-
1
-
-
0003036509
-
Optimization in refinery scheduling: Modeling and solution
-
T. A. Ciriani, and R. C. Leachman, Optimization in industry, vol. 3. New York: Wiley
-
(1993)
, pp. 191-199
-
-
Ballintjin, K.1
-
2
-
-
0007758057
-
-
PIMS (Process Industry Modeling System) User's manual. Version 6.0. Houston, TX: Bechtel Corp
-
(1993)
-
-
-
3
-
-
0007758059
-
Inventory management in blending optimization: Use of nonlinear optimization for gasoline blend planning and scheduling
-
ORSA/TIMS National Meeting, San Francisco (CA)
-
(1992)
-
-
Bodington, C.E.1
-
4
-
-
0007756647
-
-
Planning, scheduling, and control integration in the process industries. New York: McGraw Hill
-
(1995)
-
-
Bodington, C.E.1
-
6
-
-
0007807604
-
-
RPMS (Refinery and Petrochemical Modeling System): A system description. Houston, NY: Bonner and Moore Management Science
-
(1979)
-
-
Bonner1
Moore2
-
8
-
-
0009669780
-
Integrated planning and scheduling systems for the refining industry
-
T. A. Ciriani, and R. C. Leachman, Optimization in industry, vol. 2. (pp. 185-199) New York: Wiley
-
(1994)
, pp. 185-199
-
-
Coxhead, R.E.1
-
9
-
-
4243616656
-
Integrating off-line schedulers with real time optimizers
-
AIChE National Spring Meeting, paper 40a, Houston, TX
-
(1993)
-
-
Cutler, C.R.1
Ayala, J.S.2
-
10
-
-
0007097582
-
The pooling problem
-
T. A. Ciriani, and R. C. Leachman, Optimization in industry, vol. 3. (pp. 223-230) New York: Wiley
-
(1993)
, pp. 223-230
-
-
Fieldhouse, M.1
-
12
-
-
0007758890
-
-
IBM-OSL guide and reference (release 2). Kingston, NY
-
(1991)
-
-
-
16
-
-
0009665725
-
Bridging the gap - Integration of design, operations scheduling and control
-
D. W. T. Rippin, J. C. Hale, and J. F. Davis, Foundations of computer aided process operations (pp. 207-230) Austin, TX: CACHE
-
(1993)
, pp. 207-230
-
-
Macchietto, S.1
-
17
-
-
0007861087
-
-
SIPP - A solution for refinery scheduling. 1998 NPRA Computer Conference, National Petroleum Refiners' Association, November 16-18, San Antonio, TX
-
(1998)
-
-
Magalhaes, M.V.O.1
Moro, L.F.L.2
Smania, P.3
Hassimotto, M.K.4
Pinto, J.M.5
Abadia, G.J.6
-
20
-
-
0009703264
-
A mixed-integer model for short-term crude oil scheduling
-
AIChE Annual National Meeting, paper 241c. Miami Beach, FL
-
(1998)
-
-
Moro, L.F.L.1
Pinto, J.M.2
-
22
-
-
0007805679
-
-
A systematic approach for scheduling production in continuous processing systems. Ph.D. Thesis, University of Waterloo, Waterloo, Canada
-
(1989)
-
-
Picaseno-Gamiz, J.1
-
25
-
-
0007805680
-
-
A mixed-integer model for LPG scheduling. Accepted at the European Symposium on Computer Aided Process Engineering-ESCAPE-10, Florence. Italy
-
(2000)
-
-
Pinto, J.M.1
Moro, L.F.L.2
-
26
-
-
0007758893
-
-
Mixed-integer programming techniques for the scheduling of fuel oil and asphalt production. Accepted at the European Symposium on Computer Aided Process Engineering-ESCAPE-10, Florence,Italy
-
(2000)
-
-
Pinto, J.M.1
Joly, M.2
-
28
-
-
0007854062
-
The petroleum industry of the 21st Century
-
Foundations of computer aided process operations-FOCAPO 98, Snowmass, CO
-
(1998)
-
-
Ramage, M.P.1
-
29
-
-
0007853309
-
-
Overview of scheduling and planning of batch process operations. NATO Advanced Study Institute - Batch Process Systems Engineering, Antalya, Turkey
-
(1992)
-
-
Reklaitis, G.V.1
-
33
-
-
0007757965
-
-
Scheduling REVAP - Production scheduling system. System specification. V. 3.0, Petrobras Petroleo Brasileiro S/A, Rio de Janeiro, Brazil
-
(1997)
-
-
-
34
-
-
0007756648
-
Refinery scheduling using mixed integer LP and dynamic recursion
-
NPRA Computer conference, New Orleans, LA
-
(1997)
-
-
Steinschorn, D.1
Hofferl, F.2
-
36
-
-
0007805681
-
-
Linear programming: the solution of refinery problems. New York: Esso Standard Oil Company
-
(1955)
-
-
Symonds, G.H.1
|