메뉴 건너뛰기




Volumn 50, Issue 23, 2011, Pages 13403-13418

Improvements in petroleum refinery planning: 1. Formulation of process models

Author keywords

[No Author keywords available]

Indexed keywords

CRUDE DISTILLATION UNITS; ECONOMIC SUCCESS; EMPIRICAL MODEL; EMPIRICAL PROCESS; FCC UNITS; FLUID CATALYTIC CRACKING UNIT; MODEL PREDICTION; MODEL VALIDATION; PROCESS MODEL; PROCESS SIMULATORS; PRODUCTION PLANNING IS; REFINERY PLANNING;

EID: 82555204223     PISSN: 08885885     EISSN: 15205045     Source Type: Journal    
DOI: 10.1021/ie200303m     Document Type: Article
Times cited : (36)

References (22)
  • 2
    • 0000393388 scopus 로고    scopus 로고
    • A planning model for refinery diesel production
    • Moro, L. F.; Zanin, A. C.; Pinto, J. M. A planning model for refinery diesel production Comput. Chem. Eng. 1998, 22 (Suppl. 1) S1039-S1042
    • (1998) Comput. Chem. Eng. , vol.22 , Issue.SUPPL. 1
    • Moro, L.F.1    Zanin, A.C.2    Pinto, J.M.3
  • 4
    • 11344271173 scopus 로고    scopus 로고
    • Distinguish between scheduling and planning models
    • Hartmann, J. C. Distinguish between scheduling and planning models Hydrocarbon Process. 1998, 77 (7) 93-100 (Pubitemid 128570557)
    • (1998) Hydrocarbon Processing , vol.77 , Issue.7 , pp. 93-100
    • Hartmann, J.C.M.1
  • 5
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: An overview of issues in practice
    • Kreipl, S.; Pinedo, M. Planning and Scheduling in Supply Chains: An Overview of Issues in Practice Prod. Oper. Manage. 2004, 13 (1) 77-92 (Pubitemid 39374561)
    • (2004) Production and Operations Management , vol.13 , Issue.1 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 6
    • 30444434197 scopus 로고    scopus 로고
    • A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants
    • DOI 10.1021/ie050778z
    • Erdirik-Dogan, M.; Grossmann, I. E. A Decomposition Method for the Simultaneous Planning and Scheduling of Single-Stage Continuous Multiproduct Plants Ind. Eng. Chem. Res. 2006, 45 (1) 299-315 (Pubitemid 43075936)
    • (2006) Industrial and Engineering Chemistry Research , vol.45 , Issue.1 , pp. 299-315
    • Dogan, M.E.1    Grossmann, I.E.2
  • 7
    • 50649125115 scopus 로고    scopus 로고
    • Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines
    • Erdirik-Dogan, M.; Grossmann, I. E. Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines Comput. Chem. Eng. 2008, 32 (11) 2664-2683
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.11 , pp. 2664-2683
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 8
    • 67649708117 scopus 로고    scopus 로고
    • Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities
    • In; CACHE Corporation: Cambridge, MA
    • Maravelias, C. T.; Sung, C. Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities. In Proceedings, Foundations of Computer-Aided Process Operations (FOCAPO 2008); CACHE Corporation: Cambridge, MA, 2008; pp 13-22.
    • (2008) Proceedings, Foundations of Computer-Aided Process Operations (FOCAPO 2008) , pp. 13-22
    • Maravelias, C.T.1    Sung, C.2
  • 9
    • 0034287620 scopus 로고    scopus 로고
    • Planning and scheduling models for refinery operations
    • Pinto, J. M.; Joly, M.; Moro, L. F. Planning and scheduling models for refinery operations Comput. Chem. Eng. 2000, 24 (9-10) 2259-2276
    • (2000) Comput. Chem. Eng. , vol.24 , Issue.9-10 , pp. 2259-2276
    • Pinto, J.M.1    Joly, M.2    Moro, L.F.3
  • 10
    • 0742285776 scopus 로고    scopus 로고
    • Formulating Production Planning Models
    • Kelly, J. D. Formulating Production Planning Models Chem. Eng. Prog. 2004, 100 (1) 43-50
    • (2004) Chem. Eng. Prog. , vol.100 , Issue.1 , pp. 43-50
    • Kelly, J.D.1
  • 11
    • 35248883941 scopus 로고    scopus 로고
    • Improving the robustness and efficiency of crude scheduling algorithms
    • DOI 10.1002/aic.11280
    • Li, J.; Wenkai, L.; Karimi, I. A.; Srinivasan, R. Improving the Robustness and Efficiency of Crude Scheduling Algorithms AIChE J. 2007, 53, 2659-2680 (Pubitemid 47567857)
    • (2007) AIChE Journal , vol.53 , Issue.10 , pp. 2659-2680
    • Li, J.1    Li, W.2    Karimi, I.A.3    Srinivasan, R.4
  • 13
    • 0035925379 scopus 로고    scopus 로고
    • A Level-by-Level Debottlenecking Approach in Refinery Operation
    • Zhang, J.; Zhu, X.; Towler, G. A Level-by-Level Debottlenecking Approach in Refinery Operation Ind. Eng. Chem. Res. 2001, 40, 1528-1540
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 1528-1540
    • Zhang, J.1    Zhu, X.2    Towler, G.3
  • 14
    • 83255175186 scopus 로고    scopus 로고
    • Advances in crude oil LP modeling
    • Presented at the, October 1-3, 2001, Dallas, TX.
    • Trierwiler, L. Advances in crude oil LP modeling. Presented at the NPRA Computer Conference, October 1-3, 2001, Dallas, TX.
    • NPRA Computer Conference
    • Trierwiler, L.1
  • 15
    • 23944440500 scopus 로고    scopus 로고
    • Integrating CDU, FCC and product blending models into refinery planning
    • Li, W.; Hui, C.-W.; Li, A. Integrating CDU, FCC and product blending models into refinery planning Comput. Chem. Eng. 2005, 29 (9) 2010-2028
    • (2005) Comput. Chem. Eng. , vol.29 , Issue.9 , pp. 2010-2028
    • Li, W.1    Hui, C.-W.2    Li, A.3
  • 16
    • 82555193298 scopus 로고    scopus 로고
    • Petroleum Processing Overview
    • In, Vol. Hsu, C. S. Robinson, P. R. Springer Science: New York
    • Robinson, P. R. Petroleum Processing Overview. In Practical Advances in Petroleum Processing, Vol. 1; Hsu, C. S.; Robinson, P. R., Eds.; Springer Science: New York, 2006; pp 1-78.
    • (2006) Practical Advances in Petroleum Processing , vol.1 , pp. 1-78
    • Robinson, P.R.1
  • 20
    • 0016980819 scopus 로고
    • A Lumping and Reaction Scheme for Catalytic Cracking
    • Jacob, S. M.; Gross, B.; Weekmann, V. W. A Lumping and Reaction Scheme for Catalytic Cracking AIChE J. 1976, 22 (4) 701-713
    • (1976) AIChE J. , vol.22 , Issue.4 , pp. 701-713
    • Jacob, S.M.1    Gross, B.2    Weekmann, V.W.3
  • 21
    • 53549107735 scopus 로고    scopus 로고
    • A comprehensive estimation of kinetic parameters in lumped catalytic cracking reaction models
    • Hernández-Barajas, J. R.; Vázquez-Román, R.; Félix-Flores, M. A comprehensive estimation of kinetic parameters in lumped catalytic cracking reaction models Fuel 2009, 88 (1) 169-178
    • (2009) Fuel , vol.88 , Issue.1 , pp. 169-178
    • Hernández-Barajas, J.R.1    Vázquez-Román, R.2    Félix-Flores, M.3
  • 22
    • 79952419388 scopus 로고    scopus 로고
    • A Nonlinear Programming Model for Refinery Planning and Optimisation with Rigorous Process Models and Product Quality Specifications
    • Alhajri, I.; Elkamel, A.; Albahri, T.; Douglas, P. L. A Nonlinear Programming Model for Refinery Planning and Optimisation with Rigorous Process Models and Product Quality Specifications Int. J. Oil Gas Coal Technol. 2008, 1 (3) 283-307
    • (2008) Int. J. Oil Gas Coal Technol. , vol.1 , Issue.3 , pp. 283-307
    • Alhajri, I.1    Elkamel, A.2    Albahri, T.3    Douglas, P.L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.