
    • Sadhukhan, J.1    Zhang, N.2    Zhu, X.X.3
  • 32
    • 0036502482 scopus 로고    scopus 로고
    • Consider over-the-fence product stream swapping to raise profitability
    • Swaty TE. Consider over-the-fence product stream swapping to raise profitability. Hydrocarb Process. 2002;81:37–42.
    • (2002) Hydrocarb Process. , vol.81 , pp. 37-42
    • Swaty, T.E.1
  • 33
    • 84905960935 scopus 로고    scopus 로고
    • Process data analytics in the era of big data
    • Qin SJ. Process data analytics in the era of big data. AIChE J. 2014;60(9):3092–3100.
    • (2014) AIChE J. , vol.60 , Issue.9 , pp. 3092-3100
    • Qin, S.J.1
  • 34
    • 0032069959 scopus 로고    scopus 로고
    • Product design through multivariate statistical analysis of process data
    • Jaeckle CM, Macgregor JF. Product design through multivariate statistical analysis of process data. AIChE J. 1998;44(5):1105–1118.
    • (1998) AIChE J. , vol.44 , Issue.5 , pp. 1105-1118
    • Jaeckle, C.M.1    Macgregor, J.F.2
  • 35
    • 0029703047 scopus 로고    scopus 로고
    • Experiences with industrial applications of projection methods for multivariate statistical process control
    • Kourti T, Lee J, Macgregor JF. Experiences with industrial applications of projection methods for multivariate statistical process control. Comp Chem Eng. 1996;20(Suppl. 1):S745–S750.
    • (1996) Comp Chem Eng. , vol.20 , pp. S745-S750
    • Kourti, T.1    Lee, J.2    Macgregor, J.F.3
  • 36
    • 0028905904 scopus 로고
    • Process analysis, monitoring and diagnosis, using multivariate projection methods
    • Kourti T, MacGregor JF. Process analysis, monitoring and diagnosis, using multivariate projection methods. Chemomet Intell Lab Syst. 1995;28(1):3–21.
    • (1995) Chemomet Intell Lab Syst. , vol.28 , Issue.1 , pp. 3-21
    • Kourti, T.1    MacGregor, J.F.2
  • 37
    • 84889604438 scopus 로고    scopus 로고
    • Modeling and monitoring of nonlinear multi-mode processes
    • Zhang Y, Li S. Modeling and monitoring of nonlinear multi-mode processes. Control Eng Pract. 2014;22:194–204.
    • (2014) Control Eng Pract. , vol.22 , pp. 194-204
    • Zhang, Y.1    Li, S.2
  • 38
    • 84875951353 scopus 로고    scopus 로고
    • GloMIQO: global mixed-integer quadratic optimizer
    • Misener R, Floudas C. GloMIQO: global mixed-integer quadratic optimizer. J Glob Optim. 2013;57(1):3–50.
    • (2013) J Glob Optim. , vol.57 , Issue.1 , pp. 3-50
    • Misener, R.1    Floudas, C.2
  • 39
    • 84903200433 scopus 로고    scopus 로고
    • ANTIGONE: algorithms for coNTinuous/integer global optimization of nonlinear equations
    • Misener R, Floudas C. ANTIGONE: algorithms for coNTinuous/integer global optimization of nonlinear equations. J Glob Optim. 2014;59(2–3):503–526.
    • (2014) J Glob Optim. , vol.59 , Issue.2-3 , pp. 503-526
    • Misener, R.1    Floudas, C.2
  • 40
    • 84901481760 scopus 로고    scopus 로고
    • A framework for globally optimizing mixed-integer signomial programs
    • Misener R, Floudas C. A framework for globally optimizing mixed-integer signomial programs. J Optim Theory Appl. 2014;161(3):905–932.
    • (2014) J Optim Theory Appl. , vol.161 , Issue.3 , pp. 905-932
    • Misener, R.1    Floudas, C.2
  • 41
    • 84923604788 scopus 로고    scopus 로고
    • Dynamically generated cutting planes for mixed-integer quadratically constrained quadratic programs and their incorporation into GloMIQO 2
    • Misener R, Smadbeck JB, Floudas CA. Dynamically generated cutting planes for mixed-integer quadratically constrained quadratic programs and their incorporation into GloMIQO 2. Optim Method Software. 2014;30(1):215–249.
    • (2014) Optim Method Software. , vol.30 , Issue.1 , pp. 215-249
    • Misener, R.1    Smadbeck, J.B.2    Floudas, C.A.3
  • 42
    • 0002538009 scopus 로고
    • Distillation equipment in the oil refining industry
    • Packie J. Distillation equipment in the oil refining industry. AIChE Trans. 1941;37(51):51–78.
    • (1941) AIChE Trans. , vol.37 , Issue.51 , pp. 51-78
    • Packie, J.1
  • 44
    • 0033226280 scopus 로고    scopus 로고
    • Choosing cutpoints to optimize product yields: refining developments: special report
    • Brooks RW, Van-Walsem FD, Drury J. Choosing cutpoints to optimize product yields: refining developments: special report. Hydrocarb Process. 1999;78(11):53–60.
    • (1999) Hydrocarb Process. , vol.78 , Issue.11 , pp. 53-60
    • Brooks, R.W.1    Van-Walsem, F.D.2    Drury, J.3
  • 45
    • 82555204223 scopus 로고    scopus 로고
    • Improvements in petroleum refinery planning: 1. formulation of process models
    • Guerra OJ, Le Roux GAC. Improvements in petroleum refinery planning: 1. formulation of process models. Ind Eng Chem Res. 2011;50(23):13403–13418.
    • (2011) Ind Eng Chem Res. , vol.50 , Issue.23 , pp. 13403-13418
    • Guerra, O.J.1    Le Roux, G.A.C.2
  • 46
    • 82555204221 scopus 로고    scopus 로고
    • Improvements in petroleum refinery planning: 2. Case studies
    • Guerra OJ, Le Roux GAC. Improvements in petroleum refinery planning: 2. Case studies. Ind Eng Chem Res. 2011;50(23):13419–13426.
    • (2011) Ind Eng Chem Res. , vol.50 , Issue.23 , pp. 13419-13426
    • Guerra, O.J.1    Le Roux, G.A.C.2
  • 47
    • 0035853891 scopus 로고    scopus 로고
    • A simultaneous optimization strategy for overall integration in refinery planning
    • Zhang J, Zhu XX, Towler GP. A simultaneous optimization strategy for overall integration in refinery planning. Ind Eng Chem Res. 2001;40(12):2640–2653.
    • (2001) Ind Eng Chem Res. , vol.40 , Issue.12 , pp. 2640-2653
    • Zhang, J.1    Zhu, X.X.2    Towler, G.P.3
  • 48
    • 84984088471 scopus 로고
    • A general index of fractional distillation power for hydrocarbon mixtures
    • Geddes RL. A general index of fractional distillation power for hydrocarbon mixtures. AIChE J. 1958;4(4):389–392.
    • (1958) AIChE J. , vol.4 , Issue.4 , pp. 389-392
    • Geddes, R.L.1
  • 49
    • 84867085906 scopus 로고    scopus 로고
    • Refinery production planning: multiperiod MINLP with nonlinear CDU model
    • Alattas AM, Grossmann IE, Palou-Rivera I. Refinery production planning: multiperiod MINLP with nonlinear CDU model. Ind Eng Chem Res. 2012;51(39):12852–12861.
    • (2012) Ind Eng Chem Res. , vol.51 , Issue.39 , pp. 12852-12861
    • Alattas, A.M.1    Grossmann, I.E.2    Palou-Rivera, I.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.