-
2
-
-
78649359715
-
Life-cycle assessment modeling of construction processes for buildings
-
Bilec M, Ries R, Matthews H. 2010. Life-cycle assessment modeling of construction processes for buildings. J Infrastruct Syst. 16:199-205.
-
(2010)
J Infrastruct Syst
, vol.16
, pp. 199-205
-
-
Bilec, M.1
Ries, R.2
Matthews, H.3
-
3
-
-
33751074921
-
Example of a hybrid life-cycle assessment of construction processes
-
Bilec M, Ries R, Matthews H, Sharrard A. 2006. Example of a hybrid life-cycle assessment of construction processes. J Infrastruct Syst. 12:207-215.
-
(2006)
J Infrastruct Syst
, vol.12
, pp. 207-215
-
-
Bilec, M.1
Ries, R.2
Matthews, H.3
Sharrard, A.4
-
4
-
-
0030406151
-
Construction waste: Quantification and source evaluation
-
Bossink B, Brouwers H. 1996. Construction waste: quantification and source evaluation. J Constr Eng Manage. 122:55-60.
-
(1996)
J Constr Eng Manage
, vol.122
, pp. 55-60
-
-
Bossink, B.1
Brouwers, H.2
-
5
-
-
84988356958
-
-
Proceedings of IGLC-20, San Diego, CA
-
Celep O, Yong-Woo K, John H, Seungheon H. 2012. Implementing lean Six Sigma: a case study in concrete panel production. Proceedings of IGLC-20, San Diego, CA.
-
(2012)
Implementing lean Six Sigma: A case study in concrete panel production
-
-
Celep, O.1
Yong-Woo, K.2
John, H.3
Seungheon, H.4
-
6
-
-
84988356954
-
-
Online at:, editor, 1998
-
Franklin Associates. 1998. The Franklin USLCI Library 98. Online at: http://www.fal.com/and http://www.sylvatica.com/, editor, 1998.
-
(1998)
The Franklin USLCI Library 98
-
-
-
8
-
-
19944425112
-
The ecoinvent database: Overview and methodological framework (7 pp)
-
Frischknecht R, Jungbluth N, Althaus H, Doka G, Dones R, Heck T, Hellweg, S, Hischier, R, Nemeck, T, Rebitzer, G, Spielmann, M. (2005). The ecoinvent database: overview and methodological framework (7 pp). Int J Life Cycle Assess. 2005;10:3-9.
-
(2005)
Int J Life Cycle Assess
, vol.10
, pp. 3-9
-
-
Frischknecht, R.1
Jungbluth, N.2
Althaus, H.3
Doka, G.4
Dones, R.5
Heck, T.6
Hellweg, S.7
Hischier, R.8
Nemeck, T.9
Rebitzer, G.10
Spielmann, M.11
-
9
-
-
78649932252
-
Lean construction submittal process
-
Garrett D, Lee J. 2011. Lean construction submittal process. Qual Eng. 23:84-93.
-
(2011)
Qual Eng
, vol.23
, pp. 84-93
-
-
Garrett, D.1
Lee, J.2
-
10
-
-
20844439588
-
Comparison of environmental effects of steel- and concrete-framed buildings
-
Guggemos A, Horvath A. 2005. Comparison of environmental effects of steel- and concrete-framed buildings. J Infrastruct Syst. 11:93-101.
-
(2005)
J Infrastruct Syst
, vol.11
, pp. 93-101
-
-
Guggemos, A.1
Horvath, A.2
-
11
-
-
37249083919
-
Six Sigma-based approach to improve performance in construction operations
-
Han S, Chae M, Im K, Ryu H. 2008. Six Sigma-based approach to improve performance in construction operations. J Manage Eng. 24:21-31.
-
(2008)
J Manage Eng
, vol.24
, pp. 21-31
-
-
Han, S.1
Chae, M.2
Im, K.3
Ryu, H.4
-
13
-
-
84866088721
-
A lean modeling protocol for evaluating green project delivery
-
Klotz L, Horman M, Bodenschatz M. 2007. A lean modeling protocol for evaluating green project delivery. Lean Constr J. 3:1-18.
-
(2007)
Lean Constr J
, vol.3
, pp. 1-18
-
-
Klotz, L.1
Horman, M.2
Bodenschatz, M.3
-
14
-
-
33748796091
-
Lean processes for sustainable project delivery
-
Lapinski A, Horman M, Riley D. 2006. Lean processes for sustainable project delivery. J Constr Eng Manage. 132:1083-1091.
-
(2006)
J Constr Eng Manage
, vol.132
, pp. 1083-1091
-
-
Lapinski, A.1
Horman, M.2
Riley, D.3
-
15
-
-
70350608153
-
An LCA-based environmental impact assessment model for construction processes
-
Li X, Zhu Y, Zhang Z. 2010. An LCA-based environmental impact assessment model for construction processes. Building Environ. 45:766-775.
-
(2010)
Building Environ
, vol.45
, pp. 766-775
-
-
Li, X.1
Zhu, Y.2
Zhang, Z.3
-
16
-
-
76149103960
-
-
New Delhi, India: Dorling Kindersley
-
Munro R, Maio M, Nawaz M, Ramu G, Zrymiak D. 2008. The certified Six Sigma Green belt. New Delhi, India: Dorling Kindersley.
-
(2008)
The certified Six Sigma Green belt
-
-
Munro, R.1
Maio, M.2
Nawaz, M.3
Ramu, G.4
Zrymiak, D.5
-
18
-
-
0003485315
-
-
How GE, Motorola, and other top companies are honing their performance. New York: McGraw-Hill
-
Pande P, Neuman R, Cavanaqh R. 2000. The Six Sigma way. How GE, Motorola, and other top companies are honing their performance. New York: McGraw-Hill.
-
(2000)
The Six Sigma way
-
-
Pande, P.1
Neuman, R.2
Cavanaqh, R.3
-
19
-
-
84856655328
-
Value stream mapping in construction: A case study in a Brazilian construction company
-
Kenley, R. (Ed.), 13th International Group for Lean Construction Conference: Proceedings, Sydney
-
Pasqualini F, Zawislak P. 2005. Value stream mapping in construction: A case study in a Brazilian construction company. in: Kenley, R. (Ed.), 13th International Group for Lean Construction Conference: Proceedings. International Group on Lean Construction, Sydney, pp. 117-125.
-
(2005)
International Group on Lean Construction
, pp. 117-125
-
-
Pasqualini, F.1
Zawislak, P.2
-
20
-
-
13944279570
-
Implementing and applying Six Sigma in construction
-
Pheng L, Hui M. 2004. Implementing and applying Six Sigma in construction. J Constr Eng Manage. 130:482-489.
-
(2004)
J Constr Eng Manage
, vol.130
, pp. 482-489
-
-
Pheng, L.1
Hui, M.2
-
21
-
-
3242699509
-
Reducing building waste at construction sites in Hong Kong
-
Poon C, Yu A, Jaillon L. 2004. Reducing building waste at construction sites in Hong Kong. Constr Manage Econom. 22:461-470.
-
(2004)
Constr Manage Econom
, vol.22
, pp. 461-470
-
-
Poon, C.1
Yu, A.2
Jaillon, L.3
-
23
-
-
77956930300
-
-
The Netherlands: PRé Consultants and Sylvatica
-
PRé Consultants. 2008b. SimaPro7.0 Software. The Netherlands: PRé Consultants and Sylvatica.
-
(2008)
SimaPro7.0 Software
-
-
-
24
-
-
14744289522
-
Labor productivity drivers and opportunities in the construction industry
-
Rojas E, Aramvareekul P. 2003. Labor productivity drivers and opportunities in the construction industry. J Manage Eng. 19:78-82.
-
(2003)
J Manage Eng
, vol.19
, pp. 78-82
-
-
Rojas, E.1
Aramvareekul, P.2
-
27
-
-
56449124271
-
Estimating construction project environmental effects using an input-output-based hybrid lifecycle assessment model
-
Sharrard A, Matthews H, Ries R. 2008. Estimating construction project environmental effects using an input-output-based hybrid lifecycle assessment model. J Infrastruct Syst. 14:327-336.
-
(2008)
J Infrastruct Syst
, vol.14
, pp. 327-336
-
-
Sharrard, A.1
Matthews, H.2
Ries, R.3
-
28
-
-
33646437258
-
Six-Sigma as a strategy for process improvement on construction projects: A case study
-
Stewart A, and Spencer, A. 2006. Six-Sigma as a strategy for process improvement on construction projects: a case study. Constr Manage Econom. 24:339-348.
-
(2006)
Constr Manage Econom
, vol.24
, pp. 339-348
-
-
Stewart, A.1
Spencer, A.2
-
29
-
-
40849086243
-
On the effectiveness in implementing a waste-management-plan method in construction
-
Tam V. 2008. On the effectiveness in implementing a waste-management-plan method in construction. Waste Manage. 28:1072-1080.
-
(2008)
Waste Manage
, vol.28
, pp. 1072-1080
-
-
Tam, V.1
-
32
-
-
84875385556
-
-
Washington, DC: U.S. Department of Commerce
-
U.S. Department of Commerce. 2012. Gross domestic product (GDP) By Industry Data. Washington, DC: U.S. Department of Commerce.
-
(2012)
Gross domestic product (GDP) By Industry Data
-
-
-
36
-
-
84988364894
-
-
Washington, DC: EPA
-
U.S. Environmental Protection Agency. 2011. Fine particle (PM2.5) designations. Washington, DC: EPA.
-
(2011)
Fine particle (PM2.5) designations
-
-
|