메뉴 건너뛰기




Volumn 23, Issue 1, 2011, Pages 84-93

Lean construction submittal processa case study

Author keywords

construction submittals; lead time; lean; metrics; value stream mapping; waste

Indexed keywords

CONSTRUCTION FIELDS; CONSTRUCTION SCHEDULES; IN-PROCESS; LEAD TIME; LEAN; LEAN CONCEPTS; LEAN CONSTRUCTION; LEAN TOOLS; LEVEE CONSTRUCTION; METRICS; PROJECT ENGINEERS; REVIEW PROCESS; VALUE STREAM MAPPING;

EID: 78649932252     PISSN: 08982112     EISSN: 15324222     Source Type: Journal    
DOI: 10.1080/08982112.2010.495100     Document Type: Article
Times cited : (26)

References (15)
  • 1
    • 78649945032 scopus 로고    scopus 로고
    • Available at:, accessed November 3, 2010
    • Bodek, N. (2007). The ninth waste-Saying no. Available at: http://www.industryweek.com (accessed November 3, 2010).
    • (2007) The Ninth Waste-Saying No
    • Bodek, N.1
  • 7
    • 78649967863 scopus 로고    scopus 로고
    • Shop drawings-Learning to live with this necessary evil
    • Available at:, accessed November 3, 2010
    • O'Leary, A. (2003). Shop drawings-Learning to live with this necessary evil. Design Cost Data. Available at: http://www.dcd.com/oleary/oleary-marapr- 2003.html (accessed November 3, 2010).
    • (2003) Design Cost Data
    • O'Leary, A.1
  • 10
    • 84992103493 scopus 로고    scopus 로고
    • Enlisting Lean Six Sigma in the Army acquisition process
    • Available at:, accessed November 3, 2010
    • Smith, L., Wilson, R., Burke, T. (2008). Enlisting Lean Six Sigma in the Army acquisition process. Defense and AT-L. Available at: http://findarticles. com/p/articles/mi-m0QME/is-2-37/ai-n25353837/(accessed November 3, 2010)
    • (2008) Defense and AT-L
    • Smith, L.1    Wilson, R.2    Burke, T.3
  • 12
    • 78649922766 scopus 로고    scopus 로고
    • Toronto, Canada: Productive Publications
    • Thompson, J. (1997). The Lean Office. Toronto, Canada: Productive Publications.
    • (1997) The Lean Office
    • Thompson, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.